Proposal:H.015438.6
Parish:Ascension
Routes:LA 928
Description:LA 928: LA 74 - LA 427
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE, LOOP DETECTORS AND RELATED WORK.
Estimated Construction Cost:$3,808,912.95
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,881,285.03 |
| 2 | 73475 | Madden Gulf Coast, LLC | $4,206,781.18 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,276,202.30 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $4,602,287.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.12 | LUMP | 5,500.00 | 5,500.00 | 8,000.00 | 8,000.00 | 18,000.00 | 18,000.00 | 12,500.00 | 12,500.00 | | 0002 | 202-02-00010 | Removal of SAFETY ENDS | 2 | EACH | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | 1,400.00 | 2,800.00 | 1,910.00 | 3,820.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall 70.17' x 10.71' | 2 | EACH | 7,500.00 | 15,000.00 | 7,500.00 | 15,000.00 | 5,800.00 | 11,600.00 | 8,800.00 | 17,600.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 3,300.00 | 3,300.00 | 1,910.00 | 1,910.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 400 | LNFT | 15.00 | 6,000.00 | 14.50 | 5,800.00 | 10.00 | 4,000.00 | 9.35 | 3,740.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CPEPDW, 30" RCP | 80 | LNFT | 45.00 | 3,600.00 | 45.00 | 3,600.00 | 18.00 | 1,440.00 | 16.50 | 1,320.00 | | 0007 | 202-03-38000 | Relocation of Sign | 7 | EACH | 50.00 | 350.00 | 25.00 | 175.00 | 200.00 | 1,400.00 | 55.00 | 385.00 | | 0008 | 202-03-38020 | Relocation of Sign Pole STA. 228+71 TO STA. 237+71 | 5 | EACH | 100.00 | 500.00 | 150.00 | 750.00 | 175.00 | 875.00 | 110.00 | 550.00 | | 0009 | 203-01-00100 | General Excavation | 85 | CUYD | 45.00 | 3,825.00 | 45.00 | 3,825.00 | 65.00 | 5,525.00 | 111.75 | 9,498.75 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,171 | CUYD | 39.00 | 84,669.00 | 56.50 | 122,661.50 | 60.00 | 130,260.00 | 77.00 | 167,167.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 1,100 | LNFT | 10.00 | 11,000.00 | 10.00 | 11,000.00 | 12.00 | 13,200.00 | 15.20 | 16,720.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 56 | EACH | 28.00 | 1,568.00 | 28.00 | 1,568.00 | 30.00 | 1,680.00 | 35.00 | 1,960.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,200 | LNFT | 1.90 | 2,280.00 | 1.90 | 2,280.00 | 2.50 | 3,000.00 | 2.40 | 2,880.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 536 | CUYD | 61.00 | 32,696.00 | 40.25 | 21,574.00 | 100.00 | 53,600.00 | 129.00 | 69,144.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 45.00 | 6,750.00 | 100.00 | 15,000.00 | 125.00 | 18,750.00 | 185.00 | 27,750.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 11,018.4 | TON | 134.00 | 1,476,465.60 | 124.00 | 1,366,281.60 | 125.00 | 1,377,300.00 | 130.00 | 1,432,392.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 399.2 | TON | 290.00 | 115,768.00 | 275.00 | 109,780.00 | 220.00 | 87,824.00 | 223.00 | 89,021.60 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 83,347 | SQYD | 1.75 | 145,857.25 | 2.25 | 187,530.75 | 3.50 | 291,714.50 | 3.14 | 261,709.58 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,473 | CUYD | 0.01 | -34.73 | 0.01 | -34.73 | 0.00 | 0.00 | 0.01 | -34.73 | | 0020 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 4,408 | SQYD | 149.00 | 656,792.00 | 110.50 | 487,084.00 | 185.00 | 815,480.00 | 192.00 | 846,336.00 | | 0021 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) 24" RPVCP | 20 | LNFT | 350.00 | 7,000.00 | 350.00 | 7,000.00 | 235.00 | 4,700.00 | 223.00 | 4,460.00 | | 0022 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) 30" RPVCP | 40 | LNFT | 350.00 | 14,000.00 | 350.00 | 14,000.00 | 280.00 | 11,200.00 | 250.00 | 10,000.00 | | 0023 | 701-05-01066 | Side Drain Pipe (24" RCP) | 200 | LNFT | 180.00 | 36,000.00 | 220.00 | 44,000.00 | 205.00 | 41,000.00 | 178.00 | 35,600.00 | | 0024 | 701-05-01085 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) CPPPDW | 20 | LNFT | 350.00 | 7,000.00 | 350.00 | 7,000.00 | 230.00 | 4,600.00 | 387.00 | 7,740.00 | | 0025 | 701-15-00100 | Concrete Collar | 6 | EACH | 2,500.00 | 15,000.00 | 2,700.00 | 16,200.00 | 1,400.00 | 8,400.00 | 1,407.00 | 8,442.