Proposal:H.013429.6
Parish:Lafourche
Description:DOWNTOWN THIBODAUX SIDEWALKS
Type Construction:CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$1,259,289.30
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $1,046,962.90 |
| 2 | 34263 | La Contracting Enterprise LLC | $1,237,500.00 |
| 3 | 68424 | Procivil, LLC | $1,270,098.30 |
| 4 | 12198 | Byron E. Talbot Contractor, Inc. | $1,338,594.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - La Contracting Enterprise LLC | - 3 - Procivil, LLC | - 4 - Byron E. Talbot Contractor, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,700 | SQYD | 5.00 | 18,500.00 | 30.00 | 111,000.00 | 50.00 | 185,000.00 | 38.00 | 140,600.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 3,407.5 | LNFT | 5.00 | 17,037.50 | 20.00 | 68,150.00 | 5.00 | 17,037.50 | 28.50 | 97,113.75 | | 0003 | 202-03-38000 | Relocation of Sign | 19 | EACH | 500.00 | 9,500.00 | 350.00 | 6,650.00 | 250.00 | 4,750.00 | 1,400.00 | 26,600.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 107 | CUYD | 80.00 | 8,560.00 | 150.00 | 16,050.00 | 100.00 | 10,700.00 | 180.00 | 19,260.00 | | 0005 | 702-04-00100 | Adjusting Manholes | 16 | EACH | 250.00 | 4,000.00 | 2,500.00 | 40,000.00 | 500.00 | 8,000.00 | 1,650.00 | 26,400.00 | | 0006 | 706-01-00100 | Concrete Walk (4" Thick) | 1,997.8 | SQYD | 95.00 | 189,791.00 | 87.00 | 173,808.60 | 115.00 | 229,747.00 | 125.00 | 249,725.00 | | 0008 | 706-04-00110 | Curb Ramps Type 1A | 149.7 | SQYD | 200.00 | 29,940.00 | 400.00 | 59,880.00 | 300.00 | 44,910.00 | 300.00 | 44,910.00 | | 0009 | 706-04-00110 | Curb Ramps Type 1A-X | 89.5 | SQYD | 200.00 | 17,900.00 | 400.00 | 35,800.00 | 300.00 | 26,850.00 | 300.00 | 26,850.00 | | 0010 | 706-04-00110 | Curb Ramps Type 1B | 19.4 | SQYD | 200.00 | 3,880.00 | 400.00 | 7,760.00 | 300.00 | 5,820.00 | 300.00 | 5,820.00 | | 0011 | 706-04-00110 | Curb Ramps Type 1P-X | 39.4 | SQYD | 200.00 | 7,880.00 | 400.00 | 15,760.00 | 300.00 | 11,820.00 | 300.00 | 11,820.00 | | 0012 | 706-04-00110 | Curb Ramps Type 2P | 61.6 | SQYD | 200.00 | 12,320.00 | 400.00 | 24,640.00 | 300.00 | 18,480.00 | 310.00 | 19,096.00 | | 0013 | 706-04-00110 | Curb Ramps Type 2P-X | 19.2 | SQYD | 200.00 | 3,840.00 | 400.00 | 7,680.00 | 300.00 | 5,760.00 | 310.00 | 5,952.00 | | 0014 | 706-04-00110 | Curb Ramps Type 4A | 88.1 | SQYD | 200.00 | 17,620.00 | 400.00 | 35,240.00 | 300.00 | 26,430.00 | 300.00 | 26,430.00 | | 0015 | 706-04-00110 | Curb Ramps Type 4B | 34.6 | SQYD | 200.00 | 6,920.00 | 400.00 | 13,840.00 | 300.00 | 10,380.00 | 300.00 | 10,380.00 | | 0016 | 706-04-00110 | Curb Ramps Type 4C | 25.8 | SQYD | 200.00 | 5,160.00 | 400.00 | 10,320.00 | 300.00 | 7,740.00 | 300.00 | 7,740.00 | | 0017 | 706-04-00110 | Curb Ramps Type 4P | 32.9 | SQYD | 200.00 | 6,580.00 | 400.00 | 13,160.00 | 300.00 | 9,870.00 | 300.00 | 9,870.00 | | 0018 | 706-04-00110 | Curb Ramps Type 5A | 22.4 | SQYD | 200.00 | 4,480.00 | 400.00 | 8,960.00 | 300.00 | 6,720.00 | 300.00 | 6,720.00 | | 0019 | 706-04-00110 | Curb Ramps Type 6A | 216.4 | SQYD | 200.00 | 43,280.00 | 400.00 | 86,560.00 | 300.00 | 64,920.00 | 300.00 | 64,920.00 | | 0020 | 706-04-00110 | Curb Ramps Type 6B | 24.7 | SQYD | 200.00 | 4,940.00 | 400.00 | 9,880.00 | 300.00 | 7,410.00 | 300.00 | 7,410.00 | | 0021 | 706-04-00110 | Curb Ramps Type 6C | 14 | SQYD | 200.00 | 2,800.00 | 400.00 | 5,600.00 | 300.00 | 4,200.00 | 300.00 | 4,200.00 | | 0022 | 706-04-00110 | Curb Ramps Type 7A | 23.1 | SQYD | 200.00 | 4,620.00 | 400.00 | 9,240.00 | 300.00 | 6,930.00 | 350.00 | 8,085.00 | | 0023 | 706-04-00110 | Curb Ramps Type 8A | 34.5 | SQYD | 230.00 | 7,935.00 | 400.00 | 13,800.00 | 300.00 | 10,350.00 | 325.00 | 11,212.50 | | 0024 | 707-01-00100 | Concrete Curb | 3,621.6 | LNFT | 20.00 | 72,432.00 | 28.00 | 101,404.80 | 20.00 | 72,432.00 | 27.50 | 99,594.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | 43,500.00 | 43,500.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | 0027 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) Yellow | 1,890 | LNFT | 2.00 | 3,780.00 | 2.50 | 4,725.00 | 2.50 | 4,725.00 | 5.65 | 10,678.50 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 10,044.24 | 10,044.24 | 7,500.00 | 7,500.00 | 17,500.00 | 17,500.00 | | 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 41,802.4 | INLF | 1.00 | 41,802.40 | 1.40 | 58,523.36 | 0.75 | 31,351.80 | 1.50 | 62,703.60 | | 0030 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 95 | EACH | 150.00 | 14,250.00 | 300.00 | 28,500.00 | 350.00 | 33,250.00 | 500.00 | 47,500.00 | | 0031 | TS-MSC-01040 | Adjusting Utility Boxes | 59 | EACH | 150.00 | 8,850.00 | 750.00 | 44,250.00 | 350.00 | 20,650.00 | 1,000.00 | 59,000.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 475.6 | SQYD | 150.00 | 71,340.00 | 150.00 | 71,340.00 | 125.00 | 59,450.00 | 141.00 | 67,059.60 | | 0033 | TS-719-00020 | Pavers (Brick) | 1,427 | SQFT | 75.00 | 107,025.00 | 42.00 | 59,934.00 | 145.00 | 206,915.00 | 35.00 | 49,945.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,046,962.90 | | 1,237,500.00 | | 1,270,098.30 | | 1,338,594.95 |
|