Proposal:H.015234.6
Parish:Union
Routes:LA 15
Description:LA 15: DRAINAGE IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$305,577.74
| Rank | License | Bidder | Construction Bid |
| 1 | 18546 | C W & W Contractors, Inc. | $185,157.68 |
| 2 | 64911 | Bentz Construction Group, LLC | $204,419.84 |
| 3 | 35849 | T.L. CONSTRUCTION LLC | $279,867.00 |
| 4 | 15099 | Amethyst Construction, Inc. | $297,696.00 |
| 5 | 46716 | BRUDD CONSTRUCTION CO., LLC | $326,194.00 |
| 6 | 49239 | WL Bass Construction Inc. | $432,330.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C W & W Contractors, Inc. | - 2 - Bentz Construction Group, LLC | - 3 - T.L. CONSTRUCTION LLC | - 4 - Amethyst Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing Approx. 0.198 Acre | 1 | LUMP | 5,130.61 | 5,130.61 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP | 46 | LNFT | 163.63 | 7,526.98 | 130.00 | 5,980.00 | 355.00 | 16,330.00 | 165.00 | 7,590.00 | | 0003 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 2,207.31 | 4,414.62 | 1,050.00 | 2,100.00 | 3,600.00 | 7,200.00 | 4,500.00 | 9,000.00 | | 0004 | 203-02-00100 | Drainage Excavation | 585 | CUYD | 13.67 | 7,996.95 | 27.00 | 15,795.00 | 30.00 | 17,550.00 | 20.00 | 11,700.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 100 | LNFT | 44.15 | 4,415.00 | 10.00 | 1,000.00 | 70.00 | 7,000.00 | 55.00 | 5,500.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 325.55 | 651.10 | 450.00 | 900.00 | 300.00 | 600.00 | 275.00 | 550.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 384 | LNFT | 10.42 | 4,001.28 | 4.00 | 1,536.00 | 8.00 | 3,072.00 | 8.00 | 3,072.00 | | 0008 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 111 | SQYD | 84.35 | 9,362.85 | 90.00 | 9,990.00 | 65.00 | 7,215.00 | 225.00 | 24,975.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 12.3 | TON | 497.82 | 6,123.19 | 3,730.00 | 45,879.00 | 1,500.00 | 18,450.00 | 650.00 | 7,995.00 | | 0010 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 112 | SQYD | 132.75 | 14,868.00 | 150.00 | 16,800.00 | 200.00 | 22,400.00 | 225.00 | 25,200.00 | | 0011 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 110 | LNFT | 448.20 | 49,302.00 | 350.00 | 38,500.00 | 500.00 | 55,000.00 | 525.00 | 57,750.00 | | 0012 | 701-15-00100 | Concrete Collar | 4 | EACH | 1,623.60 | 6,494.40 | 1,545.00 | 6,180.00 | 3,500.00 | 14,000.00 | 3,000.00 | 12,000.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 55 | LNFT | 11.84 | 651.20 | 1.00 | 55.00 | 50.00 | 2,750.00 | 1.00 | 55.00 | | 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 22 | SQYD | 111.81 | 2,459.82 | 150.00 | 3,300.00 | 400.00 | 8,800.00 | 225.00 | 4,950.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 22 | SQYD | 7.16 | 157.52 | 3.00 | 66.00 | 100.00 | 2,200.00 | 3.00 | 66.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,811.00 | 7,811.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 | | 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 84 | LNFT | 13.02 | 1,093.68 | 1.00 | 84.00 | 10.00 | 840.00 | 1.75 | 147.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 13,021.86 | 6,510.93 | 2,160.00 | 1,080.00 | 3,500.00 | 1,750.00 | 10,000.00 | 5,000.00 | | 0019 | 717-01-00100 | Seeding | 11 | LB | 65.11 | 716.21 | 29.00 | 319.00 | 105.00 | 1,155.00 | 40.00 | 440.00 | | 0020 | 718-01-00100 | Fertilizer | 184 | LB | 2.60 | 478.40 | 4.50 | 828.00 | 14.00 | 2,576.00 | 3.00 | 552.00 | | 0021 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,233 | SQYD | 4.23 | 5,215.59 | 2.50 | 3,082.50 | 3.00 | 3,699.00 | 5.00 | 6,165.00 | | 0022 | 726-01-00100 | Bedding Material | 25.4 | CUYD | 116.55 | 2,960.37 | 200.00 | 5,080.00 | 350.00 | 8,890.00 | 185.00 | 4,699.