Proposal:H.012058.6
Parish:Vernon
Routes:LA 8
Description:LA 8: FORKER CREEK BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE DECK GIRDER BRIDGE, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, TEMPORARY DETOUR ROAD AND BRIDGE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$7,751,439.80
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $6,282,263.55 |
| 2 | 55950 | Brown Industrial Construction, LLC | $6,962,834.69 |
| 3 | 49239 | WL Bass Construction Inc. | $6,986,072.10 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $7,937,904.74 |
| 5 | 27239 | Apeck Construction, LLC | $8,393,757.55 |
| 6 | 55505 | MERRICK, LLC | $9,953,390.55 |
| 7 | 00044 | Guinn Construction, LLC | $10,888,229.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 2 - Brown Industrial Construction, LLC | - 3 - WL Bass Construction Inc. | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (4.5 acres) | 4.5 | LUMP | 200,000.00 | 200,000.00 | 500,000.00 | 500,000.00 | 50,000.00 | 50,000.00 | 95,000.00 | 95,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 3,595.6 | SQYD | 8.00 | 28,764.80 | 4.50 | 16,180.20 | 5.00 | 17,978.00 | 8.50 | 30,562.60 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 135+18 TO 136+86 29.26 FT X 168 FT CONCRETE DECK GIRDER BRIDGE) | 4,916 | LUMP | 200,000.00 | 200,000.00 | 190,000.00 | 190,000.00 | 100,000.00 | 100,000.00 | 265,000.00 | 265,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 652.4 | LNFT | 8.00 | 5,219.20 | 8.00 | 5,219.20 | 7.00 | 4,566.80 | 25.00 | 16,310.00 | | 0006 | 203-02-00100 | Drainage Excavation | 2,385 | CUYD | 17.00 | 40,545.00 | 16.00 | 38,160.00 | 25.00 | 59,625.00 | 10.00 | 23,850.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 300,000.00 | 300,000.00 | 180,000.00 | 180,000.00 | 370,000.00 | 370,000.00 | 235,000.00 | 235,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 52 | EACH | 170.00 | 8,840.00 | 120.00 | 6,240.00 | 120.00 | 6,240.00 | 150.00 | 7,800.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,583 | LNFT | 2.00 | 3,166.00 | 3.10 | 4,907.30 | 4.00 | 6,332.00 | 4.00 | 6,332.00 | | 0010 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 6,696.4 | SQYD | 25.00 | 167,410.00 | 20.00 | 133,928.00 | 35.00 | 234,374.00 | 20.00 | 133,928.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 23.7 | CUYD | 67.00 | 1,587.90 | 220.00 | 5,214.00 | 160.00 | 3,792.00 | 400.00 | 9,480.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 76.00 | 19,000.00 | 200.00 | 50,000.00 | 160.00 | 40,000.00 | 22.00 | 5,500.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 1,442.5 | TON | 200.00 | 288,500.00 | 200.00 | 288,500.00 | 190.00 | 274,075.00 | 190.00 | 274,075.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 182.6 | TON | 200.00 | 36,520.00 | 235.00 | 42,911.00 | 190.00 | 34,694.00 | 241.00 | 44,006.60 | | 0015 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 112 | SQYD | 165.00 | 18,480.00 | 175.00 | 19,600.00 | 600.00 | 67,200.00 | 180.00 | 20,160.00 | | 0016 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 48 | LNFT | 240.00 | 11,520.00 | 130.00 | 6,240.00 | 150.00 | 7,200.00 | 200.00 | 9,600.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 31.00 | 3,100.00 | 30.00 | 3,000.00 | 33.00 | 3,300.00 | 36.00 | 3,600.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 121.00 | 12,100.00 | 120.00 | 12,000.00 | 125.00 | 12,500.00 | 145.00 | 14,500.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,400.00 | 13,600.00 | 3,300.00 | 13,200.00 | 3,600.00 | 14,400.00 | 4,000.00 | 16,000.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,213 | SQYD | 84.00 | 185,892.00 | 80.00 | 177,040.00 | 80.00 | 177,040.00 | 120.00 | 265,560.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 2,213 | SQYD | 3.50 | 7,745.50 | 2.80 | 6,196.40 | 4.00 | 8,852.00 | 4.00 | 8,852.00 | | 0022 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 756 | SQYD | 90.00 | 68,040.00 | 120.00 | 90,720.00 | 110.00 | 83,160.00 | 90.00 | 68,040.