Proposal:H.002320.6-R1
Parish:East Baton Rouge
Routes:LA 3034, LA 408
Description:SULLIVAN ROAD (WAX - HOOPER)
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, TEMPORARY DETOUR ROAD, ALTERNATE AA1: STONE BASE; ALTERNATE AA2: STONE AND SOIL CEMENT BASE; AND RELATED WORK.
Estimated Construction Cost:$17,427,829.25
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $11,575,589.20 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $12,624,961.62 |
| 3 | 06276 | Barriere Construction Co., LLC | $14,020,924.10 |
| 4 | 29595 | Boone Services LLC | $15,418,314.19 |
| 5 | 55950 | Brown Industrial Construction, LLC | $16,681,857.79 |
| 6 | 34263 | La Contracting Enterprise LLC | $17,363,242.45 |
| 7 | 00046 | Barber Bros. Contracting Co., L.L.C | $17,923,201.40 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $18,564,542.76 |
| | 48896 | Command Construction Industries LLC | $14,385,973.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Barriere Construction Co., LLC | - 4 - Boone Services LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 110,000.00 | 110,000.00 | 282,206.00 | 282,206.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 819 | SQYD | 13.56 | 11,105.64 | 14.00 | 11,466.00 | 20.00 | 16,380.00 | 21.77 | 17,829.63 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 12,821 | SQYD | 12.75 | 163,467.75 | 6.00 | 76,926.00 | 20.00 | 256,420.00 | 32.92 | 422,067.32 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 55 | EACH | 500.00 | 27,500.00 | 600.00 | 33,000.00 | 500.00 | 27,500.00 | 1,191.00 | 65,505.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 805.7 | LNFT | 11.00 | 8,862.70 | 16.00 | 12,891.20 | 10.00 | 8,057.00 | 12.19 | 9,821.48 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,704 | SQYD | 14.00 | 65,856.00 | 13.50 | 63,504.00 | 20.00 | 94,080.00 | 16.02 | 75,358.08 | | 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 500.00 | 500.00 | 575.00 | 575.00 | 700.00 | 700.00 | 2,565.00 | 2,565.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 13 | SQYD | 14.00 | 182.00 | 48.00 | 624.00 | 20.00 | 260.00 | 82.00 | 1,066.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 19 | EACH | 27.50 | 522.50 | 26.00 | 494.00 | 50.00 | 950.00 | 30.00 | 570.00 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 25,000.00 | 25,000.00 | 10,750.00 | 10,750.00 | 11,000.00 | 11,000.00 | 19,938.00 | 19,938.00 | | 0011 | 202-03-38000 | Relocation of Sign | 2 | EACH | 110.00 | 220.00 | 102.50 | 205.00 | 200.00 | 400.00 | 118.00 | 236.00 | | 0012 | 203-01-00100 | General Excavation | 13,630.6 | CUYD | 16.50 | 224,904.90 | 17.00 | 231,720.20 | 18.00 | 245,350.80 | 28.94 | 394,469.56 | | 0013 | 203-03-00100 | Embankment | 11,101.5 | CUYD | 27.00 | 299,740.50 | 24.25 | 269,211.38 | 32.00 | 355,248.00 | 30.89 | 342,925.34 | | 0014 | 204-02-00100 | Temporary Hay Bales | 68 | EACH | 27.50 | 1,870.00 | 36.00 | 2,448.00 | 35.00 | 2,380.00 | 53.00 | 3,604.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 275.00 | 21,725.00 | 180.00 | 14,220.00 | 175.00 | 13,825.00 | 222.00 | 17,538.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 12,160 | LNFT | 2.75 | 33,440.00 | 2.05 | 24,928.00 | 2.00 | 24,320.00 | 5.02 | 61,043.20 | | 0017 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 7,000.00 | 21,000.00 | 4,685.00 | 14,055.00 | 3,000.00 | 9,000.00 | 9,619.00 | 28,857.00 | | 0018 | 304-01-00100 | Lime | 439.57 | TON | 300.00 | 131,871.00 | 325.00 | 142,860.25 | 20.00 | 8,791.40 | 304.36 | 133,787.53 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 31,009.8 | SQYD | 3.50 | 108,534.30 | 2.75 | 85,276.95 | 0.10 | 3,100.98 | 7.48 | 231,953.30 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 87 | CUYD | 125.00 | 10,875.00 | 190.00 | 16,530.00 | 200.00 | 17,400.00 | 194.42 | 16,914.54 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2,000 | CUYD | 125.00 | 250,000.00 | 114.00 | 228,000.00 | 2.00 | 4,000.00 | 190.20 | 380,400.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 2,650.4 | TON | 165.00 | 437,316.00 | 151.75 | 402,198.20 | 220.00 | 583,088.00 | 254.84 | 675,427.94 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2.4 | TON | 275.00 | 660.00 | 256.00 | 614.40 | 2,250.00 | 5,400.00 | 3,331.00 | 7,994.40 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 8,883 | SQYD | 5.50 | 48,856.50 | 5.15 | 45,747.45 | 4.50 | 39,973.50 | 5.51 | 48,945.33 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -494 | CUYD | 0.01 | -4.94 | 0.01 | -4.94 | 0.01 | -4.94 | 0.00 | 0.00 | | 0026 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 456.5 | SQYD | 210.00 | 95,865.00 | 190.75 | 87,077.38 | 200.00 | 91,300.00 | 346.17 | 158,026.61 | | 0027 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 25,201.4 | SQYD | 88.50 | 2,230,323.90 | 109.00 | 2,746,952.60 | 110.00 | 2,772,154.00 | 114.04 | 2,873,967.66 | | 0028 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 784.1 | SQYD | 150.00 | 117,615.00 | 115.00 | 90,171.50 | 110.00 | 86,251.00 | 155.94 | 122,272.55 | | 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 33 | EACH | 750.00 | 24,750.00 | 325.00 | 10,725.00 | 300.00 | 9,900.00 | 823.00 | 27,159.00 | | 0030 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 4,066 | LNFT | 100.00 | 406,600.00 | 133.00 | 540,778.00 | 130.00 | 528,580.00 | 123.75 | 503,167.50 | | 0031 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,176 | LNFT | 115.00 | 250,240.00 | 137.00 | 298,112.00 | 140.00 | 304,640.00 | 137.30 | 298,764.80 | | 0032 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,179 | LNFT | 186.00 | 219,294.00 | 197.50 | 232,852.50 | 160.00 | 188,640.00 | 181.95 | 214,519.05 | | 0033 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 477 | LNFT | 205.00 | 97,785.00 | 212.50 | 101,362.50 | 260.00 | 124,020.00 | 241.66 | 115,271.82 | | 0034 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 788 | LNFT | 280.00 | 220,640.00 | 282.00 | 222,216.00 | 350.00 | 275,800.00 | 298.22 | 234,997.36 | | 0035 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 594 | LNFT | 200.00 | 118,800.00 | 216.00 | 128,304.00 | 250.00 | 148,500.00 | 208.77 | 124,009.38 | | 0036 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 30 | LNFT | 120.00 | 3,600.00 | 141.00 | 4,230.00 | 140.00 | 4,200.00 | 140.15 | 4,204.50 | | 0037 | 701-07-00300 | Yard Drain Pipe (8") | 677 | LNFT | 65.00 | 44,005.00 | 96.50 | 65,330.50 | 50.00 | 33,850.00 | 95.55 | 64,687.35 | | 0038 | 701-14-00100 | Cleaning Existing Pipes | 2,000 | LNFT | 12.50 | 25,000.00 | 9.50 | 19,000.00 | 30.00 | 60,000.00 | 16.41 | 32,820.00 | | 0039 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,500.00 | 2,500.00 | 590.00 | 590.00 | 5,000.00 | 5,000.00 | 3,486.00 | 3,486.00 | | 0040 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,036 | LNFT | 12.00 | 108,432.00 | 5.35 | 48,342.60 | 0.01 | 90.36 | 1.26 | 11,385.36 | | 0041 | 702-02-00200 | Manholes (R-CB-11) | 22 | EACH | 4,800.00 | 105,600.00 | 6,725.00 | 