Proposal:H.012919.6
Parish:Acadia
Routes:LA 100
Description:LA 100: LA 97 - LA 91
Type Construction:CLEARING AND GRUBBING, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,937,355.10
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $7,377,822.20 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $7,815,665.20 |
| 3 | 51821 | Elliott Construction, LLC | $7,969,939.66 |
| 4 | 33663 | Glenn Lege Construction LLC | $8,492,868.11 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Elliott Construction, LLC | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) 0.24 ACRES | 0.24 | LUMP | 5,000.00 | 5,000.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | 114,750.00 | 114,750.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 255 | SQYD | 20.00 | 5,100.00 | 45.00 | 11,475.00 | 35.00 | 8,925.00 | 18.90 | 4,819.50 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,627.4 | SQYD | 12.00 | 19,528.80 | 25.00 | 40,685.00 | 15.00 | 24,411.00 | 22.95 | 37,348.83 | | 0004 | 202-02-04560 | Removal of Bridge Joint Removal of Bridge Joint | 1,055 | LNFT | 15.00 | 15,825.00 | 65.00 | 68,575.00 | 25.00 | 26,375.00 | 4.89 | 5,158.95 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 276 | SQYD | 30.00 | 8,280.00 | 60.00 | 16,560.00 | 35.00 | 9,660.00 | 27.96 | 7,716.96 | | 0006 | 202-02-14500 | Removal of Guard Rail | 3,001 | LNFT | 16.00 | 48,016.00 | 7.00 | 21,007.00 | 12.00 | 36,012.00 | 13.50 | 40,513.50 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 8 | LNFT | 30.00 | 240.00 | 100.00 | 800.00 | 100.00 | 800.00 | 43.88 | 351.04 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,300 | CUYD | 50.00 | 165,000.00 | 36.50 | 120,450.00 | 40.00 | 132,000.00 | 41.18 | 135,894.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 58 | EACH | 165.00 | 9,570.00 | 35.00 | 2,030.00 | 150.00 | 8,700.00 | 202.50 | 11,745.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,948 | LNFT | 2.90 | 5,649.20 | 2.00 | 3,896.00 | 2.50 | 4,870.00 | 2.46 | 4,792.08 | | 0011 | 303-02-00100 | Removal of Existing Patches | 270 | SQYD | 50.00 | 13,500.00 | 60.00 | 16,200.00 | 16.00 | 4,320.00 | 26.61 | 7,184.70 | | 0012 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 74,807 | SQYD | 15.00 | 1,122,105.00 | 11.00 | 822,877.00 | 15.50 | 1,159,508.50 | 11.35 | 849,059.45 | | 0013 | 304-01-00100 | Lime | 321.58 | TON | 500.00 | 160,790.00 | 400.00 | 128,632.00 | 325.00 | 104,513.50 | 339.80 | 109,272.88 | | 0014 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 22,686 | SQYD | 6.50 | 147,459.00 | 7.00 | 158,802.00 | 5.00 | 113,430.00 | 3.38 | 76,678.68 | | 0015 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 73,498 | SQYD | 17.50 | 1,286,215.00 | 15.00 | 1,102,470.00 | 17.50 | 1,286,215.00 | 8.86 | 651,192.28 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,571 | CUYD | 32.00 | 50,272.00 | 63.00 | 98,973.00 | 65.00 | 102,115.00 | 88.70 | 139,347.70 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 85.00 | 17,000.00 | 65.00 | 13,000.00 | 95.00 | 19,000.00 | 81.68 | 16,336.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 19,559.2 | TON | 119.00 | 2,327,544.80 | 148.00 | 2,894,761.60 | 145.00 | 2,836,084.00 | 176.85 | 3,459,044.52 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,738.5 | TON | 190.00 | 330,315.00 | 148.00 | 257,298.00 | 180.00 | 312,930.00 | 217.35 | 377,862.98 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 61,923 | SQYD | 3.50 | 216,730.50 | 5.00 | 309,615.00 | 4.50 | 278,653.50 | 4.36 | 269,984.28 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,200 | CUYD | 0.01 | -62.00 | 1.00 | -6,200.00 | 0.01 | -62.00 | 0.01 | -62.00 | | 0022 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 603 | SQYD | 170.00 | 102,510.00 | 200.00 | 120,600.00 | 175.00 | 105,525.00 | 234.43 | 141,361.29 | | 0023 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 16 | LNFT | 325.00 | 5,200.00 | 800.00 | 12,800.00 | 400.00 | 6,400.00 | 524.62 | 8,393.92 | | 0024 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 64 | LNFT | 400.00 | 25,600.00 | 250.00 | 16,000.00 | 200.00 | 12,800.00 | 196.79 | 12,594.56 | | 0025 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,000.00 | 4,000.00 | 3,700.00 | 7,400.00 | 2,500.00 | 5,000.00 | 1,485.00 | 2,970.00 | | 0026 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 250 | LNFT | 100.00 | 25,000.00 | 50.00 | 12,500.00 | 58.00 | 14,500.00 | 65.14 | 16,285.