Proposal:H.015251.6
Parish:East Baton Rouge
Routes:LA 3006
Description:LA 3006: LA 19 - LA 67
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$6,315,923.70
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $7,383,317.95 |
| 2 | 73475 | Madden Gulf Coast, LLC | $8,742,184.55 |
| 3 | 06276 | Barriere Construction Co., LLC | $9,929,873.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Madden Gulf Coast, LLC | - 3 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions BRICK MAILBOX STA 69+14, CONCRETE PILE STA 20+82 | 1 | LUMP | 8,500.00 | 8,500.00 | 7,360.00 | 7,360.00 | 8,800.00 | 8,800.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 800.00 | 1,600.00 | 690.00 | 1,380.00 | 1,000.00 | 2,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 242 | LNFT | 20.00 | 4,840.00 | 20.00 | 4,840.00 | 15.00 | 3,630.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,192 | SQYD | 20.00 | 23,840.00 | 20.00 | 23,840.00 | 40.00 | 47,680.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 50 | LNFT | 40.00 | 2,000.00 | 40.00 | 2,000.00 | 35.00 | 1,750.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 42" CMP | 56 | LNFT | 42.00 | 2,352.00 | 38.00 | 2,128.00 | 45.00 | 2,520.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 54" RCP, 54" CMP | 120 | LNFT | 53.00 | 6,360.00 | 47.00 | 5,640.00 | 45.00 | 5,400.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RPVCP | 72 | LNFT | 22.00 | 1,584.00 | 20.00 | 1,440.00 | 45.00 | 3,240.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 54" RPVCP, 60"CMP, 96" CMPA | 360 | LNFT | 55.00 | 19,800.00 | 47.00 | 16,920.00 | 45.00 | 16,200.00 | | 0010 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 4,000.00 | 4,000.00 | 3,493.00 | 3,493.00 | 5,000.00 | 5,000.00 | | 0011 | 202-02-38100 | Removal of Shoulder Drains | 60 | LNFT | 25.00 | 1,500.00 | 23.00 | 1,380.00 | 5.00 | 300.00 | | 0012 | 203-03-00100 | Embankment | 7 | CUYD | 200.00 | 1,400.00 | 200.00 | 1,400.00 | 700.00 | 4,900.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 164 | CUYD | 200.00 | 32,800.00 | 170.00 | 27,880.00 | 279.00 | 45,756.00 | | 0014 | 203-10-00100 | Cleaning Existing Ditches | 320 | LNFT | 12.00 | 3,840.00 | 12.00 | 3,840.00 | 12.00 | 3,840.00 | | 0015 | 204-02-00100 | Temporary Hay Bales | 14 | EACH | 55.00 | 770.00 | 51.00 | 714.00 | 51.00 | 714.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 4.50 | 1,350.00 | 4.00 | 1,200.00 | 4.50 | 1,350.00 | | 0017 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 36,762 | SQYD | 19.00 | 698,478.00 | 25.00 | 919,050.00 | 22.50 | 827,145.00 | | 0018 | 304-01-00100 | Lime | 781.7 | TON | 245.00 | 191,516.50 | 400.00 | 312,680.00 | 529.00 | 413,519.30 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 18,381 | SQYD | 2.00 | 36,762.00 | 13.00 | 238,953.00 | 4.50 | 82,714.50 | | 0021 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 36,762 | SQYD | 20.00 | 735,240.00 | 16.00 | 588,192.00 | 28.00 | 1,029,336.00 | | 0022 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 368 | CUYD | 110.00 | 40,480.00 | 172.00 | 63,296.00 | 176.00 | 64,768.00 | | 0023 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 300 | CUYD | 110.00 | 33,000.00 | 107.00 | 32,100.00 | 1.00 | 300.00 | | 0024 | 502-01-00100 | Asphalt Concrete | 13,115.3 | TON | 157.00 | 2,059,102.10 | 160.00 | 2,098,448.00 | 182.50 | 2,393,542.25 | | 0025 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,245.2 | TON | 250.00 | 311,300.00 | 50.00 | 62,260.00 | 382.00 | 475,666.40 | | 0026 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 24,101 | GAL | 5.00 | 120,505.00 | 5.00 | 120,505.00 | 4.62 | 111,346.62 | | 0027 | 507-02-00200 | Aggregate (S2) | 35,442 | SQYD | 6.00 | 212,652.00 | 6.25 | 221,512.50 | 5.25 | 186,070.50 | | 0028 | 507-02-00300 | Aggregate (S3) | 35,442 | SQYD | 5.75 | 203,791.50 | 6.00 | 212,652.00 | 5.75 | 203,791.50 | | 0029 | 509-01-00100 | Milling Asphalt Pavement | 35,549 | SQYD | 8.00 | 284,392.00 | 13.00 | 462,137.00 | 14.00 | 497,686.00 | | 0030 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,349 | CUYD | 0.00 | 0.00 | 0.01 | -33.49 | 0.01 | -33.49 | | 0031 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 271 | LNFT | 7.00 | 1,897.00 | 10.00 | 2,710.00 | 22.00 | 5,962.00 | | 0032 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 210 | LNFT | 7.00 | 1,470.00 | 11.00 | 2,310.00 | 22.00 | 4,620.00 | | 0033 | 602-03-00100 | Cleaning and Sealing Random Cracks | 50 | LNFT | 25.00 | 1,250.00 | 9.00 | 450.00 | 25.00 | 1,250.00 | | 0034 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 14.6 | SQYD | 600.00 | 8,760.00 | 764.00 | 11,154.40 | 550.00 | 8,030.00 | | 0035 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 65.8 | SQYD | 600.00 | 39,480.00 | 391.00 | 25,727.80 | 550.00 | 36,190.00 | | 0036 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 56 | LNFT | 440.00 | 24,640.00 | 379.00 | 21,224.00 | 350.00 | 19,600.00 | | 0037 | 701-03-01110 | Storm Drain Pipe (24" RCP) | 72 | LNFT | 210.00 | 15,120.00 | 182.00 | 13,104.00 | 185.00 | 13,320.00 | | 0038 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 224 | LNFT | 475.00 | 106,400.00 | 412.00 | 92,288.00 | 400.00 | 89,600.00 | | 0039 | 701-03-01180 | Storm Drain Pipe (84" RCP) | 232 | LNFT | 1,000.00 | 232,000.00 | 876.00 | 203,232.00 | 1,025.00 | 237,800.00 | | 0040 | 701-15-00100 | Concrete Collar | 6 | EACH | 1,000.00 | 6,000.00 | 900.00 | 5,400.00 | 2,800.00 | 16,800.00 | | 0041 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 5,500.00 | 5,500.00 | 4,955.00 | 4,955.00 | 3,500.00 | 3,500.00 | | 0042 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 9,000.00 | 18,000.00 | 8,000.00 | 16,000.00 | 9,000.00 | 18,000.00 | | 0043 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 8,000.00 | 8,000.00 | 3,239.00 | 3,239.00 | 3,500.00 | 3,500.00 | | 0044 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 160 | LNFT | 56.00 | 8,960.00 | 55.00 | 8,800.00 | 49.00 | 7,840.00 | | 0045 | 704-03-00100 | Blocked Out Guard rail | 31.25 | LNFT | 33.00 | 1,031.25 | 29.75 | 929.69 | 29.50 | 921.88 | | 0046 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 34.00 | 4,675.00 | 32.00 | 4,400.00 | 29.50 | 4,056.25 | | 0047 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.25 | LNFT | 220.00 | 1,375.00 | 200.00 | 1,250.00 | 190.00 | 1,187.50 | | 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.00 | 13,500.00 | 120.00 | 12,000.00 | 118.00 | 11,800.00 | | 0049 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,000.00 | 12,000.00 | 4,000.00 | 12,000.00 | 3,500.00 | 10,500.00 | | 0050 | 706-02-00200 | Concrete Drive (6" Thick) | 1,192 | SQYD | 120.00 | 143,040.00 | 99.00 | 118,008.00 | 90.00 | 107,280.00 | | 0051 | 707-03-00100 | Combination Concrete Curb and Gutter | 242 | LNFT | 125.00 | 30,250.00 | 63.00 | 15,246.00 | 55.00 | 13,310.00 | | 0052 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 60.00 | 3,240.00 | 300.00 | 16,200.00 | 65.00 | 3,510.00 | | 0053 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 325,000.00 | 325,000.00 | 875,000.00 | 875,000.00 | 1,300,000.00 | 1,300,000.00 | | 0054 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,173 | LNFT | 0.20 | 234.60 | 0.15 | 175.95 | 0.25 | 293.25 | | 0055 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,044 | LNFT | 0.50 | 522.00 | 0.35 | 365.40 | 0.75 | 783.00 | | 0056 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9 | MILE | 350.00 | 3,150.00 | 350.00 | 3,150.00 | 215.00 | 1,935.00 | | 0057 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.75 | MILE | 800.00 | 5,400.00 | 700.00 | 4,725.00 | 600.00 | 4,050.00 | | 0058 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.957 | MILE | 900.00 | 5,361.30 | 900.00 | 5,361.30 | 900.00 | 5,361.30 | | 0059 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 3 | EACH | 30.00 | 90.00 | 25.00 | 75.00 | 15.00 | 45.00 | | 0060 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 30.00 | 60.00 | 25.00 | 50.00 | 15.00 | 30.00 | | 0061 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 30.00 | 90.00 | 25.00 | 75.00 | 15.00 | 45.00 | | 0062 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 