Proposal:H.015309.6
Parish:Tangipahoa
Routes:US 51
Description:US 51: 2nd ST - LA 16
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$3,795,086.95
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $2,728,652.28 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,259,787.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" Equiv. CMPA) | 117 | LNFT | 10.00 | 1,170.00 | 45.00 | 5,265.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 196 | CUYD | 100.00 | 19,600.00 | 1.00 | 196.00 | | 0003 | 203-10-00100 | Cleaning Existing Ditches | 400 | LNFT | 5.50 | 2,200.00 | 8.00 | 3,200.00 | | 0004 | 204-05-00050 | Temporary Sediment Check Dams 223+72 & 223+82 | 4 | EACH | 290.30 | 1,161.20 | 290.00 | 1,160.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 410 | LNFT | 3.15 | 1,291.50 | 3.15 | 1,291.50 | | 0006 | 502-01-00100 | Asphalt Concrete | 15,777.1 | TON | 97.00 | 1,530,378.70 | 122.00 | 1,924,806.20 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,514.2 | TON | 1.00 | 1,514.20 | 1.00 | 1,514.20 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 142,569 | SQYD | 1.70 | 242,367.30 | 2.40 | 342,165.60 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,940 | CUYD | 0.01 | -59.40 | 0.01 | -59.40 | | 0010 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 51 | SQYD | 315.00 | 16,065.00 | 220.00 | 11,220.00 | | 0011 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) (Blow Up Repair Patching) | 176 | SQYD | 237.00 | 41,712.00 | 235.00 | 41,360.00 | | 0012 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 474 | SQYD | 115.00 | 54,510.00 | 110.00 | 52,140.00 | | 0013 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) (Blow Up Repair Patching) | 341 | SQYD | 148.00 | 50,468.00 | 250.00 | 85,250.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 182 | SQYD | 82.00 | 14,924.00 | 135.00 | 24,570.00 | | 0015 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 120 | LNFT | 455.00 | 54,600.00 | 350.00 | 42,000.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 267,000.00 | 267,000.00 | 225,000.00 | 225,000.00 | | 0017 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 180 | LNFT | 0.15 | 27.00 | 0.15 | 27.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 120 | LNFT | 0.45 | 54.00 | 0.45 | 54.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.312 | MILE | 350.00 | 4,309.20 | 320.00 | 3,939.84 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.01 | MILE | 450.00 | 4,954.50 | 450.00 | 4,954.50 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.328 | MILE | 750.00 | 21,246.00 | 1.00 | 28.33 | | 0022 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 50.00 | 100.00 | 50.00 | 100.00 | | 0023 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 2,800.00 | 16,800.00 | 10,250.00 | 61,500.00 | | 0024 | 724-01-00100 | Rumble Strips (Centerline) | 4.207 | MILE | 1,000.00 | 4,207.00 | 270.00 | 1,135.89 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.415 | MILE | 1,000.00 | 8,415.00 | 270.00 | 2,272.05 | | 0026 | 726-01-00100 | Bedding Material (6" Thickness) | 13.3 | CUYD | 65.00 | 864.50 | 100.00 | 1,330.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 205,000.00 | 205,000.00 | 228,000.00 | 228,000.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,487 | EACH | 4.50 | 6,691.50 | 4.50 | 6,691.50 | | 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 90 | LNFT | 4.00 | 360.00 | 4.00 | 360.00 | | 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 60 | LNFT | 12.00 | 720.00 | 12.00 | 720.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.164 | MILE | 4,200.00 | 59,488.80 | 4,200.00 | 59,488.80 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.505 | MILE | 1,200.00 | 6,606.00 | 1,200.00 | 6,606.00 | | 0033 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.303 | MILE | 6,000.00 | 1,818.00 | 6,000.00 | 1,818.00 | | 0034 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 900.00 | 900.00 | 900.00 | 900.00 | | 0035 | 735-01-00100 | Mailboxes | 69 | EACH | 1.00 | 69.00 | 20.00 | 1,380.00 | | 0036 | 735-02-00100 | Mailbox Supports (Single) | 69 | EACH | 170.00 | 11,730.00 | 250.00 | 17,250.00 | | 0037 | 736-09-00100 | Loop Detector | 300 | LNFT | 35.10 | 10,530.00 | 35.10 | 10,530.00 | | 0038 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 1,398.38 | 2,796.76 | 1,400.00 | 2,800.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 4.477 | ACRE | 2,810.48 | 12,582.52 | 2,815.00 | 12,602.76 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0041 | NS-602-00011 | Expansion Joint Rehabilitation | 564 | LNFT | 70.00 | 39,480.00 | 105.00 | 59,220.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,728,652.28 | | 3,259,787.77 |
|