Proposal:H.014222.6
Parish:Bienville
Routes:LA 516
Description:LA 516: POLAND BRANCH BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$3,182,934.48
| Rank | License | Bidder | Construction Bid |
| 1 | 71454 | Chief Bridge & Concrete LLC | $2,632,307.70 |
| 2 | 49239 | WL Bass Construction Inc. | $2,851,145.17 |
| 3 | 55505 | MERRICK, LLC | $3,152,560.80 |
| 4 | 56994 | Matt L. Guinn Construction, LLC | $3,199,075.42 |
| 5 | 55950 | Brown Industrial Construction, LLC | $3,371,688.32 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $3,533,481.85 |
| 7 | 00044 | Guinn Construction, LLC | $3,638,264.60 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $3,646,473.57 |
| 9 | 14788 | Louisiana Bridge, Inc. | $5,022,486.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Chief Bridge & Concrete LLC | - 2 - WL Bass Construction Inc. | - 3 - MERRICK, LLC | - 4 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.57 | LUMP | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | 60,000.00 | 60,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,427.5 | SQYD | 11.00 | 26,702.50 | 2.00 | 4,855.00 | 10.00 | 24,275.00 | 9.00 | 21,847.50 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 294-04-08.09-1 (STA 135+49.63; 28' X 95' COPCSS) | 2,660 | LUMP | 80,000.00 | 80,000.00 | 175,000.00 | 175,000.00 | 230,000.00 | 230,000.00 | 75,000.00 | 75,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 445.1 | LNFT | 30.00 | 13,353.00 | 7.00 | 3,115.70 | 14.00 | 6,231.40 | 8.00 | 3,560.80 | | 0006 | 203-02-00100 | Drainage Excavation | 1,971 | CUYD | 16.00 | 31,536.00 | 17.00 | 33,507.00 | 15.00 | 29,565.00 | 18.00 | 35,478.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 250,000.00 | 250,000.00 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 200.00 | 1,600.00 | 175.00 | 1,400.00 | 145.00 | 1,160.00 | 250.00 | 2,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,579 | LNFT | 4.00 | 6,316.00 | 3.50 | 5,526.50 | 3.50 | 5,526.50 | 3.50 | 5,526.50 | | 0010 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,294.1 | SQYD | 37.00 | 84,881.70 | 65.00 | 149,116.50 | 51.00 | 116,999.10 | 48.50 | 111,263.85 | | 0011 | 302-03-00100 | Base Drain Outlet | 6 | EACH | 1,000.00 | 6,000.00 | 3,000.00 | 18,000.00 | 600.00 | 3,600.00 | 1,500.00 | 9,000.00 | | 0012 | 304-01-00100 | Lime | 16.26 | TON | 400.00 | 6,504.00 | 375.00 | 6,097.50 | 300.00 | 4,878.00 | 750.00 | 12,195.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 1,147 | SQYD | 6.00 | 6,882.00 | 8.00 | 9,176.00 | 5.50 | 6,308.50 | 15.00 | 17,205.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 511.7 | TON | 200.00 | 102,340.00 | 250.00 | 127,925.00 | 305.00 | 156,068.50 | 270.00 | 138,159.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 95 | TON | 220.00 | 20,900.00 | 250.00 | 23,750.00 | 310.00 | 29,450.00 | 360.00 | 34,200.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 482.8 | SQYD | 31.00 | 14,966.80 | 40.00 | 19,312.00 | 25.00 | 12,070.00 | 41.00 | 19,794.80 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 0.10 | -2.80 | 0.01 | -0.28 | 1.20 | -33.60 | 0.01 | -0.28 | | 0018 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 82 | SQYD | 215.00 | 17,630.00 | 275.00 | 22,550.00 | 325.00 | 26,650.00 | 310.00 | 25,420.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 36.00 | 5,400.00 | 31.00 | 4,650.00 | 35.00 | 5,250.00 | 38.50 | 5,775.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 122.00 | 12,200.00 | 130.00 | 13,000.00 | 140.00 | 14,000.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,900.00 | 15,600.00 | 3,885.00 | 15,540.00 | 4,500.00 | 18,000.00 | 3,900.00 | 15,600.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 700.00 | 4,900.00 | 200.00 | 1,400.00 | 750.00 | 5,250.00 | 700.00 | 4,900.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 7 | EACH | 200.00 | 1,400.00 | 250.00 | 1,750.00 | 250.00 | 1,750.00 | 700.00 | 4,900.