Proposal:H.015592.6
Parish:St. Mary
Routes:LA 3211
Description:LA 3211: RR CROSSING - LA 182
Type Construction:MILLING ASPHALT CONCRETE, TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,801,695.46
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $1,794,500.89 |
| 2 | 33663 | Glenn Lege Construction LLC | $1,933,446.15 |
| 3 | 06276 | Barriere Construction Co., LLC | $2,887,485.26 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | - 3 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 32 | SQYD | 125.00 | 4,000.00 | 19.68 | 629.76 | 42.00 | 1,344.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 268.4 | SQYD | 25.00 | 6,710.00 | 29.51 | 7,920.48 | 29.00 | 7,783.60 | | 0003 | 202-02-14500 | Removal of Guard Rail | 181.8 | LNFT | 17.00 | 3,090.60 | 19.68 | 3,577.82 | 15.75 | 2,863.35 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 150.00 | 15,000.00 | 97.72 | 9,772.00 | 231.00 | 23,100.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 175.00 | 1,750.00 | 196.76 | 1,967.60 | 270.00 | 2,700.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 400 | LNFT | 2.75 | 1,100.00 | 3.28 | 1,312.00 | 3.00 | 1,200.00 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 12,639 | SQYD | 13.25 | 167,466.75 | 11.32 | 143,073.48 | 12.95 | 163,675.05 | | 0008 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 12,639 | SQYD | 25.25 | 319,134.75 | 21.04 | 265,924.56 | 43.25 | 546,636.75 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 387.6 | CUYD | 75.00 | 29,070.00 | 62.31 | 24,151.36 | 160.00 | 62,016.00 | | 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 53.78 | 2,689.00 | 110.00 | 5,500.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 5,043.9 | TON | 125.00 | 630,487.50 | 149.45 | 753,810.86 | 200.00 | 1,008,780.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 257 | TON | 200.00 | 51,400.00 | 246.60 | 63,376.20 | 368.00 | 94,576.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 15,661 | SQYD | 5.50 | 86,135.50 | 5.84 | 91,460.24 | 15.00 | 234,915.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,884 | CUYD | 0.01 | -18.84 | 0.01 | -18.84 | 0.01 | -18.84 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 12.5 | LNFT | 60.00 | 750.00 | 39.35 | 491.88 | 36.00 | 450.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 5,000.00 | 20,000.00 | 4,918.88 | 19,675.52 | 4,500.00 | 18,000.00 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 268.4 | SQYD | 175.00 | 46,970.00 | 83.65 | 22,451.66 | 120.00 | 32,208.00 | | 0018 | 706-03-00800 | Incidental Concrete Paving (12" Thick) | 29.2 | SQYD | 225.00 | 6,570.00 | 131.17 | 3,830.16 | 175.00 | 5,110.00 | | 0019 | 706-04-00110 | Curb Ramps TYPE 4 | 17.9 | SQYD | 285.00 | 5,101.50 | 111.10 | 1,988.69 | 320.00 | 5,728.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 153.5 | LNFT | 75.00 | 11,512.50 | 31.48 | 4,832.18 | 90.00 | 13,815.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 43,286.10 | 43,286.10 | 245,000.00 | 245,000.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.349 | MILE | 650.00 | 1,526.85 | 692.58 | 1,626.87 | 800.00 | 1,879.20 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.209 | MILE | 1.00 | 1.21 | 1,049.36 | 1,268.68 | 750.00 | 906.75 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.916 | MILE | 1.00 | 8.92 | 1,180.53 | 10,525.61 | 1,000.00 | 8,916.00 | | 0025 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 1 | EACH | 1.00 | 1.00 | 26.23 | 26.23 | 25.00 | 25.00 | | 0026 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 1 | EACH | 1.00 | 1.00 | 26.23 | 26.23 | 25.00 | 25.00 | | 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 1.00 | 1.00 | 26.23 | 26.23 | 25.00 | 25.00 | | 0028 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 1 | EACH | 1.00 | 1.00 | 65.59 | 65.59 | 35.00 | 35.00 | | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 26,234.00 | 26,234.00 | 7,500.00 | 7,500.00 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.657 | MILE | 1,450.00 | 2,402.65 | 1,770.80 | 2,934.22 | 335.00 | 555.10 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 161,339.10 | 161,339.10 | 255,000.00 | 255,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 115.00 | 1,610.00 | 98.38 | 1,377.32 | 130.00 | 1,820.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 135.00 | 540.00 | 111.49 | 445.96 | 140.00 | 560.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 156 | EACH | 6.00 | 936.00 | 6.56 | 1,023.36 | 6.00 | 936.00 | | 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 205 | LNFT | 11.00 | 2,255.00 | 11.81 | 2,421.05 | 15.00 | 3,075.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.195 | MILE | 5,000.00 | 15,975.00 | 9,837.75 | 31,431.61 | 4,500.00 | 14,377.50 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.404 | MILE | 1,750.00 | 707.00 | 1,967.55 | 794.89 | 2,500.00 | 1,010.00 | | 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 300.00 | 300.00 | 327.93 | 327.93 | 350.00 | 350.00 | | 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 300.00 | 300.00 | 327.93 | 327.93 | 350.00 | 350.00 | | 0040 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 325.00 | 650.00 | 360.72 | 721.44 | 450.00 | 900.00 | | 0041 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 950.00 | 950.00 | 1,049.36 | 1,049.36 | 950.00 | 950.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 0.654 | ACRE | 6,000.00 | 3,924.00 | 6,558.50 | 4,289.26 | 6,100.00 | 3,989.40 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 215,774.65 | 215,774.65 | 106,000.00 | 106,000.00 | | 0044 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,216 | INLF | 5.00 | 6,080.00 | 2.62 | 3,185.92 | 2.40 | 2,918.40 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,794,500.89 | | 1,933,446.15 | | 2,887,485.26 |
|