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 137,000.00 | 137,000.00 | 90,000.00 | 90,000.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.669 | MILE | 800.00 | 535.20 | 810.00 | 541.89 | 10,000.00 | 6,690.00 | 165.00 | 110.39 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.593 | MILE | 800.00 | 474.40 | 800.00 | 474.40 | 10,000.00 | 5,930.00 | 800.00 | 474.40 | | 0026 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.038 | MILE | 5,200.00 | 197.60 | 7,000.00 | 266.00 | 10,000.00 | 380.00 | 6,000.00 | 228.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.271 | MILE | 1,000.00 | 3,271.00 | 1,000.00 | 3,271.00 | 2,500.00 | 8,177.50 | 1,100.00 | 3,598.10 | | 0028 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.076 | MILE | 6,500.00 | 494.00 | 7,400.00 | 562.40 | 2,500.00 | 190.00 | 7,500.00 | 570.00 | | 0029 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 89 | EACH | 5.00 | 445.00 | 5.00 | 445.00 | 25.00 | 2,225.00 | 6.00 | 534.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 10 | TON | 900.00 | 9,000.00 | 850.00 | 8,500.00 | 850.00 | 8,500.00 | 1,000.00 | 10,000.00 | | 0031 | 717-01-00100 | Seeding | 400 | LB | 16.00 | 6,400.00 | 14.00 | 5,600.00 | 14.00 | 5,600.00 | 15.00 | 6,000.00 | | 0032 | 718-01-00100 | Fertilizer | 5,000 | LB | 0.70 | 3,500.00 | 65.00 | 325,000.00 | 1.00 | 5,000.00 | 0.75 | 3,750.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,946 | SQYD | 2.25 | 4,378.50 | 2.00 | 3,892.00 | 2.00 | 3,892.00 | 2.25 | 4,378.50 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | | 0035 | 724-01-00100 | Rumble Strips (Centerline) | 0.296 | MILE | 1,000.00 | 296.00 | 1,100.00 | 325.60 | 1,000.00 | 296.00 | 1,100.00 | 325.60 | | 0036 | 725-01-00100 | Temporary Detour Roads | 3,957.8 | SQYD | 210.00 | 831,138.00 | 140.00 | 554,092.00 | 80.00 | 316,624.00 | 125.00 | 494,725.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 550,000.00 | 550,000.00 | 378,000.00 | 378,000.00 | 698,000.00 | 698,000.00 | 705,000.00 | 705,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 75.00 | 300.00 | 125.00 | 500.00 | 135.00 | 540.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 45 | EACH | 6.00 | 270.00 | 5.00 | 225.00 | 25.00 | 1,125.00 | 6.00 | 270.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.002 | MILE | 4,500.00 | 4,509.00 | 4,500.00 | 4,509.00 | 15,000.00 | 15,030.00 | 5,000.00 | 5,010.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.334 | MILE | 1,800.00 | 601.20 | 1,800.00 | 601.20 | 10,000.00 | 3,340.00 | 2,000.00 | 668.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.22 | MILE | 6,500.00 | 1,430.00 | 6,500.00 | 1,430.00 | 25,000.00 | 5,500.00 | 7,500.00 | 1,650.00 | | 0043 | 735-01-00100 | Mailboxes | 1 | EACH | 46.00 | 46.00 | 250.00 | 250.00 | 1.00 | 1.00 | 10.00 | 10.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 52,000.00 | 52,000.00 | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | | 0045 | 804-01-00600 | Precast Concrete Piles (24") | 3,060 | LNFT | 210.00 | 642,600.00 | 220.00 | 673,200.00 | 318.00 | 973,080.00 | 360.00 | 1,101,600.00 | | 0046 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 1 | EACH | 100,000.00 | 100,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | | 0047 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 7,000.00 | 49,000.00 | 4,500.00 | 31,500.00 | 1,500.00 | 10,500.00 | 7,000.00 | 49,000.00 | | 0048 | 805-01-00100 | Class A1 Concrete (Slab Span) | 502.88 | CUYD | 1,000.00 | 502,880.00 | 990.00 | 497,851.20 | 350.00 | 176,008.00 | 1,400.00 | 704,032.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 122.12 | CUYD | 1,700.00 | 207,604.00 | 1,950.00 | 238,134.00 | 350.00 | 42,742.00 | 3,100.00 | 378,572.00 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,727 | SQFT | 2.25 | 6,135.75 | 1.50 | 4,090.50 | 3.00 | 8,181.00 | 4.00 | 10,908.00 | | 0051 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,727 | SQFT | 3.25 | 8,862.75 | 2.50 | 6,817.50 | 4.00 | 10,908.00 | 5.00 | 13,635.