Proposal:H.015519.6
Parish:Bossier
Description:SMITH ROAD OVER RED CHUTE BAYOU
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE GIRDER SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$4,173,830.25
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $4,439,560.10 |
| 2 | 49239 | WL Bass Construction Inc. | $4,571,955.00 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $5,168,215.40 |
| 4 | 55505 | MERRICK, LLC | $5,590,532.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - WL Bass Construction Inc. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - MERRICK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 454,000.00 | 454,000.00 | 50,000.00 | 50,000.00 | 300,000.00 | 300,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-00010 | Removal of Mailboxes and Supports | 1 | EACH | 40.00 | 40.00 | 35.00 | 35.00 | 250.00 | 250.00 | 200.00 | 200.00 | | 0003 | 202-02-00020 | Removal of Concrete Slab | 76 | SQYD | 40.00 | 3,040.00 | 12.00 | 912.00 | 20.00 | 1,520.00 | 12.00 | 912.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,667 | SQYD | 11.00 | 18,337.00 | 10.00 | 16,670.00 | 8.00 | 13,336.00 | 10.00 | 16,670.00 | | 0005 | 202-02-04501 | Removal of Bridge 26 FT. X 192 FT. Timber Bridge | 5,122 | LUMP | 35,000.00 | 35,000.00 | 125,000.00 | 125,000.00 | 300,000.00 | 300,000.00 | 600,000.00 | 600,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 674 | LNFT | 4.00 | 2,696.00 | 1.00 | 674.00 | 10.00 | 6,740.00 | 2.00 | 1,348.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 18" | 48 | LNFT | 25.00 | 1,200.00 | 30.00 | 1,440.00 | 10.00 | 480.00 | 30.00 | 1,440.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 24" | 88 | LNFT | 26.00 | 2,288.00 | 20.00 | 1,760.00 | 10.00 | 880.00 | 30.00 | 2,640.00 | | 0009 | 203-02-00100 | Drainage Excavation | 370 | CUYD | 26.00 | 9,620.00 | 30.00 | 11,100.00 | 20.00 | 7,400.00 | 20.00 | 7,400.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 135,000.00 | 135,000.00 | 142,000.00 | 142,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | | 0011 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 50.00 | 1,200.00 | 35.00 | 840.00 | 35.00 | 840.00 | 30.00 | 720.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 2,170 | LNFT | 3.90 | 8,463.00 | 3.00 | 6,510.00 | 6.00 | 13,020.00 | 3.50 | 7,595.00 | | 0013 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,936.2 | SQYD | 42.00 | 81,320.40 | 55.00 | 106,491.00 | 39.50 | 76,479.90 | 55.00 | 106,491.00 | | 0014 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 1,100.00 | 8,800.00 | 500.00 | 4,000.00 | 700.00 | 5,600.00 | 700.00 | 5,600.00 | | 0015 | 304-01-00100 | Lime | 1.42 | TON | 1,800.00 | 2,556.00 | 750.00 | 1,065.00 | 1,000.00 | 1,420.00 | 800.00 | 1,136.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) 9% by volume, 12" thick | 100 | SQYD | 150.00 | 15,000.00 | 30.00 | 3,000.00 | 60.00 | 6,000.00 | 30.00 | 3,000.00 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 66.5 | CUYD | 200.00 | 13,300.00 | 225.00 | 14,962.50 | 184.00 | 12,236.00 | 200.00 | 13,300.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 190.00 | 19,000.00 | 170.00 | 17,000.00 | 200.00 | 20,000.00 | 160.00 | 16,000.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 425.9 | TON | 250.00 | 106,475.00 | 250.00 | 106,475.00 | 195.00 | 83,050.50 | 300.00 | 127,770.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 245.6 | TON | 300.00 | 73,680.00 | 300.00 | 73,680.00 | 210.00 | 51,576.00 | 350.00 | 85,960.00 | | 0021 | 510-04-00100 | Pavement Patching | 50 | TON | 410.00 | 20,500.00 | 500.00 | 25,000.00 | 285.00 | 14,250.00 | 500.00 | 25,000.00 | | 0022 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 76 | LNFT | 100.00 | 7,600.00 | 200.00 | 15,200.00 | 174.00 | 13,224.00 | 150.00 | 11,400.00 | | 0023 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 232 | LNFT | 110.00 | 25,520.00 | 150.00 | 34,800.00 | 170.00 | 39,440.00 | 160.00 | 37,120.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 31.00 | 1,550.00 | 33.00 | 1,650.00 | 118.60 | 5,930.00 | 40.00 | 2,000.00 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 130.00 | 13,000.00 | 130.00 | 13,000.00 | 150.00 | 15,000.00 | | 0026 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,900.00 | 15,600.00 | 3,900.00 | 15,600.00 | 3,900.00 | 15,600.00 | 5,000.00 | 20,000.00 | | 0027 | 705-01-00100 | Barbed Wire Fence | 410 | LNFT | 25.00 | 10,250.00 | 15.00 | 6,150.00 | 15.00 | 6,150.00 | 18.00 | 7,380.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 20 | EACH | 600.00 | 12,000.00 | 500.00 | 10,000.00 | 600.00 | 12,000.00 | 750.00 | 15,000.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,517 | SQYD | 120.00 | 182,040.00 | 110.00 | 166,870.00 | 95.00 | 144,115.00 | 115.00 | 174,455.