Proposal:H.015619.6
Parish:Evangeline
Routes:LA 106
Description:LA 106: US 167 - AVOYELLES P/L
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER RETAINING WALL, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ROADWAY REINFORCING MESH, ASPHALT CONCRETE OVERLAY, STEEL SHEETING, AND RELATED WORK.
Estimated Construction Cost:$12,014,151.47
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $12,640,089.27 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $12,770,720.18 |
| 3 | 34356 | Prairie Contractors LLC | $14,213,803.54 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (0.25 acres estimated) | 0.25 | LUMP | 50,000.00 | 50,000.00 | 11,000.00 | 11,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-00010 | Removal of 4' X 2' X 2' Concrete Bridge End Block | 4 | EACH | 2,400.00 | 9,600.00 | 2,200.00 | 8,800.00 | 4,000.00 | 16,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 1,368 | SQYD | 69.00 | 94,392.00 | 14.00 | 19,152.00 | 16.00 | 21,888.00 | | 0005 | 202-02-06020 | Removal of Concrete Box Culverts Existing 2’ x 2’, 3’ x 3’, and 6’ x 5’ | 6 | EACH | 3,000.00 | 18,000.00 | 5,000.00 | 30,000.00 | 4,000.00 | 24,000.00 | | 0006 | 202-02-06040 | Removal of Concrete Box Headwall Existing 8” Headwalls | 12 | EACH | 4,000.00 | 48,000.00 | 5,000.00 | 60,000.00 | 2,750.00 | 33,000.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 510 | SQYD | 85.00 | 43,350.00 | 30.00 | 15,300.00 | 22.00 | 11,220.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 855 | LNFT | 8.00 | 6,840.00 | 15.00 | 12,825.00 | 16.00 | 13,680.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) Removal of Pipe (Side Drain) (12" RCP) | 24 | LNFT | 86.00 | 2,064.00 | 20.00 | 480.00 | 24.00 | 576.00 | | 0010 | 202-02-46000 | Removal of Walls (Timber Retaining Walls) (Sta. 316+56; LT & RT) | 1,650 | SQFT | 7.00 | 11,550.00 | 11.00 | 18,150.00 | 15.00 | 24,750.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 240,000.00 | 240,000.00 | 350,000.00 | 350,000.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 170.00 | 8,500.00 | 125.00 | 6,250.00 | 130.00 | 6,500.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 54,000 | LNFT | 2.00 | 108,000.00 | 1.50 | 81,000.00 | 1.55 | 83,700.00 | | 0014 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 83,888 | SQYD | 9.80 | 822,102.40 | 11.00 | 922,768.00 | 11.00 | 922,768.00 | | 0015 | 303-02-00100 | Removal of Existing Patches | 40 | SQYD | 280.00 | 11,200.00 | 75.00 | 3,000.00 | 80.00 | 3,200.00 | | 0016 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 83,888 | SQYD | 12.40 | 1,040,211.20 | 10.50 | 880,824.00 | 10.25 | 859,852.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,299 | CUYD | 30.00 | 158,970.00 | 45.00 | 238,455.00 | 38.00 | 201,362.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 275 | CUYD | 61.00 | 16,775.00 | 50.00 | 13,750.00 | 80.00 | 22,000.00 | | 0019 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 25 | SQYD | 800.00 | 20,000.00 | 490.00 | 12,250.00 | 240.00 | 6,000.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 36,462.6 | TON | 130.00 | 4,740,138.00 | 125.00 | 4,557,825.00 | 119.00 | 4,339,049.40 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,187 | TON | 240.00 | 524,880.00 | 210.00 | 459,270.00 | 175.00 | 382,725.00 | | 0022 | 509-01-00100 | Milling Asphalt Pavement | 104,695 | SQYD | 4.25 | 444,953.75 | 3.75 | 392,606.25 | 4.00 | 418,780.00 | | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -9,008 | CUYD | 1.00 | -9,008.00 | 1.00 | -9,008.00 | 0.01 | -90.08 | | 0024 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 3,156 | SQYD | 169.00 | 533,364.00 | 139.00 | 438,684.00 | 165.00 | 520,740.00 | | 0025 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 24 | LNFT | 475.00 | 11,400.00 | 291.00 | 6,984.00 | 105.00 | 2,520.00 | | 0026 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 12 | LNFT | 970.00 | 11,640.00 | 350.00 | 4,200.00 | 310.00 | 3,720.00 | | 0027 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,500.00 | 7,000.00 | 2,200.00 | 4,400.00 | 1,800.00 | 3,600.