Proposal:H.015617.6
Parish:Iberia, St. Martin
Routes:LA 31
Description:LA 31: LA 182 - 0.899 MI S LA 92
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$9,207,626.50
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $8,403,696.71 |
| 2 | 34356 | Prairie Contractors LLC | $8,596,931.88 |
| 3 | 51821 | Elliott Construction, LLC | $10,919,631.08 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 1,438 | SQYD | 21.50 | 30,917.00 | 20.00 | 28,760.00 | 25.00 | 35,950.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,874 | SQYD | 35.46 | 66,452.04 | 30.00 | 56,220.00 | 35.00 | 65,590.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 508 | LNFT | 15.54 | 7,894.32 | 16.00 | 8,128.00 | 14.50 | 7,366.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 600 | CUYD | 55.59 | 33,354.00 | 100.00 | 60,000.00 | 40.00 | 24,000.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 44 | EACH | 277.48 | 12,209.12 | 225.00 | 9,900.00 | 160.00 | 7,040.00 | | 0006 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 400 | CUYD | 53.78 | 21,512.00 | 45.00 | 18,000.00 | 100.00 | 40,000.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 35,498.8 | TON | 125.60 | 4,458,649.28 | 123.00 | 4,366,352.40 | 150.00 | 5,324,820.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,053 | TON | 148.88 | 305,650.64 | 100.00 | 205,300.00 | 180.00 | 369,540.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 133,781 | SQYD | 2.48 | 331,776.88 | 2.75 | 367,897.75 | 3.75 | 501,678.75 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,320 | CUYD | 0.01 | -63.20 | 0.01 | -63.20 | 0.01 | -63.20 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 7,689 | SQYD | 178.65 | 1,373,639.85 | 120.00 | 922,680.00 | 160.00 | 1,230,240.00 | | 0012 | 602-10-00100 | Longitudinal Shoulder Joints | 48,014 | LNFT | 2.50 | 120,035.00 | 2.30 | 110,432.20 | 3.00 | 144,042.00 | | 0013 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 17 | EACH | 491.89 | 8,362.13 | 1,000.00 | 17,000.00 | 400.00 | 6,800.00 | | 0014 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 1,180.53 | 3,541.59 | 6,500.00 | 19,500.00 | 2,800.00 | 8,400.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 156.3 | LNFT | 36.07 | 5,637.74 | 35.00 | 5,470.50 | 34.00 | 5,314.20 | | 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 105.44 | 5,272.00 | 100.00 | 5,000.00 | 50.00 | 2,500.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 144.29 | 14,429.00 | 135.00 | 13,500.00 | 135.00 | 13,500.00 | | 0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,106.63 | 16,426.52 | 3,800.00 | 15,200.00 | 4,100.00 | 16,400.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 50 | SQYD | 68.47 | 3,423.50 | 125.00 | 6,250.00 | 120.00 | 6,000.00 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 1,874 | SQYD | 84.02 | 157,453.48 | 178.00 | 333,572.00 | 125.00 | 234,250.00 | | 0021 | 706-04-00110 | Curb Ramps Type 3 | 129.6 | SQYD | 115.04 | 14,909.18 | 505.00 | 65,448.00 | 275.00 | 35,640.00 | | 0022 | 706-04-00110 | Curb Ramps Type 7 | 119.7 | SQYD | 99.03 | 11,853.89 | 580.00 | 69,426.00 | 275.00 | 32,917.50 | | 0023 | 706-04-00110 | Curb Ramps Type 8 | 31 | SQYD | 95.53 | 2,961.43 | 600.00 | 18,600.00 | 300.00 | 9,300.00 | | 0024 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 93.63 | 5,056.02 | 200.00 | 10,800.00 | 200.00 | 10,800.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 190,196.50 | 190,196.50 | 210,000.00 | 210,000.00 | 250,000.00 | 250,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,347 | LNFT | 0.28 | 377.16 | 0.01 | 13.47 | 0.50 | 673.50 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 540 | LNFT | 1.11 | 599.40 | 0.01 | 5.40 | 2.00 | 1,080.