Proposal:H.013269.6
Parish:Lafourche
Description:AUDUBON AVE OVLY: LA 1 TO TERREBONNE P/L
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,568,846.90
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $1,555,595.65 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,631,366.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 121.1 | SQYD | 10.00 | 1,211.00 | 20.00 | 2,422.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 53 | SQYD | 90.00 | 4,770.00 | 90.00 | 4,770.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 32 | LNFT | 6.50 | 208.00 | 10.00 | 320.00 | | 0004 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 143 | CUYD | 105.00 | 15,015.00 | 60.00 | 8,580.00 | | 0006 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 110.00 | 5,500.00 | 110.00 | 5,500.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 3,055.1 | TON | 165.00 | 504,091.50 | 185.00 | 565,193.50 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 112.3 | TON | 350.00 | 39,305.00 | 340.00 | 38,182.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 22,883 | SQYD | 4.50 | 102,973.50 | 5.50 | 125,856.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,495 | CUYD | 0.01 | -14.95 | 0.01 | -14.95 | | 0011 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 1,492 | SQYD | 90.00 | 134,280.00 | 106.06 | 158,241.52 | | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 876 | LNFT | 4.00 | 3,504.00 | 4.00 | 3,504.00 | | 0013 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 18.4 | SQYD | 350.00 | 6,440.00 | 350.00 | 6,440.00 | | 0014 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 114.1 | SQYD | 265.00 | 30,236.50 | 300.00 | 34,230.00 | | 0015 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 150.5 | SQYD | 240.00 | 36,120.00 | 300.00 | 45,150.00 | | 0016 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 4 | EACH | 335.00 | 1,340.00 | 250.00 | 1,000.00 | | 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 96 | SQYD | 110.00 | 10,560.00 | 120.00 | 11,520.00 | | 0018 | 706-04-00110 | Curb Ramps Type 3 | 8.1 | SQYD | 295.00 | 2,389.50 | 300.00 | 2,430.00 | | 0019 | 706-04-00110 | Curb Ramps Type 7 | 66.5 | SQYD | 220.00 | 14,630.00 | 250.00 | 16,625.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 30 | LNFT | 45.00 | 1,350.00 | 60.00 | 1,800.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 105,000.00 | 105,000.00 | 150,000.00 | 150,000.00 | | 0022 | 717-01-00100 | Seeding | 8 | LB | 20.00 | 160.00 | 25.00 | 200.00 | | 0023 | 718-01-00100 | Fertilizer | 265 | LB | 5.00 | 1,325.00 | 7.00 | 1,855.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 155,500.00 | 155,500.00 | 120,000.00 | 120,000.00 | | 0025 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 46.6 | SQFT | 42.00 | 1,957.20 | 40.00 | 1,864.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 264 | EACH | 12.00 | 3,168.00 | 10.00 | 2,640.00 | | 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 618 | LNFT | 14.00 | 8,652.00 | 13.00 | 8,034.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.26 | MILE | 5,850.00 | 24,921.00 | 5,900.00 | 25,134.00 | | 0029 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.045 | MILE | 10,500.00 | 472.50 | 11,000.00 | 495.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.755 | MILE | 1,750.00 | 1,321.25 | 1,600.00 | 1,208.00 | | 0031 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.034 | MILE | 5,350.00 | 181.90 | 5,000.00 | 170.00 | | 0032 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 450.00 | 900.00 | 360.00 | 720.00 | | 0033 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 600.00 | 2,400.00 | 450.00 | 1,800.00 | | 0034 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 450.00 | 1,800.00 | 410.00 | 1,640.00 | | 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 450.00 | 900.00 | 360.00 | 720.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 12,000.00 | 1,200.00 | 10,000.00 | 1,000.00 | | 0037 | 736-01-00100 | Trenching and Backfilling | 50 | LNFT | 15.00 | 750.00 | 14.00 | 700.00 | | 0038 | 736-09-00100 | Loop Detector | 500 | LNFT | 40.00 | 20,000.00 | 35.00 | 17,500.00 | | 0039 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 1,500.00 | 3,000.00 | 1,400.00 | 2,800.00 | | 0040 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 5 | LNFT | 4.50 | 22.50 | 3.75 | 18.75 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,625.00 | 35,625.00 | 30,000.00 | 30,000.00 | | 0042 | 815-03-00300 | Joint Seal (Poured) | 721 | LNFT | 4.25 | 3,064.25 | 7.00 | 5,047.00 | | 0043 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 124 | INLF | 2.00 | 248.00 | 2.50 | 310.00 | | 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 198 | INLF | 3.00 | 594.00 | 2.50 | 495.00 | | 0045 | NS-719-00002 | Tree Trimming | 1 | LUMP | 35,000.00 | 35,000.00 | 12,000.00 | 12,000.00 | | 0046 | TS-502-00120 | Reinforced Paving Mat for Asphalt Overlay | 20,090 | SQYD | 7.00 | 140,630.00 | 5.90 | 118,531.00 | | 0047 | TS-504-00100 | Asphalt Tack Coat | 3,664 | GAL | 14.25 | 52,212.00 | 14.00 | 51,296.00 | | 0048 | TS-700-05000 | Decorative Sign/Post | 5 | EACH | 3,850.00 | 19,250.00 | 3,500.00 | 17,500.00 | | 0049 | TS-MSC-01040 | Adjusting Utility Boxes | 2 | EACH | 450.00 | 900.00 | 4,600.00 | 9,200.00 | | 0050 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 417 | LNFT | 0.50 | 208.50 | 0.50 | 208.50 | | 0051 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,236 | LNFT | 0.75 | 927.00 | 0.75 | 927.00 | | 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.51 | MILE | 750.00 | 1,132.50 | 800.00 | 1,208.00 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.52 | MILE | 1,000.00 | 8,520.00 | 1,100.00 | 9,372.00 | | 0054 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 50.00 | 200.00 | 60.00 | 240.00 | | 0055 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 8 | EACH | 50.00 | 400.00 | 60.00 | 480.00 | | 0056 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 50.00 | 400.00 | 60.00 | 480.00 | | 0057 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 50.00 | 200.00 | 60.00 | 240.00 | | 0058 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 528 | EACH | 10.50 | 5,544.00 | 3.00 | 1,584.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,555,595.65 | | 1,631,366.82 |
|