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 342 | LNFT | 1.00 | 342.00 | 1.00 | 342.00 | 5.00 | 1,710.00 | 21.00 | 7,182.00 | | 0027 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 9,000.00 | 9,000.00 | 9,000.00 | 9,000.00 | 14,000.00 | 14,000.00 | 11,178.00 | 11,178.00 | | 0028 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 7,250.00 | 7,250.00 | 7,250.00 | 7,250.00 | 8,000.00 | 8,000.00 | 8,452.00 | 8,452.00 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 612.5 | LNFT | 30.00 | 18,375.00 | 30.00 | 18,375.00 | 35.00 | 21,437.50 | 33.00 | 20,212.50 | | 0030 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 35.00 | 1,750.00 | 70.00 | 3,500.00 | 80.00 | 4,000.00 | 77.00 | 3,850.00 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 117.00 | 11,700.00 | 135.00 | 13,500.00 | 129.00 | 12,900.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,000.00 | 12,000.00 | 3,650.00 | 14,600.00 | 4,200.00 | 16,800.00 | 4,015.00 | 16,060.00 | | 0033 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 30.00 | 1,620.00 | 125.00 | 6,750.00 | 60.00 | 3,240.00 | 83.00 | 4,482.00 | | 0034 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 40 | SQYD | 165.00 | 6,600.00 | 165.00 | 6,600.00 | 225.00 | 9,000.00 | 207.00 | 8,280.00 | | 0035 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 5.00 | 250.00 | 5.00 | 250.00 | 6.00 | 300.00 | 6.50 | 325.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 259,000.00 | 259,000.00 | 550,000.00 | 550,000.00 | 190,000.00 | 190,000.00 | 269,850.00 | 269,850.00 | | 0037 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 846 | LNFT | 0.25 | 211.50 | 0.50 | 423.00 | 0.25 | 211.50 | 0.55 | 465.30 | | 0038 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,526 | LNFT | 0.45 | 686.70 | 1.00 | 1,526.00 | 1.00 | 1,526.00 | 1.10 | 1,678.60 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.078 | MILE | 177.00 | 2,314.81 | 400.00 | 5,231.20 | 325.00 | 4,250.35 | 185.00 | 2,419.43 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.72 | MILE | 700.00 | 1,904.00 | 750.00 | 2,040.00 | 800.00 | 2,176.00 | 825.00 | 2,244.00 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.939 | MILE | 800.00 | 11,151.20 | 1,000.00 | 13,939.00 | 1,100.00 | 15,332.90 | 1,100.00 | 15,332.90 | | 0042 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 25.00 | 200.00 | 55.00 | 440.00 | 20.00 | 160.00 | 55.00 | 440.00 | | 0043 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 25.00 | 150.00 | 55.00 | 330.00 | 20.00 | 120.00 | 55.00 | 330.00 | | 0044 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 25.00 | 150.00 | 70.00 | 420.00 | 20.00 | 120.00 | 55.00 | 330.00 | | 0045 | 724-01-00100 | Rumble Strips (Centerline) | 4.863 | MILE | 2,500.00 | 12,157.50 | 275.00 | 1,337.33 | 350.00 | 1,702.05 | 302.00 | 1,468.63 | | 0046 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.91 | MILE | 1,200.00 | 13,092.00 | 275.00 | 3,000.25 | 350.00 | 3,818.50 | 302.50 | 3,300.28 | | 0047 | 726-01-00100 | Bedding Material | 308.5 | CUYD | 1.00 | 308.50 | 1.00 | 308.50 | 170.00 | 52,445.00 | 172.00 | 53,062.