Proposal:H.014793.6
Parish:St. Martin
Routes:LA 92-1
Description:LA 92-1: US 90 - LA 182
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,347,069.97
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $4,734,810.50 |
| 2 | 34356 | Prairie Contractors LLC | $5,785,825.93 |
| 3 | 51821 | Elliott Construction, LLC | $5,835,306.73 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.4 | LUMP | 6,750.00 | 6,750.00 | 60,000.00 | 60,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,450 | SQYD | 7.25 | 10,512.50 | 30.00 | 43,500.00 | 28.00 | 40,600.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 797 | SQYD | 7.25 | 5,778.25 | 30.00 | 23,910.00 | 28.00 | 22,316.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,591 | SQYD | 7.25 | 11,534.75 | 35.00 | 55,685.00 | 35.00 | 55,685.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 322.8 | LNFT | 16.26 | 5,248.73 | 16.00 | 5,164.80 | 20.00 | 6,456.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" - 36") | 114 | LNFT | 28.00 | 3,192.00 | 25.00 | 2,850.00 | 48.00 | 5,472.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (60" CMPA) | 69 | LNFT | 35.00 | 2,415.00 | 35.00 | 2,415.00 | 50.00 | 3,450.00 | | 0008 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 2,685.09 | 2,685.09 | 1,500.00 | 1,500.00 | 5,000.00 | 5,000.00 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 301 | SQYD | 18.50 | 5,568.50 | 20.00 | 6,020.00 | 40.00 | 12,040.00 | | 0010 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 87.11 | 87.11 | 85.00 | 85.00 | 55.00 | 55.00 | | 0011 | 202-02-38360 | Removal of Sign Faces | 2 | EACH | 87.11 | 174.22 | 85.00 | 170.00 | 16.50 | 33.00 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,797 | CUYD | 27.00 | 48,519.00 | 65.00 | 116,805.00 | 35.00 | 62,895.00 | | 0013 | 203-10-00100 | Cleaning Existing Ditches | 270 | LNFT | 15.50 | 4,185.00 | 60.00 | 16,200.00 | 18.00 | 4,860.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 48 | EACH | 203.26 | 9,756.48 | 215.00 | 10,320.00 | 160.00 | 7,680.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 691 | LNFT | 5.81 | 4,014.71 | 3.00 | 2,073.00 | 2.75 | 1,900.25 | | 0016 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 46,979 | SQYD | 11.00 | 516,769.00 | 13.25 | 622,471.75 | 16.00 | 751,664.00 | | 0017 | 303-02-00100 | Removal of Existing Patches | 500 | SQYD | 1.00 | 500.00 | 12.25 | 6,125.00 | 20.00 | 10,000.00 | | 0018 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 46,553 | SQYD | 11.80 | 549,325.40 | 12.00 | 558,636.00 | 18.00 | 837,954.00 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,354 | CUYD | 73.50 | 173,019.00 | 120.00 | 282,480.00 | 60.00 | 141,240.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 100.00 | 50,000.00 | 130.00 | 65,000.00 | 150.00 | 75,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 14,879.7 | TON | 137.00 | 2,038,518.90 | 126.00 | 1,874,842.20 | 140.00 | 2,083,158.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,389.6 | TON | 153.50 | 213,303.60 | 177.00 | 245,959.20 | 180.00 | 250,128.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 38,389 | SQYD | 1.81 | 69,484.09 | 4.85 | 186,186.65 | 3.50 | 134,361.50 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,378 | CUYD | 0.10 | -237.80 | 0.01 | -23.78 | 0.01 | -23.78 | | 0025 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 78 | SQYD | 191.00 | 14,898.00 | 192.00 | 14,976.00 | 285.00 | 22,230.00 | | 0026 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 48 | LNFT | 178.00 | 8,544.00 | 300.00 | 14,400.00 | 295.00 | 14,160.00 | | 0027 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 144 | LNFT | 136.00 | 19,584.00 | 200.00 | 28,800.00 | 160.00 | 23,040.00 | | 0028 | 701-05-02181 | Side Drain Pipe (Erosion) (60" CPPPDW/CPPPTW/CMP) | 72 | LNFT | 379.00 | 27,288.00 | 500.00 | 36,000.00 | 400.00 | 28,800.00 | | 0029 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 12 | LNFT | 144.00 | 1,728.00 | 300.00 | 3,600.00 | 625.00 | 7,500.00 | | 0030 | 701-15-00100 | Concrete Collar | 3 | EACH | 300.00 | 900.00 | 1,500.00 | 4,500.00 | 2,850.00 | 8,550.00 | | 0031 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 264 | LNFT | 30.00 | 7,920.00 | 20.00 | 5,280.00 | 25.00 | 6,600.00 | | 0032 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,050.00 | 4,050.00 | 10,000.00 | 10,000.00 | 10,750.00 | 10,750.00 | | 0033 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,135.00 | 4,135.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | | 0034 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 214 | LNFT | 191.65 | 41,013.10 | 185.00 | 39,590.00 | 135.00 | 28,890.00 | | 0035 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 37.17 | 3,021.92 | 35.00 | 2,845.50 | 35.00 | 2,845.50 | | 0036 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,297.55 | 17,190.20 | 4,000.00 | 16,000.00 | 3,850.00 | 15,400.