Proposal:H.015775.6
Parish:Red River
Routes:LA 515
Description:LA 515: US 71 - LA 514
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,898,829.79
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $2,619,571.85 |
| 2 | 17464 | Benton & Brown, LLC. | $2,743,997.05 |
| 3 | 08584 | Madden Contracting Co., LLC | $3,152,885.03 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | - 3 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 778.1 | LNFT | 12.00 | 9,337.20 | 13.00 | 10,115.30 | 18.00 | 14,005.80 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) Station 212+35 | 4 | LNFT | 50.00 | 200.00 | 100.00 | 400.00 | 500.00 | 2,000.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,248 | CUYD | 30.00 | 37,440.00 | 20.00 | 24,960.00 | 48.90 | 61,027.20 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 1,392.5 | LNFT | 5.00 | 6,962.50 | 2.00 | 2,785.00 | 4.00 | 5,570.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5.5 | CUYD | 100.00 | 550.00 | 1,250.00 | 6,875.00 | 150.00 | 825.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 10,196.6 | TON | 144.25 | 1,470,859.55 | 150.00 | 1,529,490.00 | 155.35 | 1,584,041.81 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 373.8 | TON | 147.00 | 54,948.60 | 175.00 | 65,415.00 | 112.15 | 41,921.67 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 92,148 | SQYD | 5.00 | 460,740.00 | 4.00 | 368,592.00 | 4.20 | 387,021.60 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,845 | CUYD | 0.10 | -384.50 | 0.01 | -38.45 | 0.10 | -384.50 | | 0010 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 981 | SQYD | 75.70 | 74,261.70 | 110.00 | 107,910.00 | 148.45 | 145,629.45 | | 0011 | 701-08-00100 | Relaying Pipe Stations 87+01, 105+68, 184+21, 212+35, 215+48, 218+00, 293+98 | 50 | LNFT | 200.00 | 10,000.00 | 330.00 | 16,500.00 | 350.00 | 17,500.00 | | 0012 | 701-14-00100 | Cleaning Existing Pipes | 88 | LNFT | 200.00 | 17,600.00 | 80.00 | 7,040.00 | 210.00 | 18,480.00 | | 0013 | 701-15-00100 | Concrete Collar | 8 | EACH | 750.00 | 6,000.00 | 1,750.00 | 14,000.00 | 4,100.00 | 32,800.00 | | 0014 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 665.8 | LNFT | 175.00 | 116,515.00 | 193.00 | 128,499.40 | 155.00 | 103,199.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 38.00 | 3,325.00 | 42.00 | 3,675.00 | 34.00 | 2,975.00 | | 0016 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,800.00 | 3,800.00 | 4,200.00 | 4,200.00 | 3,800.00 | 3,800.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,900.00 | 11,700.00 | 4,300.00 | 12,900.00 | 4,150.00 | 12,450.00 | | 0018 | 711-02-00300 | Riprap (30 lb) | 85 | CUYD | 100.00 | 8,500.00 | 300.00 | 25,500.00 | 400.00 | 34,000.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 404 | SQYD | 2.50 | 1,010.00 | 2.00 | 808.00 | 10.00 | 4,040.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | 187,000.00 | 187,000.00 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.184 | MILE | 500.00 | 6,092.00 | 1,000.00 | 12,184.00 | 300.00 | 3,655.20 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.128 | MILE | 250.00 | 1,032.00 | 275.00 | 1,135.20 | 250.00 | 1,032.00 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.036 | MILE | 1,500.00 | 27,054.00 | 1,650.00 | 29,759.40 | 1,500.00 | 27,054.00 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,000.00 | 3,000.00 | 4,400.00 | 4,400.00 | 4,000.00 | 4,000.00 | | 0025 | 717-01-00100 | Seeding | 33 | LB | 50.00 | 1,650.00 | 38.50 | 1,270.50 | 35.00 | 1,155.00 | | 0026 | 718-01-00100 | Fertilizer | 544 | LB | 2.50 | 1,360.00 | 2.20 | 1,196.80 | 2.00 | 1,088.00 | | 0027 | 726-01-00100 | Bedding Material | 4.9 | CUYD | 200.00 | 980.00 | 200.00 | 980.00 | 800.00 | 3,920.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 65,000.00 | 65,000.00 | 187,000.00 | 187,000.00 | | 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 80.00 | 640.00 | 88.00 | 704.00 | 100.00 | 800.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 138.00 | 552.00 | 135.00 | 540.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,063 | EACH | 8.00 | 8,504.00 | 8.80 | 9,354.40 | 8.00 | 8,504.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.036 | MILE | 5,800.00 | 104,608.80 | 6,400.00 | 115,430.40 | 5,800.00 | 104,608.80 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.128 | MILE | 2,000.00 | 8,256.00 | 2,200.00 | 9,081.60 | 2,000.00 | 8,256.00 | | 0034 | 732-05-00100 | Removal of Existing Markings | 0.079 | MILE | 30,000.00 | 2,370.00 | 33,500.00 | 2,646.50 | 30,000.00 | 2,370.00 | | 0035 | 735-01-00100 | Mailboxes | 12 | EACH | 30.00 | 360.00 | 33.00 | 396.00 | 20.00 | 240.00 | | 0036 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 400.00 | 4,800.00 | 440.00 | 5,280.00 | 305.00 | 3,660.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 31,500.00 | 31,500.00 | | 0038 | NS-701-00010 | Culvert Rehabilitation by Slip Lining | 50 | LNFT | 500.00 | 25,000.00 | 1,300.00 | 65,000.00 | 2,112.00 | 105,600.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,619,571.85 | | 2,743,997.05 | | 3,152,885.03 |
|