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,888 | SQYD | 115.00 | 217,120.00 | 105.00 | 198,240.00 | 100.00 | 188,800.00 | 90.00 | 169,920.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,888 | SQYD | 1.50 | 2,832.00 | 4.00 | 7,552.00 | 3.00 | 5,664.00 | 2.50 | 4,720.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 36,400.00 | 36,400.00 | 150,000.00 | 150,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 4.2 | TON | 1,000.00 | 4,200.00 | 950.00 | 3,990.00 | 1,100.00 | 4,620.00 | 850.00 | 3,570.00 | | 0028 | 717-01-00100 | Seeding | 86 | LB | 25.00 | 2,150.00 | 15.00 | 1,290.00 | 35.00 | 3,010.00 | 25.00 | 2,150.00 | | 0029 | 718-01-00100 | Fertilizer | 2,860 | LB | 1.00 | 2,860.00 | 1.00 | 2,860.00 | 0.90 | 2,574.00 | 1.00 | 2,860.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,498 | SQYD | 3.25 | 4,868.50 | 2.00 | 2,996.00 | 2.50 | 3,745.00 | 3.00 | 4,494.00 | | 0031 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.292 | MILE | 10,000.00 | 2,920.00 | 500.00 | 146.00 | 11,000.00 | 3,212.00 | 10,000.00 | 2,920.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 260,000.00 | 260,000.00 | 285,000.00 | 285,000.00 | 310,000.00 | 310,000.00 | 300,000.00 | 300,000.00 | | 0034 | 729-01-00100 | Sign (Type A) | 8.6 | SQFT | 50.00 | 430.00 | 50.00 | 430.00 | 44.00 | 378.40 | 55.00 | 473.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 90.00 | 360.00 | 115.00 | 460.00 | 135.00 | 540.00 | | 0036 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 400.00 | 800.00 | 150.00 | 300.00 | 150.00 | 300.00 | 300.00 | 600.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 48 | EACH | 20.00 | 960.00 | 20.00 | 960.00 | 30.00 | 1,440.00 | 50.00 | 2,400.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.72 | MILE | 20,000.00 | 14,400.00 | 20,000.00 | 14,400.00 | 25,000.00 | 18,000.00 | 25,000.00 | 18,000.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 48,500.00 | 48,500.00 | 84,000.00 | 84,000.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | | 0040 | 804-01-00400 | Precast Concrete Piles (18") | 2,440 | LNFT | 160.00 | 390,400.00 | 240.00 | 585,600.00 | 185.00 | 451,400.00 | 160.00 | 390,400.00 | | 0041 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 1,400.00 | 313,502.00 | 350.00 | 78,375.50 | 2,000.00 | 447,860.00 | 1,850.00 | 414,270.50 | | 0042 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 2,200.00 | 139,700.00 | 350.00 | 22,225.00 | 3,000.00 | 190,500.00 | 4,500.00 | 285,750.00 | | 0043 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,920 | SQFT | 3.00 | 5,760.00 | 3.00 | 5,760.00 | 3.00 | 5,760.00 | 1.50 | 2,880.00 | | 0044 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,920 | SQFT | 3.00 | 5,760.00 | 3.00 | 5,760.00 | 3.00 | 5,760.00 | 1.50 | 2,880.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 2.00 | 104,578.00 | 3.75 | 196,083.75 | 2.00 | 104,578.00 | 1.75 | 91,505.75 | | 0046 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 240.00 | 67,200.00 | 202.00 | 56,560.00 | 235.00 | 65,800.00 | 245.00 | 68,600.00 | | 0047 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 140.00 | 179,200.00 | 220.00 | 281,600.00 | 125.00 | 160,000.00 | 145.00 | 185,600.00 | | 0048 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 140.00 | 24,500.00 | 140.00 | 24,500.00 | 185.00 | 32,375.00 | 110.00 | 19,250.00 | | 0049 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 30.00 | 7,680.00 | 15.00 | 3,840.00 | 30.00 | 7,680.00 | 25.00 | 6,400.00 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 25.00 | 4,800.00 | 2.00 | 384.00 | 16.00 | 3,072.00 | 15.00 | 2,880.00 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 256 | LNFT | 12.00 | 3,072.00 | 1.00 | 256.00 | 3.00 | 768.00 | 10.00 | 2,560.00 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,403 | INLF | 2.00 | 2,806.00 | 2.00 | 2,806.00 | 2.00 | 2,806.00 | 9.00 | 12,627.