Proposal:H.015026.6
Parish:Iberia
Routes:LA 87
Description:LA 87: LA 3182 - 0.65 MI SE OF LA 3182
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$934,982.02
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $951,269.79 |
| 2 | 33663 | Glenn Lege Construction LLC | $1,076,888.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 10,000.00 | 10,000.00 | 11,855.75 | 11,855.75 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 8,198.13 | 8,198.13 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" - 36" (CMP, CPP - See Drainage Removal Table) | 142 | LNFT | 38.00 | 5,396.00 | 287.77 | 40,863.34 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 60" (CMP - See Drainage Removal Table) | 51 | LNFT | 52.00 | 2,652.00 | 200.32 | 10,216.32 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 12" - 18" RCP | 64 | LNFT | 20.00 | 1,280.00 | 159.62 | 10,215.68 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 17,800.00 | 17,800.00 | 14,504.38 | 14,504.38 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 223.00 | 1,784.00 | 232.07 | 1,856.56 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 5.56 | 2,780.00 | 5.80 | 2,900.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 169.1 | CUYD | 45.00 | 7,609.50 | 113.76 | 19,236.82 | | 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 105.00 | 10,500.00 | 69.37 | 6,937.00 | | 0011 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 50 | SQYD | 101.00 | 5,050.00 | 182.88 | 9,144.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 931 | TON | 192.00 | 178,752.00 | 153.55 | 142,955.05 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 23.8 | TON | 585.00 | 13,923.00 | 329.19 | 7,834.72 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 8,588 | SQYD | 3.05 | 26,193.40 | 2.67 | 22,929.96 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -358 | CUYD | 0.01 | -3.58 | 0.01 | -3.58 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 574.4 | SQYD | 196.00 | 112,582.40 | 172.92 | 99,325.25 | | 0017 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 38 | LNFT | 351.00 | 13,338.00 | 542.82 | 20,627.16 | | 0018 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 72 | LNFT | 348.00 | 25,056.00 | 587.02 | 42,265.44 | | 0019 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 50 | LNFT | 860.00 | 43,000.00 | 1,077.30 | 53,865.00 | | 0020 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 425.00 | 17,000.00 | 552.58 | 22,103.20 | | 0021 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 40 | LNFT | 142.00 | 5,680.00 | 156.88 | 6,275.20 | | 0022 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 56 | LNFT | 191.00 | 10,696.00 | 148.51 | 8,316.56 | | 0023 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 16 | LNFT | 231.00 | 3,696.00 | 230.69 | 3,691.04 | | 0024 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 8 | LNFT | 290.00 | 2,320.00 | 419.67 | 3,357.36 | | 0025 | 701-07-00500 | Yard Drain Pipe (12") | 4 | LNFT | 186.00 | 744.00 | 273.69 | 1,094.76 | | 0026 | 701-09-00100 | Pipe Fittings | 1 | EACH | 225.00 | 225.00 | 882.88 | 882.88 | | 0027 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 324 | LNFT | 12.00 | 3,888.00 | 109.10 | 35,348.40 | | 0028 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 10,280.00 | 20,560.00 | 4,414.38 | 8,828.76 | | 0029 | 702-08-00100 | Side Drain Safety End (Type 1) | 3 | EACH | 4,423.00 | 13,269.00 | 4,036.00 | 12,108.00 | | 0030 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 11,900.00 | 11,900.00 | 8,778.30 | 8,778.30 | | 0031 | 712-02-00100 | Sacked Concrete Revetment | 80 | SQYD | 338.00 | 27,040.00 | 182.88 | 14,630.40 | | 0032 | 712-04-00100 | Flexible Revetment | 48 | SQYD | 266.00 | 12,768.00 | 157.03 | 7,537.44 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 38,000.00 | 38,000.00 | 157,807.60 | 157,807.60 | | 0034 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.278 | MILE | 780.00 | 996.84 | 630.63 | 805.95 | | 0035 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.278 | MILE | 806.00 | 1,030.07 | 841.25 | 1,075.12 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.014 | MILE | 1,167.00 | 3,517.34 | 1,218.37 | 3,672.17 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.179 | MILE | 334.00 | 393.79 | 1,740.53 | 2,052.08 | | 0038 | 726-01-00100 | Bedding Material | 86.4 | CUYD | 168.00 | 14,515.20 | 63.06 | 5,448.38 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 121,000.00 | 121,000.00 | 87,606.43 | 87,606.43 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 100.00 | 800.00 | 87.03 | 696.24 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 120.00 | 480.00 | 98.63 | 394.52 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 91 | EACH | 5.56 | 505.96 | 5.80 | 527.80 | | 0043 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 75 | LNFT | 2.23 | 167.25 | 2.32 | 174.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.507 | MILE | 5,010.00 | 7,550.07 | 5,221.58 | 7,868.92 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.601 | MILE | 1,950.00 | 1,171.95 | 2,610.79 | 1,569.08 | | 0046 | 735-01-00100 | Mailboxes | 6 | EACH | 56.00 | 336.00 | 23.21 | 139.26 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 334.00 | 2,004.00 | 290.09 | 1,740.54 | | 0048 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 3,125.00 | 3,125.00 | 4,061.23 | 4,061.23 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,550.00 | 12,550.00 | 51,080.63 | 51,080.63 | | 0050 | 805-01-01000 | Class A1 Concrete (Headwalls) (72" RCP) | 40.18 | CUYD | 2,980.00 | 119,736.40 | 2,049.53 | 82,350.12 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 2,892 | LB | 3.60 | 10,411.20 | 3.16 | 9,138.72 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 951,269.79 | | 1,076,888.07 |
|