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 56 | SQYD | 90.00 | 5,040.00 | 150.00 | 8,400.00 | 175.00 | 9,800.00 | | 0038 | 706-02-00400 | Concrete Drive (10" Thick) | 1,198 | SQYD | 129.50 | 155,141.00 | 175.00 | 209,650.00 | 155.00 | 185,690.00 | | 0039 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 87.3 | SQYD | 98.00 | 8,555.40 | 225.00 | 19,642.50 | 175.00 | 15,277.50 | | 0040 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 371 | SQYD | 112.00 | 41,552.00 | 200.00 | 74,200.00 | 145.00 | 53,795.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 371 | SQYD | 2.00 | 742.00 | 4.00 | 1,484.00 | 7.00 | 2,597.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 190,200.00 | 190,200.00 | 130,000.00 | 130,000.00 | 150,000.00 | 150,000.00 | | 0043 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,095 | LNFT | 0.59 | 646.05 | 0.01 | 10.95 | 1.00 | 1,095.00 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 441 | LNFT | 1.16 | 511.56 | 0.01 | 4.41 | 1.50 | 661.50 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.205 | MILE | 625.00 | 5,753.13 | 650.00 | 5,983.25 | 900.00 | 8,284.50 | | 0046 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.524 | MILE | 754.98 | 5,680.47 | 800.00 | 6,019.20 | 715.00 | 5,379.66 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.57 | MILE | 1,103.43 | 27,111.28 | 900.00 | 22,113.00 | 1,050.00 | 25,798.50 | | 0048 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 23.23 | 139.38 | 1.00 | 6.00 | 25.00 | 150.00 | | 0049 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 58.08 | 348.48 | 1.00 | 6.00 | 25.00 | 150.00 | | 0050 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 58.08 | 348.48 | 1.00 | 6.00 | 55.00 | 330.00 | | 0051 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 9,600.00 | 19,200.00 | 15,000.00 | 30,000.00 | 6,500.00 | 13,000.00 | | 0052 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 29,000.00 | 29,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.133 | MILE | 1,161.50 | 7,123.48 | 1,100.00 | 6,746.30 | 1,100.00 | 6,746.30 | | 0054 | 726-01-00100 | Bedding Material | 41.2 | CUYD | 88.00 | 3,625.60 | 175.00 | 7,210.00 | 150.00 | 6,180.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 238,309.50 | 238,309.50 | 700,000.00 | 700,000.00 | 500,000.00 | 500,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 9 | SQFT | 46.46 | 418.14 | 50.00 | 450.00 | 40.00 | 360.00 | | 0057 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 127.77 | 2,810.94 | 100.00 | 2,200.00 | 85.00 | 1,870.00 | | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 145.19 | 1,161.52 | 140.00 | 1,120.00 | 100.00 | 800.00 | | 0059 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 232.30 | 232.30 | 225.00 | 225.00 | 275.00 | 275.00 | | 0060 | 731-02-00100 | Reflectorized Raised Pavement Markers | 584 | EACH | 5.81 | 3,393.04 | 6.00 | 3,504.00 | 6.00 | 3,504.00 | | 0061 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 365 | LNFT | 4.07 | 1,485.55 | 4.00 | 1,460.00 | 4.00 | 1,460.00 | | 0062 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 147 | LNFT | 13.94 | 2,049.18 | 20.00 | 2,940.00 | 13.00 | 1,911.00 | | 0063 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.19 | MILE | 5,226.75 | 42,807.08 | 5,000.00 | 40,950.00 | 4,950.00 | 40,540.50 | | 0064 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.508 | MILE | 1,161.50 | 2,913.04 | 1,250.00 | 3,135.00 | 1,100.00 | 2,758.80 | | 0065 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 290.38 | 580.76 | 350.00 | 700.00 | 275.00 | 550.00 | | 0066 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 319.41 | 638.82 | 450.00 | 900.00 | 305.00 | 610.00 | | 0067 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 929.20 | 1,858.40 | 1,000.00 | 2,000.00 | 880.00 | 1,760.00 | | 0068 | 735-01-00100 | Mailboxes | 33 | EACH | 40.65 | 1,341.45 | 10.00 | 330.00 | 25.00 | 825.00 | | 0069 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 348.45 | 11,498.85 | 275.00 | 9,075.00 | 275.00 | 9,075.00 | | 0070 | 739-01-00100 | Hydro-Seeding | 1.116 | ACRE | 3,774.88 | 4,212.77 | 4,000.00 | 4,464.00 | 3,000.00 | 3,348.00 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,500.00 | 10,500.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0072 | 805-01-01000 | Class A1 Concrete (Headwalls) (24" RCP) | 3.8 | CUYD | 3,000.00 | 11,400.00 | 4,500.00 | 17,100.00 | 7,250.00 | 27,550.00 | | 0073 | 806-01-00100 | Deformed Reinforcing Steel | 211 | LB | 2.50 | 527.50 | 15.00 | 3,165.00 | 15.00 | 3,165.00 | | 0074 | 815-03-00300 | Joint Seal (Poured) | 520 | LNFT | 6.57 | 3,416.40 | 45.00 | 23,400.00 | 11.00 | 5,720.00 | | 0075 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 400 | LNFT | 19.70 | 7,880.00 | 3.25 | 1,300.00 | 3.00 | 1,200.00 | | 0076 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 120 | LNFT | 13.13 | 1,575.60 | 3.25 | 390.00 | 3.00 | 360.00 | | 0077 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 520 | LNFT | 3.28 | 1,705.60 | 2.25 | 1,170.00 | 2.00 | 1,040.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,734,810.50 | | 5,785,825.93 | | 5,835,306.73 |
|