Proposal:H.014993.6
Parish:East Baton Rouge
Description:LEMON ROAD OVER DRAINAGE BAYOU
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$1,681,133.00
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,623,702.60 |
| 2 | 55950 | Brown Industrial Construction, LLC | $1,678,843.95 |
| 3 | 40312 | GRAY CONSTRUCTION CORP. | $1,716,564.05 |
| 4 | 00044 | Guinn Construction, LLC | $1,842,183.89 |
| 5 | 56994 | Matt L. Guinn Construction, LLC | $1,932,579.00 |
| 6 | 00009 | Coastal Contractors, LLC | $1,988,960.30 |
| 7 | 44187 | RNGD Infrastructure LLC | $2,199,963.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Brown Industrial Construction, LLC | - 3 - GRAY CONSTRUCTION CORP. | - 4 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.7 | LUMP | 25,000.00 | 25,000.00 | 177,000.00 | 177,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 968.8 | SQYD | 10.00 | 9,688.00 | 14.00 | 13,563.20 | 30.00 | 29,064.00 | 15.00 | 14,532.00 | | 0004 | 202-02-04501 | Removal of Bridge (STR. NO. 611730425910791)(STA 104+95.33; 24' x 38' TTTCOF) | 912 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 30,000.00 | 30,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 163.1 | LNFT | 48.00 | 7,828.80 | 15.00 | 2,446.50 | 15.00 | 2,446.50 | 10.00 | 1,631.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP, 24" CMP, 36" CMP) | 112 | LNFT | 65.00 | 7,280.00 | 20.00 | 2,240.00 | 15.00 | 1,680.00 | 25.00 | 2,800.00 | | 0007 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 3,500.00 | 7,000.00 | 1,200.00 | 2,400.00 | 2,000.00 | 4,000.00 | 1,000.00 | 2,000.00 | | 0008 | 203-02-00100 | Drainage Excavation | 482 | CUYD | 35.00 | 16,870.00 | 25.00 | 12,050.00 | 45.00 | 21,690.00 | 25.00 | 12,050.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 52,000.00 | 52,000.00 | 62,000.00 | 62,000.00 | 154,000.00 | 154,000.00 | 75,000.00 | 75,000.00 | | 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 1,700.00 | 6,800.00 | 375.00 | 1,500.00 | 2,000.00 | 8,000.00 | 1,500.00 | 6,000.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,058 | LNFT | 5.00 | 5,290.00 | 3.00 | 3,174.00 | 3.50 | 3,703.00 | 4.00 | 4,232.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 1,099.5 | SQYD | 45.00 | 49,477.50 | 40.00 | 43,980.00 | 75.00 | 82,462.50 | 60.00 | 65,970.00 | | 0013 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 2,000.00 | 8,000.00 | 450.00 | 1,800.00 | 700.00 | 2,800.00 | 2,500.00 | 10,000.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 300.00 | 4,500.00 | 220.00 | 3,300.00 | 200.00 | 3,000.00 | 250.00 | 3,750.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 25.00 | 1,250.00 | 200.00 | 10,000.00 | 118.00 | 5,900.00 | 100.00 | 5,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 207.1 | TON | 350.00 | 72,485.00 | 275.00 | 56,952.50 | 265.00 | 54,881.50 | 350.00 | 72,485.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 49.2 | TON | 500.00 | 24,600.00 | 275.00 | 13,530.00 | 265.00 | 13,038.00 | 375.00 | 18,450.00 | | 0018 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | 252 | LNFT | 150.00 | 37,800.00 | 140.00 | 35,280.00 | 155.00 | 39,060.00 | 188.00 | 47,376.00 | | 0019 | 701-05-01102 | Side Drain Pipe (36" RCP/RPVCP/CMP) | 48 | LNFT | 245.00 | 11,760.00 | 190.00 | 9,120.00 | 235.00 | 11,280.00 | 385.00 | 18,480.00 | | 0020 | 701-05-01122 | Side Drain Pipe (42" RCP/RPVCP/CMP) | 48 | LNFT | 300.00 | 14,400.00 | 260.00 | 12,480.00 | 285.00 | 13,680.00 | 540.00 | 25,920.00 | | 0021 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 192 | LNFT | 120.00 | 23,040.00 | 140.00 | 26,880.00 | 155.00 | 29,760.00 | 180.00 | 34,560.00 | | 0022 | 701-05-02102 | Side Drain Pipe (Erosion) (36" RPVCP/CMP) | 112 | LNFT | 150.00 | 16,800.00 | 190.00 | 21,280.00 | 235.00 | 26,320.00 | 400.00 | 44,800.00 | | 0023 | 701-05-02122 | Side Drain Pipe (Erosion) (42" RPVCP/CMP) | 120 | LNFT | 250.00 | 30,000.00 | 260.00 | 31,200.00 | 285.00 | 34,200.00 | 430.00 | 51,600.