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 50 | LNFT | 300.00 | 15,000.00 | 15.00 | 750.00 | 55.00 | 2,750.00 | | 0029 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 13,000.00 | 13,000.00 | 3,500.00 | 3,500.00 | 6,000.00 | 6,000.00 | | 0030 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 152 | LNFT | 170.00 | 25,840.00 | 141.00 | 21,432.00 | 150.00 | 22,800.00 | | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,289.3 | LNFT | 30.00 | 68,679.00 | 31.00 | 70,968.30 | 35.00 | 80,125.50 | | 0032 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 38.00 | 3,800.00 | 85.00 | 8,500.00 | 90.00 | 9,000.00 | | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 121.00 | 24,200.00 | 129.00 | 25,800.00 | 135.00 | 27,000.00 | | 0034 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 18 | EACH | 3,600.00 | 64,800.00 | 4,000.00 | 72,000.00 | 4,250.00 | 76,500.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 500.9 | SQYD | 200.00 | 100,180.00 | 155.00 | 77,639.50 | 185.00 | 92,666.50 | | 0036 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 75.00 | 8,100.00 | 85.00 | 9,180.00 | 150.00 | 16,200.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 180,000.00 | 180,000.00 | 165,000.00 | 165,000.00 | | 0038 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 144 | LNFT | 0.55 | 79.20 | 0.55 | 79.20 | 0.01 | 1.44 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 16.221 | MILE | 220.00 | 3,568.62 | 154.00 | 2,498.03 | 650.00 | 10,543.65 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 16.221 | MILE | 500.00 | 8,110.50 | 500.00 | 8,110.50 | 1.00 | 16.22 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 62.858 | MILE | 650.00 | 40,857.70 | 650.00 | 40,857.70 | 1.00 | 62.86 | | 0042 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 60.00 | 120.00 | 55.00 | 110.00 | 1.00 | 2.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 5,500.00 | 5,500.00 | 50,000.00 | 50,000.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 8.129 | MILE | 1,000.00 | 8,129.00 | 1,000.00 | 8,129.00 | 1,100.00 | 8,941.90 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 16.258 | MILE | 1,000.00 | 16,258.00 | 1,000.00 | 16,258.00 | 1,100.00 | 17,883.80 | | 0046 | 726-01-00100 | Bedding Material | 63.2 | CUYD | 135.00 | 8,532.00 | 180.00 | 11,376.00 | 155.00 | 9,796.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 647,000.00 | 647,000.00 | 472,000.00 | 472,000.00 | 1,145,000.00 | 1,145,000.00 | | 0048 | 729-01-00100 | Sign (Type A) | 200 | SQFT | 21.00 | 4,200.00 | 30.00 | 6,000.00 | 32.00 | 6,400.00 | | 0049 | 729-01-00103 | Sign (Type A)(Relocate) | 100 | SQFT | 16.00 | 1,600.00 | 10.00 | 1,000.00 | 12.00 | 1,200.00 | | 0050 | 729-16-00200 | Object Marker Assembly (Type 2) | 62 | EACH | 76.00 | 4,712.00 | 110.00 | 6,820.00 | 65.00 | 4,030.00 | | 0051 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 85.00 | 1,700.00 | 125.00 | 2,500.00 | 130.00 | 2,600.00 | | 0052 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 15 | EACH | 127.00 | 1,905.00 | 175.00 | 2,625.00 | 185.00 | 2,775.00 | | 0053 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,030 | EACH | 11.00 | 11,330.00 | 10.00 | 10,300.00 | 11.00 | 11,330.00 | | 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,650 | EACH | 5.25 | 8,662.50 | 5.00 | 8,250.00 | 6.00 | 9,900.00 | | 0055 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 11.00 | 396.00 | 10.00 | 360.00 | 11.00 | 396.