147,950.00 | 10,000.00 | 220,000.00 | 7,487.00 | 164,714.00 | | 0042 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 6,500.00 | 13,000.00 | 6,265.00 | 12,530.00 | 12,000.00 | 24,000.00 | 11,263.00 | 22,526.00 | | 0043 | 702-03-00100 | Catch Basins (CB-01) | 53 | EACH | 4,600.00 | 243,800.00 | 5,045.00 | 267,385.00 | 5,000.00 | 265,000.00 | 5,611.00 | 297,383.00 | | 0044 | 702-03-00400 | Catch Basins (CB-05) | 38 | EACH | 2,200.00 | 83,600.00 | 2,562.00 | 97,356.00 | 1,500.00 | 57,000.00 | 2,423.00 | 92,074.00 | | 0045 | 702-03-00500 | Catch Basins (CB-06) | 43 | EACH | 6,100.00 | 262,300.00 | 7,750.00 | 333,250.00 | 10,000.00 | 430,000.00 | 9,173.00 | 394,439.00 | | 0046 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 12,000.00 | 156,000.00 | 14,875.00 | 193,375.00 | 20,000.00 | 260,000.00 | 17,196.00 | 223,548.00 | | 0047 | 702-03-00800 | Catch Basins (CB-09) | 7 | EACH | 6,500.00 | 45,500.00 | 8,011.00 | 56,077.00 | 12,000.00 | 84,000.00 | 8,884.00 | 62,188.00 | | 0048 | 702-03-01000 | Catch Basins (CB-2TOP02) | 1 | EACH | 9,500.00 | 9,500.00 | 9,395.00 | 9,395.00 | 20,000.00 | 20,000.00 | 10,559.00 | 10,559.00 | | 0049 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,000.00 | 3,000.00 | 3,545.00 | 3,545.00 | 5,000.00 | 5,000.00 | 4,312.00 | 4,312.00 | | 0050 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 14,000.00 | 42,000.00 | 6,960.00 | 20,880.00 | 12,000.00 | 36,000.00 | 9,354.00 | 28,062.00 | | 0051 | 703-03-00100 | Perforated Pipe Underdrains | 9,397 | LNFT | 26.00 | 244,322.00 | 28.50 | 267,814.50 | 23.00 | 216,131.00 | 29.51 | 277,305.47 | | 0052 | 706-01-00300 | Concrete Walk (6" Thick) | 6,189.1 | SQYD | 71.00 | 439,426.10 | 72.45 | 448,400.30 | 70.00 | 433,237.00 | 67.43 | 417,331.01 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 3,280 | SQYD | 78.50 | 257,480.00 | 48.80 | 160,064.00 | 80.00 | 262,400.00 | 74.03 | 242,818.40 | | 0054 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 4,081.6 | SQYD | 81.50 | 332,650.40 | 102.00 | 416,323.20 | 90.00 | 367,344.00 | 102.11 | 416,772.18 | | 0055 | 706-04-00110 | Curb Ramps (Median) | 4.7 | SQYD | 500.00 | 2,350.00 | 522.50 | 2,455.75 | 200.00 | 940.00 | 218.00 | 1,024.60 | | 0056 | 706-04-00110 | Curb Ramps (Type 1) | 51.2 | SQYD | 250.00 | 12,800.00 | 213.00 | 10,905.60 | 200.00 | 10,240.00 | 105.00 | 5,376.00 | | 0057 | 706-04-00110 | Curb Ramps (Type 4) | 71.6 | SQYD | 250.00 | 17,900.00 | 210.00 | 15,036.00 | 200.00 | 14,320.00 | 93.00 | 6,658.80 | | 0058 | 706-04-00110 | Curb Ramps (Type 6) | 27.4 | SQYD | 300.00 | 8,220.00 | 175.00 | 4,795.00 | 200.00 | 5,480.00 | 109.00 | 2,986.60 | | 0059 | 706-04-00110 | Curb Ramps (Type 7) | 26.6 | SQYD | 300.00 | 7,980.00 | 233.00 | 6,197.80 | 200.00 | 5,320.00 | 95.00 | 2,527.00 | | 0060 | 707-01-00100 | Concrete Curb | 13,603.8 | LNFT | 10.50 | 142,839.90 | 6.25 | 85,023.75 | 20.00 | 272,076.00 | 13.90 | 189,092.82 | | 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,907.8 | LNFT | 30.00 | 87,234.00 | 28.00 | 81,418.40 | 60.00 | 174,468.00 | 46.24 | 134,456.67 | | 0062 | 708-01-00100 | Right-of-Way Monument | 64 | EACH | 700.00 | 44,800.00 | 615.00 | 39,360.00 | 600.00 | 38,400.00 | 741.00 | 47,424.00 | | 0063 | 710-01-00100 | Flowable Fill | 2 | CUYD | 400.00 | 800.00 | 1,600.00 | 3,200.00 | 1,000.00 | 2,000.00 | 2,364.00 | 4,728.00 | | 0064 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 169,000.00 | 169,000.00 | 200,000.00 | 200,000.00 | 60,086.00 | 60,086.00 | | 0065 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 440 | LNFT | 1.10 | 484.00 | 1.05 | 462.00 | 1.00 | 440.00 | 1.18 | 519.20 | | 0066 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.46 | MILE | 6,600.00 | 3,036.00 | 5,950.00 | 2,737.00 | 2,500.00 | 1,150.00 | 9,400.00 | 4,324.00 | | 0067 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 12.89 | MILE | 8,800.00 | 113,432.00 | 820.00 | 10,569.80 | 9,000.00 | 116,010.00 | 9,400.00 | 121,166.00 | | 0068 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 8 | EACH | 55.00 | 440.00 | 51.25 | 410.00 | 50.00 | 400.00 | 59.00 | 472.00 | | 0069 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 8 | EACH | 55.00 | 440.00 | 51.25 | 410.00 | 50.00 | 400.00 | 59.00 | 472.00 | | 0070 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 55.00 | 770.00 | 51.25 | 717.50 | 50.00 | 700.00 | 59.00 | 826.00 | | 0071 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 55.00 | 165.00 | 51.25 | 153.75 | 50.00 | 150.00 | 59.00 | 177.00 | | 0072 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 4 | EACH | 55.00 | 220.00 | 51.25 | 205.00 | 50.00 | 200.00 | 59.00 | 236.00 | | 0073 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 19 | EACH | 55.00 | 1,045.00 | 51.25 | 973.75 | 50.00 | 950.00 | 59.00 | 1,121.00 | | 0074 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 32,000.00 | 128,000.00 | 20,000.00 | 80,000.00 | 5,000.00 | 20,000.00 | 29,336.00 | 117,344.00 | | 0075 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) (ILEX CORNUTA 'CARISSA' HOLLY) | 250 | EACH | 135.00 | 33,750.00 | 565.00 | 141,250.00 | 80.00 | 20,000.00 | 89.00 | 22,250.00 | | 0076 | 719-02-00100 | Top Dressing Mulch (3" Depth) (PINE STRAW) | 160 | SQYD | 40.00 | 6,400.00 | 77.00 | 12,320.00 | 80.00 | 12,800.00 | 88.13 | 14,100.80 | | 0077 | 719-03-00400 | Bed Preparation ( ____" Depth) (12" DEPTH) | 160 | SQYD | 55.00 | 8,800.00 | 82.00 | 13,120.00 | 80.00 | 12,800.00 | 94.00 | 15,040.00 | | 0078 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 52,002.00 | 52,002.00 | | 0079 | 725-01-00100 | Temporary Detour Roads | 1,284.1 | SQYD | 145.00 | 186,194.50 | 117.00 | 150,239.70 | 188.00 | 241,410.80 | 155.21 | 199,305.16 | | 0080 | 726-01-00100 | Bedding Material | 852 | CUYD | 116.00 | 98,832.00 | 145.00 | 123,540.00 | 130.00 | 110,760.00 | 86.06 | 73,323.12 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 1,250,000.00 | 1,250,000.00 | 1,400,000.00 | 1,400,000.00 | 1,486,643.00 | 1,486,643.00 | | 0082 | 729-01-00100 | Sign (Type A) | 391.7 | SQFT | 61.00 | 23,893.70 | 36.00 | 14,101.20 | 40.00 | 15,668.00 | 42.00 | 16,451.40 | | 0083 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 99.00 | 990.00 | 92.00 | 920.00 | 120.00 | 1,200.00 | 106.00 | 1,060.00 | | 0084 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 24 | EACH | 275.00 | 6,600.00 | 257.00 | 6,168.00 | 300.00 | 7,200.00 | 294.00 | 7,056.00 | | 0085 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,078 | EACH | 8.50 | 17,663.00 | 7.70 | 16,000.60 | 8.00 | 16,624.00 | 9.00 | 18,702.00 | | 0086 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,765 | LNFT | 3.30 | 12,424.50 | 3.10 | 11,671.50 | 5.00 | 18,825.00 | 3.53 | 13,290.45 | | 0087 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,432 | LNFT | 14.50 | 20,764.00 | 13.35 | 19,117.20 | 15.00 | 21,480.00 | 15.28 | 21,880.96 | | 0088 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 292 | LNFT | 4.40 | 1,284.80 | 4.10 | 1,197.20 | 5.00 | 1,460.00 | 4.70 | 1,372.40 | | 0089 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 16.50 | 792.00 | 15.50 | 744.00 | 16.00 | 768.00 | 17.63 | 846.24 | | 0090 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.76 | MILE | 8,250.00 | 39,270.00 | 7,691.00 | 36,609.16 | 8,000.00 | 38,080.00 | 8,813.00 | 41,949.88 | | 0091 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.941 | MILE | 1,650.00 | 3,202.65 | 1,540.00 | 2,989.14 | 1,600.00 | 3,105.60 | 1,763.00 | 3,421.98 | | 0092 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.321 | MILE | 1,650.00 | 529.65 | 1,540.00 | 494.34 | 1,600.00 | 513.60 | 1,763.00 | 565.92 | | 0093 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.65 | MILE | 5,500.00 | 3,575.00 | 5,126.00 | 3,331.90 | 5,000.00 | 3,250.00 | 5,875.00 | 3,818.75 | | 0094 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 400.00 | 1,600.00 | 359.00 | 1,436.00 | 400.00 | 1,600.00 | 412.00 | 1,648.00 | | 0095 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 525.00 | 1,050.00 | 462.00 | 924.00 | 500.00 | 1,000.00 | 529.00 | 1,058.00 | | 0096 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 400.00 | 7,200.00 | 359.00 | 6,462.00 | 400.00 | 7,200.00 | 412.00 | 7,416.00 | | 0097 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 400.00 | 2,400.00 | 359.00 | 2,154.00 | 400.00 | 2,400.00 | 412.00 | 2,472.00 | | 0098 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 525.00 | 1,050.00 | 460.00 | 920.00 | 500.00 | 1,000.00 | 529.00 | 1,058.00 | | 0099 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 400.00 | 2,400.00 | 359.00 | 2,154.00 | 400.00 | 2,400.00 | 412.00 | 2,472.00 | | 0100 | 732-05-00100 | Removal of Existing Markings | 1 | MILE | 8,500.00 | 8,500.00 | 7,691.00 | 7,691.00 | 8,000.00 | 8,000.00 | 8,813.00 | 8,813.00 | | 0101 | 735-01-00100 | Mailboxes | 37 | EACH | 22.00 | 814.00 | 20.50 | 758.50 | 20.00 | 740.00 | 24.00 | 888.00 | | 0102 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 275.00 | 8,250.00 | 256.50 | 7,695.00 | 250.00 | 7,500.00 | 294.00 | 8,820.00 | | 0103 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 400.00 | 800.00 | 360.00 | 720.00 | 350.00 | 700.00 | 412.00 | 824.00 | | 0104 | 736-01-00100 | Trenching and Backfilling | 230 | LNFT | 13.00 | 2,990.00 | 11.25 | 2,587.50 | 12.00 | 2,760.00 | 27.51 | 6,327.30 | | 0105 | 736-04-00001 | Signal Pole (Pedestal Pole) | 4 | EACH | 2,400.00 | 9,600.00 | 2,154.00 | 8,616.00 | 2,300.00 | 9,200.00 | 49.00 | 196.00 | | 0106 | 736-04-00450 | Signal Pole (45 foot Creosote Wood Pole) | 4 | EACH | 7,000.00 | 28,000.00 | 5,825.00 | 23,300.00 | 7,000.00 | 28,000.00 | 5.00 | 20.00 | | 0107 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 7 | EACH | 1,250.00 | 8,750.00 | 1,128.00 | 7,896.00 | 1,200.00 | 8,400.00 | 1,346.00 | 9,422.00 | | 0108 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 1,250.00 | 3,750.00 | 1,128.00 | 3,384.00 | 1,200.00 | 3,600.00 | 1,346.00 | 4,038.00 | | 0109 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,600.00 | 3,200.00 | 1,487.00 | 2,974.00 | 1,600.00 | 3,200.00 | 1,710.00 | 3,420.00 | | 0110 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,850.00 | 1,850.00 | 1,692.00 | 1,692.00 | 1,800.00 | 1,800.00 | 1,876.00 | 1,876.00 | | 0111 | 736-06-00100 | Signal Service | 1 | EACH | 3,850.00 | 3,850.00 | 3,540.00 | 3,540.00 | 4,000.00 | 4,000.00 | 2,259.00 | 2,259.00 | | 0112 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 8,250.00 | 8,250.00 | 7,588.00 | 7,588.00 | 8,000.00 | 8,000.00 | 7,349.00 | 7,349.00 | | 0113 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 95 | LNFT | 12.50 | 1,187.50 | 11.30 | 1,073.50 | 12.00 | 1,140.00 | 7.40 | 703.00 | | 0114 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 280 | LNFT | 23.50 | 6,580.00 | 21.55 | 6,034.00 | 23.00 | 6,440.00 | 11.18 | 3,130.40 | | 0115 | 736-11-10200 | Conduit (2" Rigid Galv Steel) | 85 | LNFT | 22.00 | 1,870.00 | 20.50 | 1,742.50 | 22.00 | 1,870.00 | 27.51 | 2,338.35 | | 0116 | 736-11-10300 | Conduit (3" Rigid Galv Steel) | 60 | LNFT | 44.00 | 2,640.00 | 41.00 | 2,460.00 | 45.00 | 2,700.00 | 48.98 | 2,938.80 | | 0117 | 736-12-02014 | Conductor (2c, #14 awg) | 1,065 | LNFT | 2.20 | 2,343.00 | 2.05 | 2,183.25 | 2.00 | 2,130.00 | 4.28 | 4,558.20 | | 0118 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 8.80 | 352.00 | 8.25 | 330.00 | 9.00 | 360.00 | 10.16 | 406.40 | | 0119 | 736-12-06014 | Conductor (6c, #14 awg) | 1,315 | LNFT | 3.30 | 4,339.50 | 3.10 | 4,076.50 | 4.00 | 5,260.00 | 5.21 | 6,851.15 | | 0120 | 736-12-10014 | Conductor (10c, #14 awg) | 1,305 | LNFT | 6.60 | 8,613.00 | 6.15 | 8,025.75 | 7.00 | 9,135.00 | 6.13 | 7,999.65 | | 0121 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 4 | EACH | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | 5,396.00 | 21,584.00 | | 0122 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 1,850.00 | 7,400.00 | 1,685.00 | 6,740.00 | 1,800.00 | 7,200.00 | 902.00 | 3,608.00 | | 0123 | 739-01-00100 | Hydro-Seeding | 4.1 | ACRE | 3,000.00 | 12,300.00 | 1,625.00 | 6,662.50 | 3,000.00 | 12,300.00 | 3,114.00 | 12,767.40 | | 0124 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 310,200.00 | 310,200.00 | | 0125 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 38,976 | INLF | 1.15 | 44,822.40 | 1.00 | 38,976.00 | 1.00 | 38,976.00 | 1.12 | 43,653.12 | | 0126 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 28,697 | INLF | 1.45 | 41,610.65 | 1.20 | 34,436.40 | 1.00 | 28,697.00 | 1.30 | 37,306.10 | | 0127 | NS-702-00101 | Paved Gutter Drain (Single) | 2 | EACH | 7,000.00 | 14,000.00 | 3,350.00 | 6,700.00 | 5,000.00 | 10,000.00 | 5,718.00 | 11,436.00 | | 0128 | NS-736-00001 | GPS | 1 | EACH | 660.00 | 660.00 | 575.00 | 575.00 | 600.00 | 600.00 | 466.00 | 466.00 | | 0129 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) SIGNAL RADAR VEHICLE DETECTION SENSOR (STOP BAR) | 4 | EACH | 10,750.00 | 43,000.00 | 9,500.00 | 38,000.00 | 11,000.00 | 44,000.00 | 10,641.00 | 42,564.00 | | 0130 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) SIGNAL RADAR VEHICLE DETECTION SYSTEM CABINET INTERFACE UNIT (CIU) | 1 | EACH | 6,700.00 | 6,700.00 | 6,215.00 | 6,215.00 | 7,000.00 | 7,000.00 | 7,837.00 | 7,837.00 | | 0131 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) SIGNAL RADAR VEHICLE DETECTION (CABLE) | 520 | LNFT | 4.00 | 2,080.00 | 3.60 | 1,872.00 | 4.00 | 2,080.00 | 4.25 | 2,210.00 | | 0132 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 27,500.00 | 27,500.00 | 24,725.00 | 24,725.00 | 26,000.00 | 26,000.00 | 28,781.00 | 28,781.00 | | 0133 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 4 | EACH | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 | 2,200.00 | 8,800.00 | 1,435.00 | 5,740.00 | | 0134 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,750.00 | 5,750.00 | 5,375.00 | 5,375.00 | 6,000.00 | 6,000.00 | 5,123.00 | 5,123.00 | | | | SUBTOTAL GENERAL | | | | 10,366,207 | | 11,541,169 | | 12,470,434 | | 14,010,469 | | | | | | | | | | | | | | | | | Alternate AA1 | ALTERNATE AA1 (STONE BASE) | | | | | | | | | | | | | | | | | | | | | | | | | | 0135 | 302-02-10075 | Class II Base Course (10" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 39.00 | 1,209,382.20 | 0.00 | 0.00 | 50.00 | 1,550,490.00 | 45.40 | 1,407,844.92 | | | | SUBTOTAL ALT AA1 | | | | 1,209,382 | | 00 | | 1,550,490 | | 1,407,845 | | | | | | | | | | | | | | | | | Alternate AA2 | ALTERNATE AA2 (STONE AND SOIL CEMENT BASE) | | | | | | | | | | | | | | | | | | | | | | | | | | 0136 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 0.00 | 0.00 | 15.60 | 483,752.88 | 0.00 | 0.00 | 0.00 | 0.00 | | 0137 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 31,009.8 | SQYD | 0.00 | 0.00 | 19.35 | 600,039.63 | 0.00 | 0.