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 774 | LNFT | 5.00 | 3,870.00 | 8.00 | 6,192.00 | 10.00 | 7,740.00 | 10.00 | 7,740.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 6,000.00 | 24,000.00 | 6,500.00 | 26,000.00 | 4,500.00 | 18,000.00 | 4,500.00 | 18,000.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 8,000.00 | 16,000.00 | 9,500.00 | 19,000.00 | 6,500.00 | 13,000.00 | 5,500.00 | 11,000.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 35.00 | 1,312.50 | 31.00 | 1,162.50 | 30.00 | 1,125.00 | 38.00 | 1,425.00 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 145.00 | 10,875.00 | 120.00 | 9,000.00 | 95.00 | 7,125.00 | 155.00 | 11,625.00 | | 0029 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 4,000.00 | 12,000.00 | 3,400.00 | 10,200.00 | 3,500.00 | 10,500.00 | 4,300.00 | 12,900.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 60.6 | SQYD | 150.00 | 9,090.00 | 120.00 | 7,272.00 | 90.00 | 5,454.00 | 145.00 | 8,787.00 | | 0031 | 711-01-02020 | Riprap (10 lb, 12" Thick) | 40 | SQYD | 150.00 | 6,000.00 | 140.00 | 5,600.00 | 95.00 | 3,800.00 | 150.00 | 6,000.00 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 503 | SQYD | 100.00 | 50,300.00 | 110.00 | 55,330.00 | 120.00 | 60,360.00 | 150.00 | 75,450.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 543 | SQYD | 5.00 | 2,715.00 | 3.50 | 1,900.50 | 5.00 | 2,715.00 | 4.00 | 2,172.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0035 | 726-01-00100 | Bedding Material | 93.2 | CUYD | 150.00 | 13,980.00 | 140.00 | 13,048.00 | 265.00 | 24,698.00 | 150.00 | 13,980.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 175,000.00 | 175,000.00 | 167,000.00 | 167,000.00 | 171,000.00 | 171,000.00 | 175,000.00 | 175,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 135.00 | 540.00 | 85.00 | 340.00 | 250.00 | 1,000.00 | 145.00 | 580.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 7.50 | 180.00 | 4.50 | 108.00 | 6.50 | 156.00 | 8.00 | 192.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.179 | MILE | 5,500.00 | 984.50 | 24,000.00 | 4,296.00 | 5,200.00 | 930.80 | 6,000.00 | 1,074.00 | | 0040 | 735-01-00100 | Mailboxes | 4 | EACH | 50.00 | 200.00 | 275.00 | 1,100.00 | 25.00 | 100.00 | 100.00 | 400.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 350.00 | 1,400.00 | 20.00 | 80.00 | 125.00 | 500.00 | 250.00 | 1,000.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 0.48 | ACRE | 8,500.00 | 4,080.00 | 5,700.00 | 2,736.00 | 3,750.00 | 1,800.00 | 12,500.00 | 6,000.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 30,000.00 | 30,000.00 | 31,700.00 | 31,700.00 | 20,000.00 | 20,000.00 | | 0044 | 804-01-00300 | Precast Concrete Piles (16") | 1,400 | LNFT | 130.00 | 182,000.00 | 140.00 | 196,000.00 | 120.00 | 168,000.00 | 160.00 | 224,000.00 | | 0045 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 1,850.00 | 188,552.00 | 1,600.00 | 163,072.00 | 2,200.00 | 224,224.00 | 3,250.00 | 331,240.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.28 | CUYD | 4,650.00 | 126,852.00 | 4,000.00 | 109,120.00 | 3,700.00 | 100,936.00 | 3,750.00 | 102,300.00 | | 0047 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 975 | SQFT | 4.00 | 3,900.00 | 1.50 | 1,462.50 | 12.00 | 11,700.00 | 3.00 | 2,925.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 975 | SQFT | 4.00 | 3,900.00 | 2.50 | 2,437.50 | 2.50 | 2,437.50 | 3.00 | 2,925.