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 556.3 | LNFT | 40.00 | 22,252.00 | 30.00 | 16,689.00 | 35.00 | 19,470.50 | 39.15 | 21,779.15 | | 0028 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 110.00 | 5,500.00 | 67.00 | 3,350.00 | 80.00 | 4,000.00 | 87.75 | 4,387.50 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 145.00 | 43,500.00 | 116.00 | 34,800.00 | 140.00 | 42,000.00 | 155.25 | 46,575.00 | | 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 5,000.00 | 35,000.00 | 4,000.00 | 28,000.00 | 4,550.00 | 31,850.00 | 5,130.00 | 35,910.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 5 | EACH | 4,500.00 | 22,500.00 | 3,400.00 | 17,000.00 | 3,950.00 | 19,750.00 | 4,455.00 | 22,275.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 259.9 | SQYD | 200.00 | 51,980.00 | 225.00 | 58,477.50 | 135.00 | 35,086.50 | 93.04 | 24,181.10 | | 0033 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 105.00 | 11,340.00 | 70.00 | 7,560.00 | 100.00 | 10,800.00 | 60.08 | 6,488.64 | | 0034 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 150 | SQYD | 190.00 | 28,500.00 | 175.00 | 26,250.00 | 125.00 | 18,750.00 | 135.32 | 20,298.00 | | 0035 | 711-04-00100 | Geotextile Fabric | 150 | SQYD | 6.00 | 900.00 | 7.00 | 1,050.00 | 6.00 | 900.00 | 39.62 | 5,943.00 | | 0036 | 712-02-00100 | Sacked Concrete Revetment | 4 | SQYD | 750.00 | 3,000.00 | 2,500.00 | 10,000.00 | 750.00 | 3,000.00 | 2,342.25 | 9,369.00 | | 0037 | 712-04-00100 | Flexible Revetment | 6 | SQYD | 650.00 | 3,900.00 | 850.00 | 5,100.00 | 400.00 | 2,400.00 | 2,004.21 | 12,025.26 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 117,000.00 | 117,000.00 | 60,000.00 | 60,000.00 | 488,948.54 | 488,948.54 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.826 | MILE | 650.00 | 7,686.90 | 225.00 | 2,660.85 | 774.72 | 9,161.84 | 810.00 | 9,579.06 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.826 | MILE | 700.00 | 8,278.20 | 600.00 | 7,095.60 | 715.00 | 8,455.59 | 810.00 | 9,579.06 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 45.53 | MILE | 950.00 | 43,253.50 | 850.00 | 38,700.50 | 1,015.00 | 46,212.95 | 1,147.50 | 52,245.68 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 34,425.00 | 34,425.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.174 | MILE | 1,200.00 | 12,208.80 | 1,000.00 | 10,174.00 | 1,600.00 | 16,278.40 | 1,350.00 | 13,734.90 | | 0044 | 726-01-00100 | Bedding Material | 17.6 | CUYD | 150.00 | 2,640.00 | 150.00 | 2,640.00 | 150.00 | 2,640.00 | 118.80 | 2,090.88 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 780,000.00 | 780,000.00 | 750,000.00 | 750,000.00 | 587,250.00 | 587,250.00 | | 0046 | 729-16-00200 | Object Marker Assembly (Type 2) | 11 | EACH | 125.00 | 1,375.00 | 76.00 | 836.00 | 90.00 | 990.00 | 1,113.75 | 12,251.25 | | 0047 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 145.00 | 1,740.00 | 91.00 | 1,092.00 | 110.00 | 1,320.00 | 121.50 | 1,458.00 | | 0048 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 2,140 | EACH | 12.00 | 25,680.00 | 11.00 | 23,540.00 | 12.00 | 25,680.00 | 13.50 | 28,890.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,003 | EACH | 6.50 | 6,519.50 | 5.75 | 5,767.25 | 6.50 | 6,519.50 | 6.75 | 6,770.25 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.177 | MILE | 6,500.00 | 98,650.50 | 5,500.00 | 83,473.50 | 6,575.00 | 99,788.78 | 7,425.00 | 112,689.23 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.942 | MILE | 2,250.00 | 8,869.50 | 1,900.00 | 7,489.80 | 2,200.00 | 8,672.40 | 2,497.50 | 9,845.15 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.198 | MILE | 10,000.00 | 1,980.00 | 8,200.00 | 1,623.60 | 10,150.00 | 2,009.70 | 11,475.00 | 2,272.05 | | 0053 | 735-01-00100 | Mailboxes | 55 | EACH | 10.00 | 550.00 | 25.00 | 1,375.00 | 24.00 | 1,320.00 | 27.00 | 1,485.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 55 | EACH | 300.00 | 16,500.00 | 260.00 | 14,300.00 | 300.00 | 16,500.00 | 337.50 | 18,562.50 | | 0055 | 739-01-00100 | Hydro-Seeding | 5.14 | ACRE | 3,250.00 | 16,705.00 | 2,600.00 | 13,364.00 | 3,200.00 | 16,448.00 | 3,486.86 | 17,922.46 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 311,850.00 | 311,850.00 | | 0057 | 815-03-00200 | Joint Seal (Preformed Silicone) | 775 | LNFT | 235.00 | 182,125.00 | 150.00 | 116,250.00 | 30.00 | 23,250.00 | 63.45 | 49,173.75 | | 0058 | 815-03-00300 | Joint Seal (Poured) | 280 | LNFT | 65.00 | 18,200.00 | 85.00 | 23,800.00 | 50.00 | 14,000.00 | 42.92 | 12,017.60 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,377,822.20 | | 7,815,665.20 | | 7,969,939.66 | | 8,492,868.11 |
|