Proposal:H.015278.6-R1
Parish:Calcasieu
Routes:LA 397
Description:LA 397: US 90 - 400' N LEBLEU CEMETERY RD
Type Construction:PORTLAND CEMENT CONCRETE PAVEMENT PATCHING AND RELATED WORK.
Estimated Construction Cost:$1,788,519.07
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $2,170,931.62 |
| 2 | 30774 | Progressive Construction Co., LLC | $2,302,737.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 70,000.00 | 70,000.00 | 38,000.00 | 38,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 396 | SQYD | 5.50 | 2,178.00 | 75.00 | 29,700.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 166.9 | SQYD | 15.00 | 2,503.50 | 18.00 | 3,004.20 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 1,765 | LNFT | 12.25 | 21,621.25 | 10.00 | 17,650.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,120 | LNFT | 12.00 | 13,440.00 | 15.50 | 17,360.00 | | 0006 | 203-01-00100 | General Excavation | 37 | CUYD | 73.00 | 2,701.00 | 100.00 | 3,700.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 780 | CUYD | 150.00 | 117,000.00 | 50.00 | 39,000.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 26 | TON | 310.00 | 8,060.00 | 300.00 | 7,800.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 473 | SQYD | 31.00 | 14,663.00 | 40.00 | 18,920.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10 | CUYD | 0.01 | -0.10 | 0.01 | -0.10 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 35.5 | SQYD | 310.00 | 11,005.00 | 200.00 | 7,100.00 | | 0012 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 253.6 | SQYD | 188.00 | 47,676.80 | 230.00 | 58,328.00 | | 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,258 | LNFT | 3.00 | 39,774.00 | 4.50 | 59,661.00 | | 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 12,044 | LNFT | 3.00 | 36,132.00 | 4.50 | 54,198.00 | | 0015 | 602-03-00100 | Cleaning and Sealing Random Cracks | 1,078 | LNFT | 3.25 | 3,503.50 | 9.00 | 9,702.00 | | 0016 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 257.1 | SQYD | 305.00 | 78,415.50 | 315.00 | 80,986.50 | | 0017 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 958.7 | SQYD | 250.00 | 239,675.00 | 280.00 | 268,436.00 | | 0018 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 1,326.6 | SQYD | 240.00 | 318,384.00 | 240.00 | 318,384.00 | | 0019 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 904 | LNFT | 46.00 | 41,584.00 | 110.00 | 99,440.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 706.3 | LNFT | 36.00 | 25,426.80 | 38.00 | 26,839.40 | | 0021 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 10.8 | LNFT | 103.00 | 1,112.40 | 170.00 | 1,836.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 130.00 | 26,000.00 | 145.00 | 29,000.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 3,600.00 | 25,200.00 | 4,800.00 | 33,600.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,100.00 | 6,200.00 | 4,400.00 | 8,800.00 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 166.9 | SQYD | 120.00 | 20,028.00 | 155.00 | 25,869.50 | | 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 244 | SQYD | 102.00 | 24,888.00 | 125.00 | 30,500.00 | | 0027 | 707-01-00100 | Concrete Curb | 1,670 | LNFT | 40.00 | 66,800.00 | 40.00 | 66,800.00 | | 0028 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 52.00 | 5,616.00 | 100.00 | 10,800.00 | | 0029 | 710-01-00100 | Flowable Fill | 5 | CUYD | 315.00 | 1,575.00 | 300.00 | 1,500.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 82,000.00 | 82,000.00 | 140,000.00 | 140,000.00 | | 0031 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 486 | LNFT | 1.05 | 510.30 | 1.20 | 583.20 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 957 | LNFT | 2.05 | 1,961.85 | 2.40 | 2,296.80 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.906 | MILE | 465.00 | 1,816.29 | 1,500.00 | 5,859.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.978 | MILE | 3,600.00 | 17,920.80 | 1,700.00 | 8,462.60 | | 0035 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 3 | EACH | 155.00 | 465.00 | 60.00 | 180.00 | | 0036 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 155.00 | 310.00 | 60.00 | 120.00 | | 0037 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 3 | EACH | 155.00 | 465.00 | 60.00 | 180.00 | | 0038 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 310.00 | 1,240.00 | 120.00 | 480.00 | | 0039 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 7,800.00 | 46,800.00 | 9,500.00 | 57,000.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 210,000.00 | 210,000.00 | 240,000.00 | 240,000.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 9 | EACH | 108.00 | 972.00 | 225.00 | 2,025.00 | | 0042 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 40 | EACH | 26.00 | 1,040.00 | 18.00 | 720.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,300 | EACH | 16.00 | 20,800.00 | 11.00 | 14,300.00 | | 0044 | 732-01-03080 | Plastic Pavement Striping (24" Width) (Preformed Tape) (DOTD Intersection Grade) | 957 | LNFT | 31.00 | 29,667.00 | 38.00 | 36,366.00 | | 0045 | 732-02-03000 | Plastic Pavement Striping (Solid Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 4.978 | MILE | 7,800.00 | 38,828.40 | 4,000.00 | 19,912.00 | | 0046 | 732-02-03040 | Plastic Pavement Striping (Solid Line) (8" Width) (Preformed Tape) (Retroreflectivity Level I) | 0.057 | MILE | 38,000.00 | 2,166.00 | 47,000.00 | 2,679.00 | | 0047 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 1.309 | MILE | 3,600.00 | 4,712.40 | 12,000.00 | 15,708.00 | | 0048 | 732-03-03030 | Plastic Pavement Striping (Dotted Line) (8" Width)(3' Length)(Preformed Tape) (Retroreflectivity Level I) | 0.035 | MILE | 35,215.00 | 1,232.53 | 44,000.00 | 1,540.00 | | 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 875.00 | 2,625.00 | 600.00 | 1,800.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 875.00 | 1,750.00 | 600.00 | 1,200.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 875.00 | 2,625.00 | 600.00 | 1,800.00 | | 0052 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 1,550.00 | 6,200.00 | 1,600.00 | 6,400.00 | | 0053 | 732-05-00100 | Removal of Existing Markings | 1.295 | MILE | 51,500.00 | 66,692.50 | 18,000.00 | 23,310.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,165.00 | 7,165.00 | 50,000.00 | 50,000.00 | | 0055 | 830-07-00100 | Structural Concrete Patching | 18 | SQFT | 272.00 | 4,896.00 | 365.00 | 6,570.00 | | 0056 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 170.3 | INLF | 2.00 | 340.60 | 15.00 | 2,554.50 | | 0057 | NS-602-00001 | Milling Concrete Pavement | 1,293.8 | SQYD | 33.50 | 43,342.30 | 36.00 | 46,576.80 | | 0058 | NS-602-00011 | Expansion Joint Rehabilitation | 564 | LNFT | 525.00 | 296,100.00 | 425.00 | 239,700.00 | | 0059 | NS-702-00001 | Cleaning Existing Catch Basin | 5 | EACH | 1,025.00 | 5,125.00 | 1,500.00 | 7,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,170,931.62 | | 2,302,737.40 |
|