Proposal:H.010354.6
Parish:Vernon
Routes:LA 111
Description:LA 111: US 171 - LA 117
Type Construction:BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,999,034.14
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $7,024,604.75 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $7,878,764.53 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $7,924,953.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of CATTLE GUARD | 2 | EACH | 5,000.00 | 10,000.00 | 5,100.00 | 10,200.00 | 15,000.00 | 30,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 132 | SQYD | 20.00 | 2,640.00 | 75.00 | 9,900.00 | 160.00 | 21,120.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 2,400 | LNFT | 15.00 | 36,000.00 | 7.00 | 16,800.00 | 16.00 | 38,400.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 86 | LNFT | 25.00 | 2,150.00 | 50.00 | 4,300.00 | 22.00 | 1,892.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (36" RCP) | 64 | LNFT | 25.00 | 1,600.00 | 65.00 | 4,160.00 | 26.00 | 1,664.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,255 | CUYD | 30.00 | 67,650.00 | 65.00 | 146,575.00 | 45.00 | 101,475.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 275.00 | 3,300.00 | 130.00 | 1,560.00 | 400.00 | 4,800.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 10.00 | 3,000.00 | 5.00 | 1,500.00 | 12.00 | 3,600.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 300 | SQYD | 35.00 | 10,500.00 | 50.00 | 15,000.00 | 10.00 | 3,000.00 | | 0010 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 90,391 | SQYD | 15.25 | 1,378,462.75 | 16.00 | 1,446,256.00 | 16.00 | 1,446,256.00 | | 0011 | 304-01-00100 | Lime | 96.6 | TON | 535.00 | 51,681.00 | 375.00 | 36,225.00 | 450.00 | 43,470.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 10,222 | SQYD | 5.50 | 56,221.00 | 9.00 | 91,998.00 | 4.25 | 43,443.50 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,925 | CUYD | 40.00 | 117,000.00 | 60.00 | 175,500.00 | 90.00 | 263,250.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 55.00 | 27,500.00 | 45.00 | 22,500.00 | 45.00 | 22,500.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 25,236.9 | TON | 117.00 | 2,952,717.30 | 147.00 | 3,709,824.30 | 145.00 | 3,659,350.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,715 | TON | 195.00 | 529,425.00 | 147.00 | 399,105.00 | 215.00 | 583,725.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 111,052 | SQYD | 2.65 | 294,287.80 | 3.00 | 333,156.00 | 3.00 | 333,156.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,630 | CUYD | 0.01 | -46.30 | 1.00 | -4,630.00 | 1.00 | -4,630.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 524 | SQYD | 155.00 | 81,220.00 | 175.00 | 91,700.00 | 155.00 | 81,220.00 | | 0020 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 96 | LNFT | 350.00 | 33,600.00 | 450.00 | 43,200.00 | 300.00 | 28,800.00 | | 0021 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 64 | LNFT | 395.00 | 25,280.00 | 450.00 | 28,800.00 | 350.00 | 22,400.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 150 | LNFT | 10.00 | 1,500.00 | 7.00 | 1,050.00 | 18.00 | 2,700.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,125 | LNFT | 35.00 | 39,375.00 | 31.00 | 34,875.00 | 32.00 | 36,000.00 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 500 | LNFT | 150.00 | 75,000.00 | 121.00 | 60,500.00 | 127.00 | 63,500.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 20 | EACH | 4,000.00 | 80,000.00 | 3,200.00 | 64,000.00 | 3,650.00 | 73,000.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 100,000.00 | 100,000.00 | 85,000.00 | 85,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.111 | MILE | 650.00 | 16,322.15 | 225.00 | 5,649.98 | 154.00 | 3,867.09 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.304 | MILE | 700.00 | 12,112.80 | 750.00 | 12,978.00 | 600.00 | 10,382.40 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 81.905 | MILE | 900.00 | 73,714.50 | 850.00 | 69,619.25 | 800.00 | 65,524.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 8.12 | TON | 1,000.00 | 8,120.00 | 900.00 | 7,308.00 | 900.00 | 7,308.00 | | 0031 | 717-01-00100 | Seeding | 244 | LB | 15.00 | 3,660.00 | 17.00 | 4,148.00 | 13.00 | 3,172.00 | | 0032 | 718-01-00100 | Fertilizer | 4,060 | LB | 0.75 | 3,045.00 | 0.75 | 3,045.00 | 0.65 | 2,639.00 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | | 0034 | 726-01-00100 | Bedding Material | 40.4 | CUYD | 150.00 | 6,060.00 | 170.00 | 6,868.00 | 190.00 | 7,676.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 650,000.00 | 650,000.00 | 708,000.00 | 708,000.00 | 585,000.00 | 585,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 125.00 | 750.00 | 77.00 | 462.00 | 110.00 | 660.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 150.00 | 3,000.00 | 92.00 | 1,840.00 | 135.00 | 2,700.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,559 | EACH | 6.25 | 9,743.75 | 7.00 | 10,913.00 | 6.00 | 9,354.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 15 | LNFT | 25.00 | 375.00 | 22.00 | 330.00 | 22.00 | 330.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.302 | MILE | 6,500.00 | 177,463.00 | 4,500.00 | 122,859.00 | 5,700.00 | 155,621.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.768 | MILE | 2,500.00 | 14,420.00 | 1,500.00 | 8,652.00 | 2,300.00 | 13,266.40 | | 0042 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 1,000.00 | 1,000.00 | 1,100.00 | 1,100.00 | 950.00 | 950.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.122 | MILE | 10,000.00 | 1,220.00 | 15,000.00 | 1,830.00 | 8,000.00 | 976.00 | | 0044 | 735-01-00100 | Mailboxes | 72 | EACH | 10.00 | 720.00 | 26.00 | 1,872.00 | 1.00 | 72.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 56 | EACH | 300.00 | 16,800.00 | 280.00 | 15,680.00 | 285.00 | 15,960.00 | | 0046 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 350.00 | 2,800.00 | 510.00 | 4,080.00 | 325.00 | 2,600.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | | 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,246 | INLF | 2.50 | 3,115.00 | 6.00 | 7,476.00 | 2.25 | 2,803.50 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,024,604.75 | | 7,878,764.53 | | 7,924,953.79 |
|