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,632,307.70 | | 2,851,145.17 | | 3,152,560.80 | | 3,199,075.42 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | - 6 - Diamond B Construction Co., L.L.C. | - 7 - Guinn Construction, LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.57 | LUMP | 450,000.00 | 450,000.00 | 75,000.00 | 75,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,427.5 | SQYD | 8.00 | 19,420.00 | 6.00 | 14,565.00 | 18.00 | 43,695.00 | 8.00 | 19,420.00 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 294-04-08.09-1 (STA 135+49.63; 28' X 95' COPCSS) | 2,660 | LUMP | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 | 65,000.00 | 65,000.00 | 300,000.00 | 300,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 445.1 | LNFT | 8.00 | 3,560.80 | 32.00 | 14,243.20 | 10.00 | 4,451.00 | 8.00 | 3,560.80 | | 0006 | 203-02-00100 | Drainage Excavation | 1,971 | CUYD | 18.00 | 35,478.00 | 10.00 | 19,710.00 | 25.00 | 49,275.00 | 18.00 | 35,478.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 150,000.00 | 150,000.00 | 142,000.00 | 142,000.00 | 250,000.00 | 250,000.00 | 100,000.00 | 100,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 175.00 | 1,400.00 | 200.00 | 1,600.00 | 500.00 | 4,000.00 | 200.00 | 1,600.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,579 | LNFT | 3.00 | 4,737.00 | 3.00 | 4,737.00 | 3.00 | 4,737.00 | 5.00 | 7,895.00 | | 0010 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,294.1 | SQYD | 50.00 | 114,705.00 | 62.00 | 142,234.20 | 50.00 | 114,705.00 | 37.50 | 86,028.75 | | 0011 | 302-03-00100 | Base Drain Outlet | 6 | EACH | 900.00 | 5,400.00 | 1,400.00 | 8,400.00 | 1,000.00 | 6,000.00 | 1,500.00 | 9,000.00 | | 0012 | 304-01-00100 | Lime | 16.26 | TON | 500.00 | 8,130.00 | 600.00 | 9,756.00 | 750.00 | 12,195.00 | 400.00 | 6,504.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 1,147 | SQYD | 15.00 | 17,205.00 | 11.00 | 12,617.00 | 25.00 | 28,675.00 | 10.00 | 11,470.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 511.7 | TON | 275.00 | 140,717.50 | 260.00 | 133,042.00 | 350.00 | 179,095.00 | 275.00 | 140,717.50 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 95 | TON | 305.00 | 28,975.00 | 310.00 | 29,450.00 | 425.00 | 40,375.00 | 305.00 | 28,975.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 482.8 | SQYD | 25.00 | 12,070.00 | 14.00 | 6,759.20 | 42.00 | 20,277.60 | 6.00 | 2,896.80 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 0.01 | -0.28 | 1.00 | -28.00 | 0.00 | 0.00 | 0.01 | -0.28 | | 0018 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 82 | SQYD | 280.00 | 22,960.00 | 230.00 | 18,860.00 | 350.00 | 28,700.00 | 340.00 | 27,880.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 31.00 | 4,650.00 | 35.00 | 5,250.00 | 45.00 | 6,750.00 | 60.00 | 9,000.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 122.00 | 12,200.00 | 136.00 | 13,600.00 | 155.00 | 15,500.00 | 125.00 | 12,500.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,900.00 | 15,600.00 | 4,000.00 | 16,000.00 | 5,000.00 | 20,000.00 | 3,200.00 | 12,800.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 700.00 | 4,900.00 | 700.00 | 4,900.00 | 1,000.00 | 7,000.00 | 700.00 | 4,900.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 7 | EACH | 200.00 | 1,400.00 | 200.00 | 1,400.00 | 500.00 | 3,500.00 | 200.00 | 1,400.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,888 | SQYD | 100.00 | 188,800.00 | 105.00 | 198,240.00 | 115.00 | 217,120.00 | 95.00 | 179,360.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,888 | SQYD | 3.00 | 5,664.00 | 1.00 | 1,888.00 | 4.00 | 7,552.00 | 2.00 | 3,776.