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 30.29 | MILE | 5,100.00 | 154,479.00 | 5,000.00 | 151,450.00 | 5,500.00 | 166,595.00 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.754 | MILE | 1,600.00 | 7,606.40 | 1,550.00 | 7,368.70 | 1,650.00 | 7,844.10 | | 0058 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 950.00 | 1,900.00 | 850.00 | 1,700.00 | 850.00 | 1,700.00 | | 0059 | 732-05-00100 | Removal of Existing Markings | 0.065 | MILE | 5,000.00 | 325.00 | 5,000.00 | 325.00 | 6,000.00 | 390.00 | | 0060 | 735-01-00100 | Mailboxes | 104 | EACH | 2.00 | 208.00 | 1.00 | 104.00 | 10.00 | 1,040.00 | | 0061 | 735-02-00100 | Mailbox Supports (Single) | 98 | EACH | 190.00 | 18,620.00 | 200.00 | 19,600.00 | 210.00 | 20,580.00 | | 0062 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 290.00 | 870.00 | 200.00 | 600.00 | 210.00 | 630.00 | | 0063 | 739-01-00100 | Hydro-Seeding | 39.8 | ACRE | 2,700.00 | 107,460.00 | 2,700.00 | 107,460.00 | 2,800.00 | 111,440.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 70,000.00 | 70,000.00 | 1,000.00 | 1,000.00 | | 0065 | 802-02-00100 | Permanent Sheeting (Steel) | 34,002 | SQFT | 35.00 | 1,190,070.00 | 60.00 | 2,040,120.00 | 90.00 | 3,060,180.00 | | 0066 | 805-16-00100 | Reinforced Concrete Box Culverts (Extension) (4' x 4') | 12 | LNFT | 3,000.00 | 36,000.00 | 3,500.00 | 42,000.00 | 2,100.00 | 25,200.00 | | 0067 | 805-16-00700 | Reinforced Concrete Box Culverts (Extension) (6' x 5') | 13 | LNFT | 3,400.00 | 44,200.00 | 3,200.00 | 41,600.00 | 2,500.00 | 32,500.00 | | 0068 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) (2' x 2') | 8 | LNFT | 3,500.00 | 28,000.00 | 2,600.00 | 20,800.00 | 2,000.00 | 16,000.00 | | 0069 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) (3' x 3') | 48 | LNFT | 2,500.00 | 120,000.00 | 2,500.00 | 120,000.00 | 2,000.00 | 96,000.00 | | 0070 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) (4' x 2') | 12 | LNFT | 2,600.00 | 31,200.00 | 2,400.00 | 28,800.00 | 2,000.00 | 24,000.00 | | 0071 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (144+95) (441# STEEL)(5.58 CUYD CONC.) | 2 | EACH | 20,000.00 | 40,000.00 | 15,000.00 | 30,000.00 | 20,000.00 | 40,000.00 | | 0072 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (160+94) (449# STEEL)(5.99 CUYD CONC.) | 2 | EACH | 20,000.00 | 40,000.00 | 17,500.00 | 35,000.00 | 21,000.00 | 42,000.00 | | 0073 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (310+76) (213# STEEL)(2.80 CUYD CONC.) | 2 | EACH | 18,000.00 | 36,000.00 | 12,500.00 | 25,000.00 | 14,000.00 | 28,000.00 | | 0074 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (316+57) (468# STEEL)(3.60 CUYD CONC.) | 2 | EACH | 18,000.00 | 36,000.00 | 18,500.00 | 37,000.00 | 15,500.00 | 31,000.00 | | 0075 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (321+64) (290# STEEL)(2.35 CUYD CONC.) | 2 | EACH | 18,000.00 | 36,000.00 | 12,500.00 | 25,000.00 | 11,500.00 | 23,000.00 | | 0076 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall REINFORCED CONCRETE BOX HEADWALL (370+57) (220# STEEL)(2.76 CUYD CONC.) | 2 | EACH | 18,000.00 | 36,000.00 | 12,500.00 | 25,000.00 | 12,500.00 | 25,000.00 | | 0077 | 815-03-00300 | Joint Seal (Poured) | 1,125 | LNFT | 26.00 | 29,250.00 | 32.00 | 36,000.00 | 45.00 | 50,625.00 | | 0078 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 42,691 | SQYD | 9.00 | 384,219.00 | 9.00 | 384,219.00 | 7.00 | 298,837.00 | | 0079 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 560 | LNFT | 24.00 | 13,440.00 | 4.00 | 2,240.00 | 4.25 | 2,380.00 | | 0080 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 565 | LNFT | 24.00 | 13,560.00 | 5.00 | 2,825.00 | 4.25 | 2,401.25 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 12,640,089.27 | | 12,770,720.18 | | 14,213,803.54 |
|