Proposal:H.015620.6
Parish:Evangeline, St. Landry
Routes:LA 758
Description:LA 758: US 190 - LA 29
Type Construction:MILLING ASPHALT CONCRETE, SUBGRADE TREATMENT, INPLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,658,275.00
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $4,619,690.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 46 | SQYD | 50.00 | 2,300.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 261 | SQYD | 35.00 | 9,135.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 114 | CUYD | 60.00 | 6,840.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 225.00 | 4,500.00 | | 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 51,468 | SQYD | 13.00 | 669,084.00 | | 0006 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 51,468 | SQYD | 20.00 | 1,029,360.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,071 | CUYD | 39.00 | 80,769.00 | | 0008 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 225 | CUYD | 90.00 | 20,250.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 13,592.7 | TON | 129.00 | 1,753,458.30 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,322.2 | TON | 99.50 | 131,558.90 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 37,736 | SQYD | 2.85 | 107,547.60 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,965 | CUYD | 0.01 | -19.65 | | 0013 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 51 | SQYD | 250.00 | 12,750.00 | | 0014 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 400.00 | 3,200.00 | | 0015 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,750.00 | 5,500.00 | | 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 261.5 | SQYD | 200.00 | 52,300.00 | | 0017 | 712-02-00100 | Sacked Concrete Revetment | 4 | SQYD | 650.00 | 2,600.00 | | 0018 | 712-04-00100 | Flexible Revetment | 7 | SQYD | 180.00 | 1,260.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 140,000.00 | 140,000.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.534 | MILE | 650.00 | 6,197.10 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.232 | MILE | 1.00 | 2.23 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.718 | MILE | 1.00 | 20.72 | | 0023 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 1.00 | 4.00 | | 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 3.177 | MILE | 1,100.00 | 3,494.70 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.354 | MILE | 1,100.00 | 6,989.40 | | 0027 | 726-01-00100 | Bedding Material | 3.9 | CUYD | 175.00 | 682.50 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | | 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 100.00 | 600.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 625 | EACH | 6.00 | 3,750.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.359 | MILE | 5,000.00 | 51,795.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.116 | MILE | 1,500.00 | 1,674.00 | | 0033 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 950.00 | 1,900.00 | | 0034 | 735-01-00100 | Mailboxes | 79 | EACH | 10.00 | 790.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 79 | EACH | 300.00 | 23,700.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | | 0037 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,566 | INLF | 3.00 | 4,698.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,619,690.80 |
|