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 1,517 | SQYD | 2.80 | 4,247.60 | 4.00 | 6,068.00 | 3.00 | 4,551.00 | 3.00 | 4,551.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | 100,000.00 | 100,000.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 3.4 | TON | 1,000.00 | 3,400.00 | 850.00 | 2,890.00 | 850.00 | 2,890.00 | 1,100.00 | 3,740.00 | | 0033 | 717-01-00100 | Seeding | 68 | LB | 25.00 | 1,700.00 | 18.00 | 1,224.00 | 18.00 | 1,224.00 | 20.00 | 1,360.00 | | 0034 | 718-01-00100 | Fertilizer | 1,700 | LB | 1.00 | 1,700.00 | 0.65 | 1,105.00 | 0.65 | 1,105.00 | 0.80 | 1,360.00 | | 0035 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 56 | SQYD | 10.00 | 560.00 | 10.00 | 560.00 | 10.00 | 560.00 | 20.00 | 1,120.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 440,000.00 | 440,000.00 | 458,000.00 | 458,000.00 | 500,000.00 | 500,000.00 | 525,000.00 | 525,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 125.00 | 500.00 | 125.00 | 500.00 | 165.00 | 660.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 54 | EACH | 40.00 | 2,160.00 | 40.00 | 2,160.00 | 40.00 | 2,160.00 | 50.00 | 2,700.00 | | 0039 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 4,180 | LNFT | 3.00 | 12,540.00 | 3.00 | 12,540.00 | 3.00 | 12,540.00 | 4.00 | 16,720.00 | | 0040 | 735-01-00100 | Mailboxes | 1 | EACH | 500.00 | 500.00 | 35.00 | 35.00 | 35.00 | 35.00 | 50.00 | 50.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 500.00 | 500.00 | 300.00 | 300.00 | 300.00 | 300.00 | 400.00 | 400.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 48,000.00 | 48,000.00 | 100,000.00 | 100,000.00 | 155,000.00 | 155,000.00 | 65,000.00 | 65,000.00 | | 0043 | 804-01-00300 | Precast Concrete Piles (16") | 1,280 | LNFT | 180.00 | 230,400.00 | 142.00 | 181,760.00 | 400.00 | 512,000.00 | 250.00 | 320,000.00 | | 0044 | 804-01-00700 | Precast Concrete Piles (30") | 1,220 | LNFT | 420.00 | 512,400.00 | 540.00 | 658,800.00 | 800.00 | 976,000.00 | 525.00 | 640,500.00 | | 0045 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | | 0046 | 804-18-00100 | Vibration Monitoring | 24 | DAY | 750.00 | 18,000.00 | 300.00 | 7,200.00 | 762.50 | 18,300.00 | 1,000.00 | 24,000.00 | | 0047 | 805-01-00200 | Class A1 Concrete (Deck) | 227.42 | CUYD | 1,800.00 | 409,356.00 | 350.00 | 79,597.00 | 1,900.00 | 432,098.00 | 3,300.00 | 750,486.00 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 134.05 | CUYD | 2,300.00 | 308,315.00 | 350.00 | 46,917.50 | 2,700.00 | 361,935.00 | 3,400.00 | 455,770.00 | | 0049 | 805-08-01100 | Precast-Prestressed Concrete Girders (Type LG-25) | 948 | LNFT | 370.00 | 350,760.00 | 1,010.00 | 957,480.00 | 333.00 | 315,684.00 | 465.00 | 440,820.00 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,344 | SQFT | 1.50 | 5,016.00 | 3.00 | 10,032.00 | 2.00 | 6,688.00 | 3.50 | 11,704.00 | | 0051 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,344 | SQFT | 2.50 | 8,360.00 | 4.00 | 13,376.00 | 2.00 | 6,688.00 | 4.25 | 14,212.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel | 91,633 | LB | 1.70 | 155,776.10 | 3.00 | 274,899.00 | 2.00 | 183,266.00 | 1.85 | 169,521.05 | | 0053 | 807-01-00200 | Structural Metalwork (Grade 50) | 321 | LUMP | 9,000.00 | 9,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0054 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 44 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0055 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 200.00 | 16,000.00 | 255.00 | 20,400.00 | 130.00 | 10,400.00 | 400.00 | 32,000.00 | | 0056 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 480 | LNFT | 210.00 | 100,800.00 | 260.00 | 124,800.00 | 130.00 | 62,400.00 | 165.00 | 79,200.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 120.00 | 288,000.00 | 140.00 | 336,000.00 | 80.00 | 192,000.00 | 130.00 | 312,000.00 | | 0058 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 150 | SFIN | 270.00 | 40,500.00 | 300.00 | 45,000.00 | 150.00 | 22,500.00 | 140.00 | 21,000.00 | | 0059 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 60 | LNFT | 1,250.00 | 75,000.00 | 2,000.00 | 120,000.00 | 800.00 | 48,000.00 | 1,300.00 | 78,000.00 | | 0060 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 144 | LNFT | 50.00 | 7,200.00 | 10.00 | 1,440.00 | 10.00 | 1,440.00 | 15.00 | 2,160.00 | | 0061 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 240 | LNFT | 4.00 | 960.00 | 1.00 | 240.00 | 8.00 | 1,920.00 | 3.00 | 720.00 | | 0062 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 747 | INLF | 2.00 | 1,494.00 | 1.00 | 747.00 | 2.00 | 1,494.00 | 3.00 | 2,241.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,439,560.10 | | 4,571,955.00 | | 5,168,215.40 | | 5,590,532.05 |
|