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 1,083,792.51 | | 0.00 | | 0.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,575,589.20 | | 12,624,961.62 | | 14,020,924.10 | | 15,418,314.19 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | - 6 - La Contracting Enterprise LLC | - 7 - Barber Bros. Contracting Co., L.L.C | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 300,000.00 | 300,000.00 | 94,400.00 | 94,400.00 | 170,000.00 | 170,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 819 | SQYD | 6.70 | 5,487.30 | 19.50 | 15,970.50 | 24.00 | 19,656.00 | 45.00 | 36,855.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 12,821 | SQYD | 9.90 | 126,927.90 | 36.00 | 461,556.00 | 25.00 | 320,525.00 | 32.00 | 410,272.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 55 | EACH | 690.00 | 37,950.00 | 1,115.00 | 61,325.00 | 900.00 | 49,500.00 | 900.00 | 49,500.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 805.7 | LNFT | 9.00 | 7,251.30 | 20.00 | 16,114.00 | 22.00 | 17,725.40 | 15.00 | 12,085.50 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,704 | SQYD | 11.00 | 51,744.00 | 20.00 | 94,080.00 | 18.00 | 84,672.00 | 20.00 | 94,080.00 | | 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 2,000.00 | 2,000.00 | 3,700.00 | 3,700.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 13 | SQYD | 200.00 | 2,600.00 | 200.00 | 2,600.00 | 150.00 | 1,950.00 | 190.00 | 2,470.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 19 | EACH | 30.00 | 570.00 | 31.00 | 589.00 | 30.00 | 570.00 | 25.00 | 475.00 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 30,000.00 | 30,000.00 | 13,000.00 | 13,000.00 | 19,000.00 | 19,000.00 | 7,000.00 | 7,000.00 | | 0011 | 202-03-38000 | Relocation of Sign | 2 | EACH | 115.00 | 230.00 | 124.00 | 248.00 | 110.00 | 220.00 | 100.00 | 200.00 | | 0012 | 203-01-00100 | General Excavation | 13,630.6 | CUYD | 21.00 | 286,242.60 | 24.00 | 327,134.40 | 26.00 | 354,395.60 | 35.00 | 477,071.00 | | 0013 | 203-03-00100 | Embankment | 11,101.5 | CUYD | 43.00 | 477,364.50 | 35.00 | 388,552.50 | 34.00 | 377,451.00 | 80.00 | 888,120.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 68 | EACH | 36.50 | 2,482.00 | 37.00 | 2,516.00 | 40.00 | 2,720.00 | 35.00 | 2,380.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 251.00 | 19,829.00 | 180.00 | 14,220.00 | 275.00 | 21,725.00 | 125.00 | 9,875.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 12,160 | LNFT | 2.20 | 26,752.00 | 2.00 | 24,320.00 | 2.70 | 32,832.00 | 7.00 | 85,120.00 | | 0017 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 8,905.00 | 26,715.00 | 7,800.00 | 23,400.00 | 2,500.00 | 7,500.00 | 9,000.00 | 27,000.00 | | 0018 | 304-01-00100 | Lime | 439.57 | TON | 278.00 | 122,200.46 | 330.00 | 145,058.10 | 300.00 | 131,871.00 | 300.00 | 131,871.00 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 31,009.8 | SQYD | 3.50 | 108,534.30 | 5.00 | 155,049.00 | 8.00 | 248,078.40 | 6.00 | 186,058.80 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 87 | CUYD | 182.00 | 15,834.00 | 215.00 | 18,705.00 | 115.00 | 10,005.00 | 180.00 | 15,660.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2,000 | CUYD | 177.00 | 354,000.00 | 215.00 | 430,000.00 | 150.00 | 300,000.00 | 180.00 | 360,000.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 2,650.4 | TON | 171.00 | 453,218.40 | 182.00 | 482,372.80 | 230.00 | 609,592.00 | 148.00 | 392,259.20 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2.4 | TON | 40,104.00 | 96,249.60 | 310.00 | 744.00 | 2,000.00 | 4,800.00 | 250.00 | 600.00 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 8,883 | SQYD | 5.50 | 48,856.50 | 6.00 | 53,298.00 | 8.00 | 71,064.00 | 5.00 | 44,415.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -494 | CUYD | 0.01 | -4.94 | 0.01 | -4.94 | 0.00 | 0.00 | 0.01 | -4.94 | | 0026 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 456.5 | SQYD | 211.00 | 96,321.50 | 230.00 | 104,995.00 | 288.00 | 131,472.00 | 186.00 | 84,909.00 | | 0027 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 25,201.4 | SQYD | 137.00 | 3,452,591.80 | 148.00 | 3,729,807.20 | 115.00 | 2,898,161.00 | 100.00 | 2,520,140.00 | | 0028 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 784.1 | SQYD | 184.00 | 144,274.40 | 138.00 | 108,205.80 | 211.00 | 165,445.10 | 130.00 | 101,933.00 | | 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 33 | EACH | 142.00 | 4,686.00 | 250.00 | 8,250.00 | 350.00 | 11,550.00 | 350.00 | 11,550.00 | | 0030 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 4,066 | LNFT | 156.00 | 634,296.00 | 113.00 | 459,458.00 | 150.00 | 609,900.00 | 200.00 | 813,200.00 | | 0031 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,176 | LNFT | 179.00 | 389,504.00 | 124.00 | 269,824.00 | 172.00 | 374,272.00 | 230.00 | 500,480.00 | | 0032 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,179 | LNFT | 213.00 | 251,127.00 | 159.00 | 187,461.00 | 205.00 | 241,695.00 | 270.00 | 318,330.00 | | 0033 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 477 | LNFT | 271.00 | 129,267.00 | 200.00 | 95,400.00 | 260.00 | 124,020.00 | 300.00 | 143,100.00 | | 0034 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 788 | LNFT | 340.00 | 267,920.00 | 234.00 | 184,392.00 | 330.00 | 260,040.00 | 360.00 | 283,680.00 | | 0035 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 594 | LNFT | 294.00 | 174,636.00 | 231.00 | 137,214.00 | 285.00 | 169,290.00 | 290.00 | 172,260.00 | | 0036 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 30 | LNFT | 144.00 | 4,320.00 | 156.00 | 4,680.00 | 139.00 | 4,170.00 | 270.00 | 8,100.00 | | 0037 | 701-07-00300 | Yard Drain Pipe (8") | 677 | LNFT | 62.00 | 41,974.00 | 70.00 | 47,390.00 | 61.00 | 41,297.00 | 130.00 | 88,010.00 | | 0038 | 701-14-00100 | Cleaning Existing Pipes | 2,000 | LNFT | 29.00 | 58,000.00 | 31.00 | 62,000.00 | 28.00 | 56,000.00 | 23.00 | 46,000.00 | | 0039 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,700.00 | 1,700.00 | 4,300.00 | 4,300.00 | 1,700.00 | 1,700.00 | 8,000.00 | 8,000.00 | | 0040 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,036 | LNFT | 6.00 | 54,216.00 | 11.00 | 99,396.00 | 