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 27,249 | LB | 1.70 | 46,323.30 | 1.75 | 47,685.75 | 3.25 | 88,559.25 | 1.61 | 43,870.89 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 90 | LNFT | 215.00 | 19,350.00 | 275.00 | 24,750.00 | 240.00 | 21,600.00 | 325.00 | 29,250.00 | | 0051 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 225.00 | 18,000.00 | 280.00 | 22,400.00 | 240.00 | 19,200.00 | 350.00 | 28,000.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 588 | SQFT | 100.00 | 58,800.00 | 155.00 | 91,140.00 | 85.00 | 49,980.00 | 135.00 | 79,380.00 | | 0054 | 815-03-00300 | Joint Seal (Poured) | 140 | LNFT | 30.00 | 4,200.00 | 20.00 | 2,800.00 | 10.00 | 1,400.00 | 35.00 | 4,900.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 429 | INLF | 1.00 | 429.00 | 15.00 | 6,435.00 | 2.00 | 858.00 | 8.00 | 3,432.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,623,702.60 | | 1,678,843.95 | | 1,716,564.05 | | 1,842,183.89 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Matt L. Guinn Construction, LLC | - 6 - Coastal Contractors, LLC | - 7 - RNGD Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.7 | LUMP | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 968.8 | SQYD | 26.50 | 25,673.20 | 45.00 | 43,596.00 | 30.00 | 29,064.00 | | 0004 | 202-02-04501 | Removal of Bridge (STR. NO. 611730425910791)(STA 104+95.33; 24' x 38' TTTCOF) | 912 | LUMP | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 163.1 | LNFT | 15.00 | 2,446.50 | 18.00 | 2,935.80 | 50.00 | 8,155.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP, 24" CMP, 36" CMP) | 112 | LNFT | 65.00 | 7,280.00 | 30.00 | 3,360.00 | 100.00 | 11,200.00 | | 0007 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 5,500.00 | 11,000.00 | 700.00 | 1,400.00 | 5,000.00 | 10,000.00 | | 0008 | 203-02-00100 | Drainage Excavation | 482 | CUYD | 72.00 | 34,704.00 | 56.00 | 26,992.00 | 100.00 | 48,200.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 95,000.00 | 95,000.00 | 90,000.00 | 90,000.00 | 100,000.00 | 100,000.00 | | 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 3,000.00 | 12,000.00 | 1,250.00 | 5,000.00 | 2,500.00 | 10,000.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,058 | LNFT | 3.50 | 3,703.00 | 3.50 | 3,703.00 | 3.00 | 3,174.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 1,099.5 | SQYD | 60.00 | 65,970.00 | 66.00 | 72,567.00 | 75.00 | 82,462.50 | | 0013 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 2,000.00 | 8,000.00 | 1,600.00 | 6,400.00 | 800.00 | 3,200.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 250.00 | 3,750.00 | 325.00 | 4,875.00 | 82.00 | 1,230.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 250.00 | 12,500.00 | 300.00 | 15,000.00 | 125.00 | 6,250.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 207.1 | TON | 320.00 | 66,272.00 | 225.00 | 46,597.50 | 280.00 | 57,988.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 49.2 | TON | 360.00 | 17,712.00 | 225.00 | 11,070.00 | 280.00 | 13,776.00 | | 0018 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | 252 | LNFT | 128.00 | 32,256.00 | 180.00 | 45,360.00 | 131.00 | 33,012.00 | | 0019 | 701-05-01102 | Side Drain Pipe (36" RCP/RPVCP/CMP) | 48 | LNFT | 230.00 | 11,040.00 | 250.00 | 12,000.00 | 250.00 | 12,000.00 | | 0020 | 701-05-01122 | Side Drain Pipe (42" RCP/RPVCP/CMP) | 48 | LNFT | 250.00 | 12,000.00 | 320.00 | 15,360.00 | 280.00 | 13,440.00 | | 0021 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 192 | LNFT | 128.00 | 24,576.00 | 145.00 | 27,840.00 | 150.00 | 28,800.00 | | 0022 | 701-05-02102 | Side Drain Pipe (Erosion) (36" RPVCP/CMP) | 112 | LNFT | 230.00 | 25,760.00 | 215.00 | 24,080.00 | 250.00 | 28,000.00 | | 0023 | 701-05-02122 | Side Drain Pipe (Erosion) (42" RPVCP/CMP) | 120 | LNFT | 250.00 | 30,000.00 | 320.00 | 38,400.00 | 250.00 | 30,000.00 | | 0024 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 774 | LNFT | 5.00 | 3,870.00 | 6.00 | 4,644.00 | 1.00 | 774.