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 95,000.00 | 95,000.00 | 155,000.00 | 155,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 4.2 | TON | 950.00 | 3,990.00 | 975.00 | 4,095.00 | 1,000.00 | 4,200.00 | 950.00 | 3,990.00 | | 0028 | 717-01-00100 | Seeding | 86 | LB | 15.00 | 1,290.00 | 16.00 | 1,376.00 | 25.00 | 2,150.00 | 30.00 | 2,580.00 | | 0029 | 718-01-00100 | Fertilizer | 2,860 | LB | 0.80 | 2,288.00 | 1.00 | 2,860.00 | 1.00 | 2,860.00 | 0.75 | 2,145.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,498 | SQYD | 2.00 | 2,996.00 | 2.00 | 2,996.00 | 3.00 | 4,494.00 | 2.00 | 2,996.00 | | 0031 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.292 | MILE | 10,000.00 | 2,920.00 | 10,000.00 | 2,920.00 | 20,000.00 | 5,840.00 | 500.00 | 146.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 330,000.00 | 330,000.00 | 350,000.00 | 350,000.00 | 375,000.00 | 375,000.00 | 350,000.00 | 350,000.00 | | 0034 | 729-01-00100 | Sign (Type A) | 8.6 | SQFT | 40.00 | 344.00 | 55.00 | 473.00 | 75.00 | 645.00 | 20.00 | 172.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 135.00 | 540.00 | 200.00 | 800.00 | 95.00 | 380.00 | | 0036 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 200.00 | 400.00 | 250.00 | 500.00 | 300.00 | 600.00 | 900.00 | 1,800.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 48 | EACH | 20.00 | 960.00 | 22.00 | 1,056.00 | 50.00 | 2,400.00 | 20.00 | 960.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.72 | MILE | 20,000.00 | 14,400.00 | 20,000.00 | 14,400.00 | 30,000.00 | 21,600.00 | 20,000.00 | 14,400.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 90,000.00 | 90,000.00 | 95,000.00 | 95,000.00 | 20,000.00 | 20,000.00 | 60,000.00 | 60,000.00 | | 0040 | 804-01-00400 | Precast Concrete Piles (18") | 2,440 | LNFT | 170.00 | 414,800.00 | 255.00 | 622,200.00 | 225.00 | 549,000.00 | 350.00 | 854,000.00 | | 0041 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 1,500.00 | 335,895.00 | 2,550.00 | 571,021.50 | 2,650.00 | 593,414.50 | 2,000.00 | 447,860.00 | | 0042 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 3,200.00 | 203,200.00 | 4,700.00 | 298,450.00 | 3,250.00 | 206,375.00 | 3,500.00 | 222,250.00 | | 0043 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,920 | SQFT | 2.50 | 4,800.00 | 6.00 | 11,520.00 | 2.00 | 3,840.00 | 1.00 | 1,920.00 | | 0044 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,920 | SQFT | 3.00 | 5,760.00 | 6.00 | 11,520.00 | 2.00 | 3,840.00 | 2.00 | 3,840.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 1.70 | 88,891.30 | 2.00 | 104,578.00 | 2.00 | 104,578.00 | 2.00 | 104,578.00 | | 0046 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 280.00 | 78,400.00 | 250.00 | 70,000.00 | 325.00 | 91,000.00 | 150.00 | 42,000.00 | | 0047 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 130.00 | 166,400.00 | 140.00 | 179,200.00 | 120.00 | 153,600.00 | 100.00 | 128,000.00 | | 0048 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 120.00 | 21,000.00 | 185.00 | 32,375.00 | 285.00 | 49,875.00 | 100.00 | 17,500.00 | | 0049 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 20.00 | 5,120.00 | 12.00 | 3,072.00 | 25.00 | 6,400.00 | 7.00 | 1,792.00 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 27.00 | 5,184.00 | 12.00 | 2,304.00 | 5.00 | 960.00 | 7.00 | 1,344.00 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 256 | LNFT | 2.00 | 512.00 | 8.00 | 2,048.00 | 5.00 | 1,280.00 | 1.00 | 256.00 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,403 | INLF | 2.00 | 2,806.00 | 1.25 | 1,753.75 | 3.50 | 4,910.50 | 1.00 | 1,403.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,371,688.32 | | 3,533,481.85 | | 3,638,264.60 | | 3,646,473.57 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.57 | LUMP | 235,000.00 | 235,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,427.5 | SQYD | 23.00 | 55,832.50 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 294-04-08.09-1 (STA 135+49.63; 28' X 95' COPCSS) | 2,660 | LUMP | 175,000.00 | 175,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 445.1 | LNFT | 28.00 | 12,462.80 | | 0006 | 203-02-00100 | Drainage Excavation | 1,971 | CUYD | 30.00 | 59,130.