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.502 | MILE | 787.02 | 13,774.42 | 650.00 | 11,376.30 | 860.00 | 15,051.72 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.964 | MILE | 665.94 | 9,965.13 | 700.00 | 10,474.80 | 660.00 | 9,876.24 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.398 | MILE | 998.91 | 47,346.34 | 900.00 | 42,658.20 | 990.00 | 46,924.02 | | 0031 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 9 | EACH | 27.75 | 249.75 | 0.01 | 0.09 | 28.00 | 252.00 | | 0032 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 27.75 | 83.25 | 0.01 | 0.03 | 28.00 | 84.00 | | 0033 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 27.75 | 83.25 | 0.01 | 0.03 | 28.00 | 84.00 | | 0034 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 61.04 | 366.24 | 0.01 | 0.06 | 60.00 | 360.00 | | 0035 | 724-01-00100 | Rumble Strips (Centerline) | 4.2 | MILE | 1,109.90 | 4,661.58 | 1,100.00 | 4,620.00 | 1,100.00 | 4,620.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.401 | MILE | 1,109.90 | 9,324.27 | 1,100.00 | 9,241.10 | 1,100.00 | 9,241.10 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 178,063.28 | 178,063.28 | 750,000.00 | 750,000.00 | 1,000,000.00 | 1,000,000.00 | | 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 42 | EACH | 122.09 | 5,127.78 | 80.00 | 3,360.00 | 85.00 | 3,570.00 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 138.74 | 832.44 | 130.00 | 780.00 | 95.00 | 570.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,076 | EACH | 5.28 | 5,681.28 | 5.25 | 5,649.00 | 6.00 | 6,456.00 | | 0041 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 3,696 | LNFT | 1.33 | 4,915.68 | 0.85 | 3,141.60 | 1.50 | 5,544.00 | | 0042 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 449 | LNFT | 3.33 | 1,495.17 | 3.25 | 1,459.25 | 3.50 | 1,571.50 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 180 | LNFT | 11.10 | 1,998.00 | 19.00 | 3,420.00 | 11.00 | 1,980.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.099 | MILE | 4,883.56 | 73,736.87 | 4,700.00 | 70,965.30 | 4,850.00 | 73,230.15 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.988 | MILE | 1,442.87 | 7,197.04 | 1,200.00 | 5,985.60 | 1,450.00 | 7,232.60 | | 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 305.22 | 915.66 | 350.00 | 1,050.00 | 305.00 | 915.00 | | 0047 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 305.22 | 305.22 | 350.00 | 350.00 | 305.00 | 305.00 | | 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 305.22 | 305.22 | 675.00 | 675.00 | 305.00 | 305.00 | | 0049 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 832.43 | 1,664.86 | 1,000.00 | 2,000.00 | 825.00 | 1,650.00 | | 0050 | 735-01-00100 | Mailboxes | 161 | EACH | 38.85 | 6,254.85 | 5.00 | 805.00 | 22.00 | 3,542.00 | | 0051 | 735-02-00100 | Mailbox Supports (Single) | 161 | EACH | 332.97 | 53,608.17 | 225.00 | 36,225.00 | 275.00 | 44,275.00 | | 0052 | 739-01-00100 | Hydro-Seeding | 10 | ACRE | 2,885.74 | 28,857.40 | 3,000.00 | 30,000.00 | 3,000.00 | 30,000.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 55,747.25 | 55,747.25 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0054 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 133 | SQFT | 27.75 | 3,690.75 | 30.00 | 3,990.00 | 80.00 | 10,640.00 | | 0055 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 133 | SQFT | 27.75 | 3,690.75 | 30.00 | 3,990.00 | 85.00 | 11,305.00 | | 0056 | 815-03-00300 | Joint Seal (Poured) | 250 | LNFT | 44.40 | 11,100.00 | 45.00 | 11,250.00 | 45.00 | 11,250.00 | | 0057 | NS-201-00003 | Tree and Stump Removal (Over 48" Diameter) | 1 | EACH | 10,493.60 | 10,493.60 | 6,000.00 | 6,000.00 | 5,500.00 | 5,500.00 | | 0058 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 82,064 | SQYD | 7.66 | 628,610.24 | 7.00 | 574,448.00 | 12.00 | 984,768.00 | | 0059 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 250 | LNFT | 3.88 | 970.00 | 3.75 | 937.50 | 4.00 | 1,000.00 | | 0060 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 250 | LNFT | 2.77 | 692.50 | 2.75 | 687.50 | 3.00 | 750.00 | | 0061 | NS-719-00002 | Tree Trimming | 1 | LUMP | 10,493.60 | 10,493.60 | 30,000.00 | 30,000.00 | 150,000.00 | 150,000.00 | | 0062 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 40 | LNFT | 471.71 | 18,868.40 | 450.00 | 18,000.00 | 1,700.00 | 68,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,403,696.71 | | 8,596,931.88 | | 10,919,631.08 |
|