5.75 | 51,957.00 | 8.00 | 72,288.00 | | 0041 | 702-02-00200 | Manholes (R-CB-11) | 22 | EACH | 8,700.00 | 191,400.00 | 11,200.00 | 246,400.00 | 8,500.00 | 187,000.00 | 15,000.00 | 330,000.00 | | 0042 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 8,700.00 | 17,400.00 | 11,800.00 | 23,600.00 | 8,500.00 | 17,000.00 | 16,000.00 | 32,000.00 | | 0043 | 702-03-00100 | Catch Basins (CB-01) | 53 | EACH | 6,400.00 | 339,200.00 | 5,800.00 | 307,400.00 | 6,100.00 | 323,300.00 | 7,000.00 | 371,000.00 | | 0044 | 702-03-00400 | Catch Basins (CB-05) | 38 | EACH | 4,000.00 | 152,000.00 | 1,500.00 | 57,000.00 | 3,900.00 | 148,200.00 | 3,500.00 | 133,000.00 | | 0045 | 702-03-00500 | Catch Basins (CB-06) | 43 | EACH | 9,900.00 | 425,700.00 | 8,300.00 | 356,900.00 | 9,500.00 | 408,500.00 | 10,000.00 | 430,000.00 | | 0046 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 19,650.00 | 255,450.00 | 16,400.00 | 213,200.00 | 19,000.00 | 247,000.00 | 20,000.00 | 260,000.00 | | 0047 | 702-03-00800 | Catch Basins (CB-09) | 7 | EACH | 11,335.00 | 79,345.00 | 11,200.00 | 78,400.00 | 11,500.00 | 80,500.00 | 20,000.00 | 140,000.00 | | 0048 | 702-03-01000 | Catch Basins (CB-2TOP02) | 1 | EACH | 20,572.00 | 20,572.00 | 17,900.00 | 17,900.00 | 13,500.00 | 13,500.00 | 20,000.00 | 20,000.00 | | 0049 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,701.00 | 1,701.00 | 2,800.00 | 2,800.00 | 1,700.00 | 1,700.00 | 5,000.00 | 5,000.00 | | 0050 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 1,701.00 | 5,103.00 | 10,000.00 | 30,000.00 | 19,700.00 | 59,100.00 | 20,000.00 | 60,000.00 | | 0051 | 703-03-00100 | Perforated Pipe Underdrains | 9,397 | LNFT | 29.00 | 272,513.00 | 35.00 | 328,895.00 | 28.00 | 263,116.00 | 22.00 | 206,734.00 | | 0052 | 706-01-00300 | Concrete Walk (6" Thick) | 6,189.1 | SQYD | 104.00 | 643,666.40 | 93.00 | 575,586.30 | 70.00 | 433,237.00 | 100.00 | 618,910.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 3,280 | SQYD | 115.00 | 377,200.00 | 97.00 | 318,160.00 | 150.00 | 492,000.00 | 100.00 | 328,000.00 | | 0054 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 4,081.6 | SQYD | 104.00 | 424,486.40 | 99.00 | 404,078.40 | 150.00 | 612,240.00 | 80.00 | 326,528.00 | | 0055 | 706-04-00110 | Curb Ramps (Median) | 4.7 | SQYD | 244.00 | 1,146.80 | 680.00 | 3,196.00 | 1,600.00 | 7,520.00 | 550.00 | 2,585.00 | | 0056 | 706-04-00110 | Curb Ramps (Type 1) | 51.2 | SQYD | 244.00 | 12,492.80 | 450.00 | 23,040.00 | 205.00 | 10,496.00 | 250.00 | 12,800.00 | | 0057 | 706-04-00110 | Curb Ramps (Type 4) | 71.6 | SQYD | 244.00 | 17,470.40 | 450.00 | 32,220.00 | 215.00 | 15,394.00 | 250.00 | 17,900.00 | | 0058 | 706-04-00110 | Curb Ramps (Type 6) | 27.4 | SQYD | 244.00 | 6,685.60 | 450.00 | 12,330.00 | 400.00 | 10,960.00 | 300.00 | 8,220.00 | | 0059 | 706-04-00110 | Curb Ramps (Type 7) | 26.6 | SQYD | 244.00 | 6,490.40 | 450.00 | 11,970.00 | 520.00 | 13,832.00 | 350.00 | 9,310.00 | | 0060 | 707-01-00100 | Concrete Curb | 13,603.8 | LNFT | 23.00 | 312,887.40 | 38.00 | 516,944.40 | 22.00 | 299,283.60 | 6.00 | 81,622.80 | | 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,907.8 | LNFT | 45.00 | 130,851.00 | 43.00 | 125,035.40 | 63.00 | 183,191.40 | 35.00 | 101,773.00 | | 0062 | 708-01-00100 | Right-of-Way Monument | 64 | EACH | 538.00 | 34,432.00 | 600.00 | 38,400.00 | 650.00 | 41,600.00 | 600.00 | 38,400.00 | | 0063 | 710-01-00100 | Flowable Fill | 2 | CUYD | 235.00 | 470.00 | 900.00 | 1,800.00 | 1,100.00 | 2,200.00 | 2,000.00 | 4,000.00 | | 0064 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 550,000.00 | 550,000.00 | 400,000.00 | 400,000.00 | 675,000.00 | 675,000.00 | 700,000.00 | 700,000.00 | | 0065 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 440 | LNFT | 0.80 | 352.00 | 1.25 | 550.00 | 1.00 | 440.00 | 1.00 | 440.00 | | 0066 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.46 | MILE | 6,575.00 | 3,024.50 | 9,900.00 | 4,554.00 | 6,500.00 | 2,990.00 | 8,000.00 | 3,680.00 | | 0067 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 12.89 | MILE | 7,595.00 | 97,899.55 | 9,900.00 | 127,611.00 | 7,500.00 | 96,675.00 | 8,000.00 | 103,120.00 | | 0068 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 8 | EACH | 23.00 | 184.00 | 62.00 | 496.00 | 23.00 | 184.00 | 50.00 | 400.00 | | 0069 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 8 | EACH | 23.00 | 184.00 | 62.00 | 496.00 | 23.00 | 184.00 | 50.00 | 400.00 | | 0070 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 23.00 | 322.00 | 62.00 | 868.00 | 23.00 | 322.00 | 50.00 | 700.00 | | 0071 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 23.00 | 69.00 | 62.00 | 186.00 | 23.00 | 69.00 | 50.00 | 150.00 | | 0072 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 4 | EACH | 23.00 | 92.00 | 62.00 | 248.00 | 23.00 | 92.00 | 50.00 | 200.00 | | 0073 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 19 | EACH | 34.00 | 646.00 | 62.00 | 1,178.00 | 35.00 | 665.00 | 50.00 | 950.00 | | 0074 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 24,505.00 | 98,020.00 | 29,000.00 | 116,000.00 | 23,000.00 | 92,000.00 | 22,500.00 | 90,000.00 | | 0075 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) (ILEX CORNUTA 'CARISSA' HOLLY) | 250 | EACH | 42.00 | 10,500.00 | 56.00 | 14,000.00 | 75.00 | 18,750.00 | 200.00 | 50,000.00 | | 0076 | 719-02-00100 | Top Dressing Mulch (3" Depth) (PINE STRAW) | 160 | SQYD | 14.00 | 2,240.00 | 39.00 | 6,240.00 | 5.00 | 800.00 | 200.00 | 32,000.00 | | 0077 | 719-03-00400 | Bed Preparation ( ____" Depth) (12" DEPTH) | 160 | SQYD | 53.00 | 8,480.00 | 154.00 | 24,640.00 | 12.00 | 1,920.00 | 230.00 | 36,800.00 | | 0078 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 81,000.00 | 81,000.00 | 1.00 | 1.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | | 0079 | 725-01-00100 | Temporary Detour Roads | 1,284.1 | SQYD | 112.00 | 143,819.20 | 234.00 | 300,479.40 | 250.00 | 321,025.00 | 250.00 | 321,025.00 | | 0080 | 726-01-00100 | Bedding Material | 852 | CUYD | 37.00 | 31,524.00 | 248.00 | 211,296.00 | 140.00 | 119,280.00 | 120.00 | 102,240.00 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 1,660,000.00 | 1,660,000.00 | 1,515,023.44 | 1,515,023.44 | 1,750,000.00 | 1,750,000.00 | 1,850,000.00 | 1,850,000.00 | | 0082 | 729-01-00100 | Sign (Type A) | 391.7 | SQFT | 39.00 | 15,276.30 | 68.00 | 26,635.60 | 65.00 | 25,460.50 | 60.00 | 23,502.00 | | 0083 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 102.00 | 1,020.00 | 112.00 | 1,120.00 | 100.00 | 1,000.00 | 90.00 | 900.00 | | 0084 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 24 | EACH | 283.00 | 6,792.00 | 300.00 | 7,200.00 | 290.00 | 6,960.00 | 250.00 | 6,000.00 | | 0085 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,078 | EACH | 4.50 | 9,351.00 | 9.00 | 18,702.00 | 4.50 | 9,351.00 | 7.50 | 15,585.00 | | 0086 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,765 | LNFT | 5.20 | 19,578.00 | 3.00 | 11,295.00 | 5.00 | 18,825.00 | 3.00 | 