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 7,500.00 | 30,000.00 | 8,000.00 | 32,000.00 | 4,700.00 | 18,800.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 9,000.00 | 18,000.00 | 11,000.00 | 22,000.00 | 5,600.00 | 11,200.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 45.00 | 1,687.50 | 33.00 | 1,237.50 | 42.00 | 1,575.00 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 150.00 | 11,250.00 | 130.00 | 9,750.00 | 130.00 | 9,750.00 | | 0029 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 4,850.00 | 14,550.00 | 4,000.00 | 12,000.00 | 5,000.00 | 15,000.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 60.6 | SQYD | 205.00 | 12,423.00 | 155.00 | 9,393.00 | 210.00 | 12,726.00 | | 0031 | 711-01-02020 | Riprap (10 lb, 12" Thick) | 40 | SQYD | 100.00 | 4,000.00 | 115.00 | 4,600.00 | 100.00 | 4,000.00 | | 0032 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 503 | SQYD | 130.00 | 65,390.00 | 125.00 | 62,875.00 | 150.00 | 75,450.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 543 | SQYD | 5.00 | 2,715.00 | 5.50 | 2,986.50 | 2.00 | 1,086.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 48,000.00 | 48,000.00 | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | | 0035 | 726-01-00100 | Bedding Material | 93.2 | CUYD | 150.00 | 13,980.00 | 170.00 | 15,844.00 | 180.00 | 16,776.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 190,000.00 | 190,000.00 | 220,000.00 | 220,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 350.00 | 1,400.00 | 85.00 | 340.00 | 120.00 | 480.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 40.00 | 960.00 | 6.00 | 144.00 | 9.00 | 216.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.179 | MILE | 25,000.00 | 4,475.00 | 6,000.00 | 1,074.00 | 8,000.00 | 1,432.00 | | 0040 | 735-01-00100 | Mailboxes | 4 | EACH | 250.00 | 1,000.00 | 1,000.00 | 4,000.00 | 50.00 | 200.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 50.00 | 200.00 | 80.00 | 320.00 | 336.00 | 1,344.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 0.48 | ACRE | 9,000.00 | 4,320.00 | 7,500.00 | 3,600.00 | 5,200.00 | 2,496.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | | 0044 | 804-01-00300 | Precast Concrete Piles (16") | 1,400 | LNFT | 160.00 | 224,000.00 | 165.00 | 231,000.00 | 250.00 | 350,000.00 | | 0045 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 3,050.00 | 310,856.00 | 2,850.00 | 290,472.00 | 3,200.00 | 326,144.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.28 | CUYD | 4,100.00 | 111,848.00 | 3,500.00 | 95,480.00 | 3,700.00 | 100,936.00 | | 0047 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 975 | SQFT | 1.50 | 1,462.50 | 2.50 | 2,437.50 | 9.00 | 8,775.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 975 | SQFT | 1.50 | 1,462.50 | 3.50 | 3,412.50 | 9.00 | 8,775.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 27,249 | LB | 2.20 | 59,947.80 | 2.00 | 54,498.00 | 2.25 | 61,310.25 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 90 | LNFT | 365.00 | 32,850.00 | 340.00 | 30,600.00 | 414.00 | 37,260.00 | | 0051 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 365.00 | 29,200.00 | 370.00 | 29,600.00 | 400.00 | 32,000.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 588 | SQFT | 138.00 | 81,144.00 | 175.00 | 102,900.00 | 125.00 | 73,500.00 | | 0054 | 815-03-00300 | Joint Seal (Poured) | 140 | LNFT | 20.00 | 2,800.00 | 25.00 | 3,500.00 | 48.00 | 6,720.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 429 | INLF | 5.00 | 2,145.00 | 4.00 | 1,716.00 | 3.00 | 1,287.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,932,579.00 | | 1,988,960.30 | | 2,199,963.75 |
|