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 249,000.00 | 249,000.00 | 420,000.00 | 420,000.00 | 310,000.00 | 310,000.00 | 214,520.00 | 214,520.00 | | 0049 | 729-01-00100 | Sign (Type A) | 3 | SQFT | 25.00 | 75.00 | 35.00 | 105.00 | 40.00 | 120.00 | 11.00 | 33.00 | | 0050 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 75.00 | 900.00 | 65.00 | 780.00 | 75.00 | 900.00 | 110.00 | 1,320.00 | | 0051 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 95.00 | 1,330.00 | 85.00 | 1,190.00 | 100.00 | 1,400.00 | 93.50 | 1,309.00 | | 0052 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,300 | EACH | 4.50 | 10,350.00 | 6.00 | 13,800.00 | 6.00 | 13,800.00 | 6.60 | 15,180.00 | | 0053 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 846 | LNFT | 3.00 | 2,538.00 | 3.00 | 2,538.00 | 3.50 | 2,961.00 | 3.30 | 2,791.80 | | 0054 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,388 | LNFT | 17.00 | 23,596.00 | 12.00 | 16,656.00 | 13.00 | 18,044.00 | 13.20 | 18,321.60 | | 0055 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 138 | LNFT | 18.00 | 2,484.00 | 14.00 | 1,932.00 | 14.00 | 1,932.00 | 15.40 | 2,125.20 | | 0056 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 105 | LNFT | 5.00 | 525.00 | 3.00 | 315.00 | 3.50 | 367.50 | 3.30 | 346.50 | | 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.817 | MILE | 4,500.00 | 84,676.50 | 5,500.00 | 103,493.50 | 5,400.00 | 101,611.80 | 5,500.00 | 103,493.50 | | 0058 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.506 | MILE | 1,200.00 | 4,207.20 | 2,300.00 | 8,063.80 | 1,450.00 | 5,083.70 | 1,652.00 | 5,791.91 | | 0059 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.168 | MILE | 12,000.00 | 2,016.00 | 5,100.00 | 856.80 | 10,500.00 | 1,764.00 | 5,566.00 | 935.09 | | 0060 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 325.00 | 2,600.00 | 400.00 | 3,200.00 | 300.00 | 2,400.00 | 385.00 | 3,080.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 325.00 | 1,950.00 | 400.00 | 2,400.00 | 300.00 | 1,800.00 | 385.00 | 2,310.00 | | 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 450.00 | 2,700.00 | 500.00 | 3,000.00 | 320.00 | 1,920.00 | 385.00 | 2,310.00 | | 0063 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 650.00 | 650.00 | 500.00 | 500.00 | 350.00 | 350.00 | 385.00 | 385.00 | | 0064 | 732-05-00100 | Removal of Existing Markings | 0.064 | MILE | 10,000.00 | 640.00 | 30,000.00 | 1,920.00 | 6,500.00 | 416.00 | 20,625.00 | 1,320.00 | | 0065 | 736-01-00100 | Trenching and Backfilling | 60 | LNFT | 13.00 | 780.00 | 12.89 | 773.40 | 15.00 | 900.00 | 14.20 | 852.00 | | 0066 | 736-09-00100 | Loop Detector | 1,084 | LNFT | 31.00 | 33,604.00 | 28.92 | 31,349.28 | 33.00 | 35,772.00 | 32.00 | 34,688.00 | | 0067 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 1,401.00 | 2,802.00 | 1,282.20 | 2,564.40 | 1,500.00 | 3,000.00 | 1,410.00 | 2,820.00 | | 0068 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 60 | LNFT | 10.00 | 600.00 | 3.71 | 222.60 | 4.00 | 240.00 | 4.00 | 240.00 | | 0069 | 739-01-00100 | Hydro-Seeding | 0.07 | ACRE | 12,000.00 | 840.00 | 12,000.00 | 840.00 | 25,000.00 | 1,750.00 | 13,200.00 | 924.00 | | 0070 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 | 65,000.00 | 65,000.00 | 25,000.00 | 25,000.00 | 9,125.00 | 9,125.00 | | 0071 | 805-16-01700 | Reinforced Concrete Box Culverts (Extension) (7' x 7') | 180 | LNFT | 1,525.00 | 274,500.00 | 1,625.00 | 292,500.00 | 1,900.00 | 342,000.00 | 2,869.66 | 516,538.80 | | 0072 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall QUANTITY OF STEEL = 2928.92 LBS
QUANTITY OF CONCRETE = 40.0628 CUYDS | 2 | EACH | 55,000.00 | 110,000.00 | 55,000.00 | 110,000.00 | 52,000.00 | 104,000.00 | 71,900.00 | 143,800.00 | | 0073 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 672 | INLF | 1.00 | 672.00 | 2.00 | 1,344.00 | 1.00 | 672.00 | 1.15 | 772.80 | | 0074 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 3 | EACH | 10,050.00 | 30,150.00 | 3,000.00 | 9,000.00 | 7,500.00 | 22,500.00 | 13,500.00 | 40,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,881,285.03 | | 4,206,781.18 | | 4,276,202.30 | | 4,602,287.04 |
|