11,295.00 | | 0087 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,432 | LNFT | 16.50 | 23,628.00 | 13.00 | 18,616.00 | 16.50 | 23,628.00 | 13.00 | 18,616.00 | | 0088 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 292 | LNFT | 5.40 | 1,576.80 | 4.00 | 1,168.00 | 5.50 | 1,606.00 | 4.00 | 1,168.00 | | 0089 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 17.35 | 832.80 | 15.00 | 720.00 | 16.75 | 804.00 | 15.00 | 720.00 | | 0090 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.76 | MILE | 6,575.00 | 31,297.00 | 8,000.00 | 38,080.00 | 6,500.00 | 30,940.00 | 7,500.00 | 35,700.00 | | 0091 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.941 | MILE | 2,494.00 | 4,840.85 | 1,600.00 | 3,105.60 | 2,500.00 | 4,852.50 | 1,500.00 | 2,911.50 | | 0092 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.321 | MILE | 8,615.00 | 2,765.42 | 1,600.00 | 513.60 | 8,400.00 | 2,696.40 | 1,500.00 | 481.50 | | 0093 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.65 | MILE | 9,068.00 | 5,894.20 | 5,500.00 | 3,575.00 | 8,900.00 | 5,785.00 | 5,000.00 | 3,250.00 | | 0094 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 453.50 | 1,814.00 | 375.00 | 1,500.00 | 450.00 | 1,800.00 | 350.00 | 1,400.00 | | 0095 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 567.00 | 1,134.00 | 475.00 | 950.00 | 560.00 | 1,120.00 | 450.00 | 900.00 | | 0096 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 453.50 | 8,163.00 | 375.00 | 6,750.00 | 450.00 | 8,100.00 | 350.00 | 6,300.00 | | 0097 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 453.50 | 2,721.00 | 375.00 | 2,250.00 | 450.00 | 2,700.00 | 350.00 | 2,100.00 | | 0098 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 567.00 | 1,134.00 | 475.00 | 950.00 | 550.00 | 1,100.00 | 450.00 | 900.00 | | 0099 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 567.00 | 3,402.00 | 375.00 | 2,250.00 | 550.00 | 3,300.00 | 350.00 | 2,100.00 | | 0100 | 732-05-00100 | Removal of Existing Markings | 1 | MILE | 3,174.00 | 3,174.00 | 8,000.00 | 8,000.00 | 3,200.00 | 3,200.00 | 7,500.00 | 7,500.00 | | 0101 | 735-01-00100 | Mailboxes | 37 | EACH | 23.00 | 851.00 | 25.00 | 925.00 | 23.00 | 851.00 | 20.00 | 740.00 | | 0102 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 283.00 | 8,490.00 | 300.00 | 9,000.00 | 275.00 | 8,250.00 | 250.00 | 7,500.00 | | 0103 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 397.00 | 794.00 | 375.00 | 750.00 | 390.00 | 780.00 | 350.00 | 700.00 | | 0104 | 736-01-00100 | Trenching and Backfilling | 230 | LNFT | 12.50 | 2,875.00 | 14.00 | 3,220.00 | 14.00 | 3,220.00 | 12.00 | 2,760.00 | | 0105 | 736-04-00001 | Signal Pole (Pedestal Pole) | 4 | EACH | 2,380.00 | 9,520.00 | 2,500.00 | 10,000.00 | 1,250.00 | 5,000.00 | 2,100.00 | 8,400.00 | | 0106 | 736-04-00450 | Signal Pole (45 foot Creosote Wood Pole) | 4 | EACH | 6,935.00 | 27,740.00 | 7,500.00 | 30,000.00 | 8,100.00 | 32,400.00 | 6,112.00 | 24,448.00 | | 0107 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 7 | EACH | 1,258.00 | 8,806.00 | 1,300.00 | 9,100.00 | 1,300.00 | 9,100.00 | 1,110.00 | 7,770.00 | | 0108 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 1,258.00 | 3,774.00 | 1,300.00 | 3,900.00 | 1,300.00 | 3,900.00 | 1,110.00 | 3,330.00 | | 0109 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,643.00 | 3,286.00 | 1,700.00 | 3,400.00 | 1,650.00 | 3,300.00 | 1,450.00 | 2,900.00 | | 0110 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,870.00 | 1,870.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 1,650.00 | 1,650.00 | | 0111 | 736-06-00100 | Signal Service | 1 | EACH | 3,910.00 | 3,910.00 | 4,200.00 | 4,200.00 | 2,200.00 | 2,200.00 | 3,450.00 | 3,450.00 | | 0112 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 8,388.00 | 8,388.00 | 9,100.00 | 9,100.00 | 7,000.00 | 7,000.00 | 7,400.00 | 7,400.00 | | 0113 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 95 | LNFT | 12.50 | 1,187.50 | 13.00 | 1,235.00 | 7.00 | 665.00 | 11.00 | 1,045.00 | | 0114 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 280 | LNFT | 24.00 | 6,720.00 | 25.00 | 7,000.00 | 10.60 | 2,968.00 | 21.00 | 5,880.00 | | 0115 | 736-11-10200 | Conduit (2" Rigid Galv Steel) | 85 | LNFT | 23.00 | 1,955.00 | 24.00 | 2,040.00 | 26.00 | 2,210.00 | 20.00 | 1,700.00 | | 0116 | 736-11-10300 | Conduit (3" Rigid Galv Steel) | 60 | LNFT | 45.00 | 2,700.00 | 49.00 | 2,940.00 | 46.50 | 2,790.00 | 40.00 | 2,400.00 | | 0117 | 736-12-02014 | Conductor (2c, #14 awg) | 1,065 | LNFT | 2.25 | 2,396.25 | 2.00 | 2,130.00 | 4.10 | 4,366.50 | 2.00 | 2,130.00 | | 0118 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 9.00 | 360.00 | 9.00 | 360.00 | 9.75 | 390.00 | 8.00 | 320.00 | | 0119 | 736-12-06014 | Conductor (6c, #14 awg) | 1,315 | LNFT | 3.50 | 4,602.50 | 4.00 | 5,260.00 | 5.00 | 6,575.00 | 3.00 | 3,945.00 | | 0120 | 736-12-10014 | Conductor (10c, #14 awg) | 1,305 | LNFT | 6.00 | 7,830.00 | 7.00 | 9,135.00 | 6.00 | 7,830.00 | 6.00 | 7,830.00 | | 0121 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 4 | EACH | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 | 5,100.00 | 20,400.00 | 1,940.00 | 7,760.00 | | 0122 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 1,860.00 | 7,440.00 | 1,700.00 | 6,800.00 | 850.00 | 3,400.00 | 1,640.00 | 6,560.00 | | 0123 | 739-01-00100 | Hydro-Seeding | 4.1 | ACRE | 1,800.00 | 7,380.00 | 3,300.00 | 13,530.00 | 2,500.00 | 10,250.00 | 2,650.00 | 10,865.00 | | 0124 | 740-01-00100 | Construction Layout | 1 | LUMP | 445,000.00 | 445,000.00 | 550,000.00 | 550,000.00 | 450,000.00 | 450,000.00 | 650,000.00 | 650,000.00 | | 0125 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 38,976 | INLF | 0.75 | 29,232.00 | 1.00 | 38,976.00 | 1.00 | 38,976.00 | 0.60 | 23,385.60 | | 0126 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 28,697 | INLF | 1.00 | 28,697.00 | 1.50 | 43,045.50 | 1.00 | 28,697.00 | 1.00 | 28,697.00 | | 0127 | NS-702-00101 | Paved Gutter Drain (Single) | 2 | EACH | 7,368.00 | 14,736.00 | 430.00 | 860.00 | 12,000.00 | 24,000.00 | 12,000.00 | 24,000.00 | | 0128 | NS-736-00001 | GPS | 1 | EACH | 635.00 | 635.00 | 690.00 | 690.00 | 450.00 | 450.00 | 2,000.00 | 2,000.00 | | 0129 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) SIGNAL RADAR VEHICLE DETECTION SENSOR (STOP BAR) | 4 | EACH | 10,429.00 | 41,716.00 | 11,300.00 | 45,200.00 | 10,100.00 | 40,400.00 | 9,200.00 | 36,800.00 | | 0130 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) SIGNAL RADAR VEHICLE DETECTION SYSTEM CABINET INTERFACE UNIT (CIU) | 1 | EACH | 6,869.00 | 6,869.00 | 7,400.00 | 7,400.00 | 7,400.00 | 7,400.00 | 6,060.00 | 6,060.00 | | 0131 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) SIGNAL RADAR VEHICLE DETECTION (CABLE) | 520 | LNFT | 4.00 | 2,080.00 | 4.00 | 2,080.00 | 4.00 | 2,080.00 | 3.50 | 1,820.00 | | 0132 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 27,319.00 | 27,319.00 | 25,000.00 | 25,000.00 | 27,100.00 | 27,100.00 | 24,100.00 | 24,100.00 | | 0133 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 4 | EACH | 2,210.00 | 8,840.00 | 2,000.00 | 8,000.00 | 1,400.00 | 5,600.00 | 1,950.00 | 7,800.00 | | 0134 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,939.00 | 5,939.00 | 5,500.00 | 5,500.00 | 4,900.00 | 4,900.00 | 5,240.00 | 5,240.00 | | | | SUBTOTAL GENERAL | | | | 15,612,020 | | 15,805,000 | | 15,907,564 | | 16,672,945 | | | | | | | | | | | | | | | | | Alternate AA1 | ALTERNATE AA1 (STONE BASE) | | | | | | | | | | | | | | | | | | | | | | | | | | 0135 | 302-02-10075 | Class II Base Course (10" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 34.50 | 1,069,838.10 | 0.00 | 0.00 | 65.00 | 2,015,637.