5 | EACH | 30.00 | 150.00 | 25.00 | 125.00 | 20.00 | 100.00 | | 0063 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 671 | EACH | 3.50 | 2,348.50 | 3.00 | 2,013.00 | 3.00 | 2,013.00 | | 0064 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | 16,600.00 | 16,600.00 | | 0065 | 726-01-00100 | Bedding Material | 412.9 | CUYD | 120.00 | 49,548.00 | 108.00 | 44,593.20 | 1.00 | 412.90 | | 0066 | 727-01-00100 | Mobilization | 1 | LUMP | 725,000.00 | 725,000.00 | 800,000.00 | 800,000.00 | 1,087,000.00 | 1,087,000.00 | | 0067 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 115.00 | 1,840.00 | 100.00 | 1,600.00 | 75.00 | 1,200.00 | | 0068 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 350.00 | 1,400.00 | 85.00 | 340.00 | | 0069 | 731-02-00100 | Reflectorized Raised Pavement Markers | 374 | EACH | 7.00 | 2,618.00 | 8.00 | 2,992.00 | 4.00 | 1,496.00 | | 0070 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 348 | LNFT | 16.00 | 5,568.00 | 15.00 | 5,220.00 | 12.00 | 4,176.00 | | 0071 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.957 | MILE | 5,200.00 | 30,976.40 | 5,000.00 | 29,785.00 | 3,000.00 | 17,871.00 | | 0072 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.123 | MILE | 13,500.00 | 1,660.50 | 15,000.00 | 1,845.00 | 19,000.00 | 2,337.00 | | 0073 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.25 | MILE | 1,200.00 | 2,700.00 | 2,000.00 | 4,500.00 | 1,200.00 | 2,700.00 | | 0074 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.099 | MILE | 15,700.00 | 1,554.30 | 18,000.00 | 1,782.00 | 6,000.00 | 594.00 | | 0075 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 375.00 | 1,125.00 | 350.00 | 1,050.00 | 300.00 | 900.00 | | 0076 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 345.00 | 690.00 | 350.00 | 700.00 | 300.00 | 600.00 | | 0077 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 345.00 | 1,035.00 | 350.00 | 1,050.00 | 300.00 | 900.00 | | 0078 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 525.00 | 2,625.00 | 500.00 | 2,500.00 | 300.00 | 1,500.00 | | 0079 | 732-05-00100 | Removal of Existing Markings | 0.014 | MILE | 16,000.00 | 224.00 | 25,000.00 | 350.00 | 2,800.00 | 39.20 | | 0080 | 735-01-00100 | Mailboxes | 66 | EACH | 22.00 | 1,452.00 | 50.00 | 3,300.00 | 20.00 | 1,320.00 | | 0081 | 735-02-00100 | Mailbox Supports (Single) | 62 | EACH | 275.00 | 17,050.00 | 300.00 | 18,600.00 | 250.00 | 15,500.00 | | 0082 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 400.00 | 800.00 | 1,050.00 | 2,100.00 | 350.00 | 700.00 | | 0083 | 736-01-00100 | Trenching and Backfilling | 25 | LNFT | 15.00 | 375.00 | 19.00 | 475.00 | 13.00 | 325.00 | | 0084 | 736-09-00100 | Loop Detector | 246 | LNFT | 40.00 | 9,840.00 | 41.00 | 10,086.00 | 38.00 | 9,348.00 | | 0085 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 25 | LNFT | 4.00 | 100.00 | 7.00 | 175.00 | 3.75 | 93.75 | | 0086 | 739-01-00100 | Hydro-Seeding | 0.116 | ACRE | 22,000.00 | 2,552.00 | 19,665.00 | 2,281.14 | 20,000.00 | 2,320.00 | | 0087 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 250,000.00 | 250,000.00 | 21,000.00 | 21,000.00 | | 0088 | 805-01-01000 | Class A1 Concrete (Headwalls) 8' x 10' HEADWALL FOR 84" RCPA STORM DRAIN PIPE | 27.98 | CUYD | 2,500.00 | 69,950.00 | 2,267.00 | 63,430.66 | 13.25 | 370.74 | | 0089 | 806-01-00100 | Deformed Reinforcing Steel | 2,609 | LB | 5.00 | 13,045.00 | 7.00 | 18,263.00 | 2.00 | 5,218.00 | | 0090 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 11 | TON | 375.00 | 4,125.00 | 1,500.00 | 16,500.00 | 450.00 | 4,950.00 | | 0091 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 7,000.00 | 14,000.00 | 8,000.00 | 16,000.00 | 22,000.00 | 44,000.00 | | 0092 | 202-02-02000 | Removal of Asphalt Drives | 550 | SQYD | 30.00 | 16,500.00 | 45.00 | 24,750.00 | 36.00 | 19,800.00 | | 0093 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 36,762 | SQYD | 7.50 | 275,715.00 | 13.00 | 477,906.00 | 8.00 | 294,096.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,383,317.95 | | 8,742,184.55 | | 9,929,873.35 |
|