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 21,000.00 | 21,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 325.55 | 651.10 | 300.00 | 600.00 | 150.00 | 300.00 | 500.00 | 1,000.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 130.22 | 1,041.76 | 29.00 | 232.00 | 45.00 | 360.00 | 25.00 | 200.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.18 | MILE | 32,554.64 | 5,859.84 | 8,642.00 | 1,555.56 | 7,500.00 | 1,350.00 | 7,500.00 | 1,350.00 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.06 | MILE | 32,554.64 | 1,953.28 | 12,963.00 | 777.78 | 23,000.00 | 1,380.00 | 4,000.00 | 240.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,310.00 | 6,310.00 | 8,200.00 | 8,200.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 185,157.68 | | 204,419.84 | | 279,867.00 | | 297,696.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - BRUDD CONSTRUCTION CO., LLC | - 6 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing Approx. 0.198 Acre | 1 | LUMP | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP | 46 | LNFT | 171.00 | 7,866.00 | 222.00 | 10,212.00 | | 0003 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 1,521.00 | 3,042.00 | 3,500.00 | 7,000.00 | | 0004 | 203-02-00100 | Drainage Excavation | 585 | CUYD | 19.00 | 11,115.00 | 24.00 | 14,040.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 100 | LNFT | 83.00 | 8,300.00 | 10.00 | 1,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 207.00 | 414.00 | 250.00 | 500.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 384 | LNFT | 6.00 | 2,304.00 | 7.00 | 2,688.00 | | 0008 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 111 | SQYD | 326.00 | 36,186.00 | 640.00 | 71,040.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 12.3 | TON | 2,631.00 | 32,361.30 | 475.00 | 5,842.50 | | 0010 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 112 | SQYD | 319.00 | 35,728.00 | 300.00 | 33,600.00 | | 0011 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 110 | LNFT | 464.00 | 51,040.00 | 700.00 | 77,000.00 | | 0012 | 701-15-00100 | Concrete Collar | 4 | EACH | 1,867.00 | 7,468.00 | 3,500.00 | 14,000.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 55 | LNFT | 59.00 | 3,245.00 | 900.00 | 49,500.00 | | 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 22 | SQYD | 218.00 | 4,796.00 | 170.00 | 3,740.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 22 | SQYD | 7.00 | 154.00 | 4.00 | 88.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 26,000.00 | 26,000.00 | 50,000.00 | 50,000.00 | | 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 84 | LNFT | 6.00 | 504.00 | 0.50 | 42.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 3,000.00 | 1,500.00 | 8,000.00 | 4,000.00 | | 0019 | 717-01-00100 | Seeding | 11 | LB | 118.00 | 1,298.00 | 35.00 | 385.00 | | 0020 | 718-01-00100 | Fertilizer | 184 | LB | 6.60 | 1,214.40 | 2.00 | 368.00 | | 0021 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,233 | SQYD | 4.50 | 5,548.50 | 5.00 | 6,165.00 | | 0022 | 726-01-00100 | Bedding Material | 25.4 | CUYD | 337.00 | 8,559.80 | 250.00 | 6,350.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 43,200.00 | 43,200.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 118.00 | 236.00 | 75.00 | 150.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 42.00 | 336.00 | 20.00 | 160.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.18 | MILE | 11,800.00 | 2,124.00 | 6,000.00 | 1,080.00 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.06 | MILE | 5,900.00 | 354.00 | 3,000.00 | 180.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 326,194.00 | | 432,330.50 |
|