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA1 | | | | 1,069,838 | | 00 | | 2,015,637 | | 00 | | | | | | | | | | | | | | | | | Alternate AA2 | ALTERNATE AA2 (STONE AND SOIL CEMENT BASE) | | | | | | | | | | | | | | | | | | | | | | | | | | 0136 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 0.00 | 0.00 | 31.00 | 961,303.80 | 0.00 | 0.00 | 29.00 | 899,284.20 | | 0137 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 31,009.8 | SQYD | 0.00 | 0.00 | 19.25 | 596,938.65 | 0.00 | 0.00 | 32.00 | 992,313.60 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 1,558,242.45 | | 0.00 | | 1,891,597.80 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 16,681,857.79 | | 17,363,242.45 | | 17,923,201.40 | | 18,564,542.76 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - - Command Construction Industries LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 250,000.00 | 250,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 819 | SQYD | 25.00 | 20,475.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 12,821 | SQYD | 25.00 | 320,525.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 55 | EACH | 1,000.00 | 55,000.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 805.7 | LNFT | 25.00 | 20,142.50 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,704 | SQYD | 25.00 | 117,600.00 | | 0007 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1,000.00 | 1,000.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 13 | SQYD | 25.00 | 325.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 19 | EACH | 100.00 | 1,900.00 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 50,000.00 | 50,000.00 | | 0011 | 202-03-38000 | Relocation of Sign | 2 | EACH | 300.00 | 600.00 | | 0012 | 203-01-00100 | General Excavation | 13,630.6 | CUYD | 30.00 | 408,918.00 | | 0013 | 203-03-00100 | Embankment | 11,101.5 | CUYD | 40.00 | 444,060.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 68 | EACH | 20.00 | 1,360.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 250.00 | 19,750.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 12,160 | LNFT | 5.00 | 60,800.00 | | 0017 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 3,000.00 | 9,000.00 | | 0018 | 304-01-00100 | Lime | 439.57 | TON | 300.00 | 131,871.00 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 31,009.8 | SQYD | 2.00 | 62,019.60 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 87 | CUYD | 150.00 | 13,050.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2,000 | CUYD | 75.00 | 150,000.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 2,650.4 | TON | 170.00 | 450,568.00 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2.4 | TON | 500.00 | 1,200.00 | | 0024 | 509-01-00100 | Milling Asphalt Pavement | 8,883 | SQYD | 8.00 | 71,064.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -494 | CUYD | 0.01 | -4.94 | | 0026 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 456.5 | SQYD | 250.00 | 114,125.00 | | 0027 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 25,201.4 | SQYD | 100.00 | 2,520,140.00 | | 0028 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 784.1 | SQYD | 100.00 | 78,410.00 | | 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 33 | EACH | 500.00 | 16,500.00 | | 0030 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 4,066 | LNFT | 100.00 | 406,600.00 | | 0031 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,176 | LNFT | 120.00 | 261,120.00 | | 0032 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,179 | LNFT | 150.00 | 176,850.00 | | 0033 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 477 | LNFT | 180.00 | 85,860.00 | | 0034 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 788 | LNFT | 220.00 | 173,360.00 | | 0035 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 594 | LNFT | 230.00 | 136,620.00 | | 0036 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 30 | LNFT | 130.00 | 3,900.00 | | 0037 | 701-07-00300 | Yard Drain Pipe (8") | 677 | LNFT | 65.00 | 44,005.00 | | 0038 | 701-14-00100 | Cleaning Existing Pipes | 2,000 | LNFT | 15.00 | 30,000.00 | | 0039 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | | 0040 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,036 | LNFT | 0.01 | 90.36 | | 0041 | 702-02-00200 | Manholes (R-CB-11) | 22 | EACH | 12,000.00 | 264,000.00 | | 0042 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 9,000.00 | 18,000.00 | | 0043 | 702-03-00100 | Catch Basins (CB-01) | 53 | EACH | 4,000.00 | 212,000.00 | | 0044 | 702-03-00400 | Catch Basins (CB-05) | 38 | EACH | 2,000.00 | 76,000.00 | | 0045 | 702-03-00500 | Catch Basins (CB-06) | 43 | EACH | 10,000.00 | 430,000.00 | | 0046 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 20,000.00 | 260,000.00 | | 0047 | 702-03-00800 | Catch Basins (CB-09) | 7 | EACH | 12,000.00 | 84,000.00 | | 0048 | 702-03-01000 | Catch Basins (CB-2TOP02) | 1 | EACH | 12,000.00 | 12,000.00 | | 0049 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | | 0050 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 8,000.00 | 24,000.00 | | 0051 | 703-03-00100 | Perforated Pipe Underdrains | 9,397 | LNFT | 35.00 | 328,895.00 | | 0052 | 706-01-00300 | Concrete Walk (6" Thick) | 6,189.1 | SQYD | 50.00 | 309,455.00 | | 0053 | 706-02-00200 | Concrete Drive (6" Thick) | 3,280 | SQYD | 80.00 | 262,400.00 | | 0054 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 4,081.6 | SQYD | 125.00 | 510,200.00 | | 0055 | 706-04-00110 | Curb Ramps (Median) | 4.7 | SQYD | 250.00 | 1,175.00 | | 0056 | 706-04-00110 | Curb Ramps (Type 1) | 51.2 | SQYD | 180.00 | 9,216.00 | | 0057 | 706-04-00110 | Curb Ramps (Type 4) | 71.6 | SQYD | 180.00 | 12,888.00 | | 0058 | 706-04-00110 | Curb Ramps (Type 6) | 27.4 | SQYD | 180.00 | 4,932.00 | | 0059 | 706-04-00110 | Curb Ramps (Type 7) | 26.6 | SQYD | 180.00 | 4,788.00 | | 0060 | 707-01-00100 | Concrete Curb | 13,603.8 | LNFT | 10.00 | 136,038.00 | | 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,907.8 | LNFT | 28.00 | 81,418.40 | | 0062 | 708-01-00100 | Right-of-Way Monument | 64 | EACH | 300.00 | 19,200.00 | | 0063 | 710-01-00100 | Flowable Fill | 2 | CUYD | 1,000.00 | 2,000.00 | | 0064 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | | 0065 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 440 | LNFT | 1.00 | 440.00 | | 0066 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.46 | MILE | 1,000.00 | 460.00 | | 0067 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 12.89 | MILE | 1,000.00 | 12,890.00 | | 0068 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 8 | EACH | 100.00 | 800.00 | | 0069 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 8 | EACH | 100.00 | 800.00 | | 0070 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 100.00 | 1,400.00 | | 0071 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 100.00 | 300.00 | | 0072 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 4 | EACH | 100.00 | 400.00 | | 0073 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 19 | EACH | 100.00 | 1,900.00 | | 0074 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 12,500.00 | 50,000.00 | | 0075 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) (ILEX CORNUTA 'CARISSA' HOLLY) | 250 | EACH | 80.00 | 20,000.00 | | 0076 | 719-02-00100 | Top Dressing Mulch (3" Depth) (PINE STRAW) | 160 | SQYD | 175.00 | 28,000.00 | | 0077 | 719-03-00400 | Bed Preparation ( ____" Depth) (12" DEPTH) | 160 | SQYD | 80.00 | 12,800.00 | | 0078 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 100,000.00 | 100,000.00 | | 0079 | 725-01-00100 | Temporary Detour Roads | 1,284.1 | SQYD | 300.00 | 385,230.00 | | 0080 | 726-01-00100 | Bedding Material | 852 | CUYD | 150.00 | 127,800.00 | | 0081 | 727-01-00100 | Mobilization | 1 | LUMP | 1,400,000.00 | 1,400,000.00 | | 0082 | 729-01-00100 | Sign (Type A) | 391.7 | SQFT | 75.00 | 29,377.50 | | 0083 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 300.00 | 3,000.00 | | 0084 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 24 | EACH | 1,000.00 | 24,000.00 | | 0085 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,078 | EACH | 7.00 | 14,546.00 | | 0086 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,765 | LNFT | 3.00 | 11,295.00 | | 0087 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,432 | LNFT | 14.00 | 20,048.00 | | 0088 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 292 | LNFT | 4.00 | 1,168.00 | | 0089 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 15.00 | 720.00 | | 0090 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.76 | MILE | 7,500.00 | 35,700.00 | | 0091 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.941 | MILE | 1,500.00 | 2,911.50 | | 0092 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.321 | MILE | 1,500.00 | 481.50 | | 0093 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.65 | MILE | 5,000.00 | 3,250.00 | | 0094 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 500.00 | 2,000.00 | | 0095 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 500.00 | 1,000.00 | | 0096 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 500.00 | 9,000.00 | | 0097 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 500.00 | 3,000.00 | | 0098 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 500.00 | 1,000.00 | | 0099 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 500.00 | 3,000.00 | | 0100 | 732-05-00100 | Removal of Existing Markings | 1 | MILE | 10,000.00 | 10,000.00 | | 0101 | 735-01-00100 | Mailboxes | 37 | EACH | 25.00 | 925.00 | | 0102 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 250.00 | 7,500.00 | | 0103 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 500.00 | 1,000.00 | | 0104 | 736-01-00100 | Trenching and Backfilling | 230 | LNFT | 11.00 | 2,530.00 | | 0105 | 736-04-00001 | Signal Pole (Pedestal Pole) | 4 | EACH | 2,200.00 | 8,800.00 | | 0106 | 736-04-00450 | Signal Pole (45 foot Creosote Wood Pole) | 4 | EACH | 6,000.00 | 24,000.00 | | 0107 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 7 | EACH | 1,250.00 | 8,750.00 | | 0108 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 1,250.00 | 3,750.00 | | 0109 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,500.00 | 3,000.00 | | 0110 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,750.00 | 1,750.00 | | 0111 | 736-06-00100 | Signal Service | 1 | EACH | 4,000.00 | 4,000.00 | | 0112 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 7,500.00 | 7,500.00 | | 0113 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 95 | LNFT | 12.00 | 1,140.00 | | 0114 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 280 | LNFT | 25.00 | 7,000.00 | | 0115 | 736-11-10200 | Conduit (2" Rigid Galv Steel) | 85 | LNFT | 25.00 | 2,125.00 | | 0116 | 736-11-10300 | Conduit (3" Rigid Galv Steel) | 60 | LNFT | 45.00 | 2,700.00 | | 0117 | 736-12-02014 | Conductor (2c, #14 awg) | 1,065 | LNFT | 3.00 | 3,195.00 | | 0118 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 10.00 | 400.00 | | 0119 | 736-12-06014 | Conductor (6c, #14 awg) | 1,315 | LNFT | 4.00 | 5,260.00 | | 0120 | 736-12-10014 | Conductor (10c, #14 awg) | 1,305 | LNFT | 7.00 | 9,135.00 | | 0121 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 4 | EACH | 2,000.00 | 8,000.00 | | 0122 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 4 | EACH | 2,000.00 | 8,000.00 | | 0123 | 739-01-00100 | Hydro-Seeding | 4.1 | ACRE | 3,000.00 | 12,300.00 | | 0124 | 740-01-00100 | Construction Layout | 1 | LUMP | 500,000.00 | 500,000.00 | | 0125 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 38,976 | INLF | 1.00 | 38,976.00 | | 0126 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 28,697 | INLF | 1.00 | 28,697.00 | | 0127 | NS-702-00101 | Paved Gutter Drain (Single) | 2 | EACH | 5,000.00 | 10,000.00 | | 0128 | NS-736-00001 | GPS | 1 | EACH | 1,000.00 | 1,000.00 | | 0129 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) SIGNAL RADAR VEHICLE DETECTION SENSOR (STOP BAR) | 4 | EACH | 10,000.00 | 40,000.00 | | 0130 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) SIGNAL RADAR VEHICLE DETECTION SYSTEM CABINET INTERFACE UNIT (CIU) | 1 | EACH | 7,500.00 | 7,500.00 | | 0131 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) SIGNAL RADAR VEHICLE DETECTION (CABLE) | 520 | LNFT | 5.00 | 2,600.00 | | 0132 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 25,000.00 | 25,000.00 | | 0133 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 4 | EACH | 2,000.00 | 8,000.00 | | 0134 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,000.00 | 5,000.00 | | | | SUBTOTAL GENERAL | | | | 13,393,659 | | | | | | | | | | | Alternate AA1 | ALTERNATE AA1 (STONE BASE) | | | | | | | | | | | | | | 0135 | 302-02-10075 | Class II Base Course (10" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 48.00 | 1,488,470.40 | | | | SUBTOTAL ALT AA1 | | | | 1,488,470 | | | | | | | | | | | Alternate AA2 | ALTERNATE AA2 (STONE AND SOIL CEMENT BASE) | | | | | | | | | | | | | | 0136 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 31,009.8 | SQYD | 20.00 | 620,196.00 | | 0137 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 31,009.8 | SQYD | 12.00 | 372,117.60 | | | | SUBTOTAL ALT AA2 | | | | 992,313.60 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 14,385,973.02 |
|