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 225,000.00 | 225,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 450.00 | 3,600.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,579 | LNFT | 5.00 | 7,895.00 | | 0010 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,294.1 | SQYD | 100.00 | 229,410.00 | | 0011 | 302-03-00100 | Base Drain Outlet | 6 | EACH | 450.00 | 2,700.00 | | 0012 | 304-01-00100 | Lime | 16.26 | TON | 400.00 | 6,504.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 1,147 | SQYD | 20.00 | 22,940.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 511.7 | TON | 350.00 | 179,095.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 95 | TON | 280.00 | 26,600.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 482.8 | SQYD | 25.00 | 12,070.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 1.00 | -28.00 | | 0018 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 82 | SQYD | 600.00 | 49,200.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 125.00 | 18,750.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 155.00 | 15,500.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 4,500.00 | 18,000.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 600.00 | 4,200.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 7 | EACH | 600.00 | 4,200.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,888 | SQYD | 115.00 | 217,120.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,888 | SQYD | 5.00 | 9,440.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 4.2 | TON | 1,500.00 | 6,300.00 | | 0028 | 717-01-00100 | Seeding | 86 | LB | 55.00 | 4,730.00 | | 0029 | 718-01-00100 | Fertilizer | 2,860 | LB | 3.00 | 8,580.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,498 | SQYD | 8.00 | 11,984.00 | | 0031 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.292 | MILE | 10,000.00 | 2,920.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 740,000.00 | 740,000.00 | | 0034 | 729-01-00100 | Sign (Type A) | 8.6 | SQFT | 115.00 | 989.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | | 0036 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 260.00 | 520.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 48 | EACH | 25.00 | 1,200.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.72 | MILE | 23,000.00 | 16,560.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 85,000.00 | 85,000.00 | | 0040 | 804-01-00400 | Precast Concrete Piles (18") | 2,440 | LNFT | 320.00 | 780,800.00 | | 0041 | 805-01-00100 | Class A1 Concrete (Slab Span) | 223.93 | CUYD | 3,200.00 | 716,576.00 | | 0042 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 63.5 | CUYD | 3,800.00 | 241,300.00 | | 0043 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,920 | SQFT | 4.00 | 7,680.00 | | 0044 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,920 | SQFT | 4.00 | 7,680.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel | 52,289 | LB | 3.00 | 156,867.00 | | 0046 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 280 | LNFT | 400.00 | 112,000.00 | | 0047 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 250.00 | 320,000.00 | | 0048 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 175 | SFIN | 300.00 | 52,500.00 | | 0049 | 815-03-00300 | Joint Seal (Poured) | 256 | LNFT | 32.00 | 8,192.00 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 25.00 | 4,800.00 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 256 | LNFT | 12.00 | 3,072.00 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,403 | INLF | 5.00 | 7,015.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,022,486.30 |
|