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel | 129,047 | LB | 1.25 | 161,308.75 | 1.70 | 219,379.90 | 3.40 | 438,759.80 | 1.65 | 212,927.55 | | 0053 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 183.00 | 73,200.00 | 240.00 | 96,000.00 | 200.00 | 80,000.00 | 240.00 | 96,000.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,520 | SQFT | 90.00 | 316,800.00 | 140.00 | 492,800.00 | 92.00 | 323,840.00 | 135.00 | 475,200.00 | | 0055 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 272 | SFIN | 100.00 | 27,200.00 | 150.00 | 40,800.00 | 144.00 | 39,168.00 | 130.00 | 35,360.00 | | 0056 | 815-03-00300 | Joint Seal (Poured) | 396 | LNFT | 40.00 | 15,840.00 | 16.00 | 6,336.00 | 17.00 | 6,732.00 | 8.00 | 3,168.00 | | 0057 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 5,600 | SQFT | 156.00 | 873,600.00 | 220.00 | 1,232,000.00 | 326.00 | 1,825,600.00 | 300.00 | 1,680,000.00 | | 0058 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 264 | LNFT | 16.00 | 4,224.00 | 30.00 | 7,920.00 | 13.00 | 3,432.00 | 12.00 | 3,168.00 | | 0059 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 440 | LNFT | 10.00 | 4,400.00 | 4.00 | 1,760.00 | 1.00 | 440.00 | 12.00 | 5,280.00 | | 0060 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 352 | INLF | 11.00 | 3,872.00 | 2.00 | 704.00 | 1.00 | 352.00 | 3.00 | 1,056.00 | | 0061 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 4 | EACH | 5,600.00 | 22,400.00 | 8,000.00 | 32,000.00 | 7,500.00 | 30,000.00 | 11,000.00 | 44,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,282,263.55 | | 6,962,834.69 | | 6,986,072.10 | | 7,937,904.74 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Apeck Construction, LLC | - 6 - MERRICK, LLC | - 7 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (4.5 acres) | 4.5 | LUMP | 612,223.61 | 612,223.61 | 250,000.00 | 250,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,181.05 | 8,181.05 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 3,595.6 | SQYD | 9.22 | 33,151.43 | 8.00 | 28,764.80 | 5.00 | 17,978.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 135+18 TO 136+86 29.26 FT X 168 FT CONCRETE DECK GIRDER BRIDGE) | 4,916 | LUMP | 299,847.93 | 299,847.93 | 600,000.00 | 600,000.00 | 150,000.00 | 150,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 652.4 | LNFT | 13.37 | 8,722.59 | 17.00 | 11,090.80 | 15.00 | 9,786.00 | | 0006 | 203-02-00100 | Drainage Excavation | 2,385 | CUYD | 17.56 | 41,880.60 | 25.00 | 59,625.00 | 25.00 | 59,625.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 63,387.07 | 63,387.07 | 325,000.00 | 325,000.00 | 405,000.00 | 405,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 52 | EACH | 145.53 | 7,567.56 | 160.00 | 8,320.00 | 250.00 | 13,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,583 | LNFT | 3.75 | 5,936.25 | 3.00 | 4,749.00 | 4.00 | 6,332.00 | | 0010 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 6,696.4 | SQYD | 26.67 | 178,592.99 | 22.00 | 147,320.80 | 42.00 | 281,248.80 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 23.7 | CUYD | 166.14 | 3,937.52 | 250.00 | 5,925.00 | 250.00 | 5,925.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 166.14 | 41,535.00 | 100.00 | 25,000.00 | 100.00 | 25,000.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 1,442.5 | TON | 202.54 | 292,163.95 | 250.00 | 360,625.00 | 225.00 | 324,562.50 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 182.6 | TON | 211.66 | 38,649.12 | 300.00 | 54,780.00 | 275.00 | 50,215.00 | | 0015 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 112 | SQYD | 231.08 | 25,880.96 | 225.00 | 25,200.00 | 250.00 | 28,000.00 | | 0016 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 48 | LNFT | 210.39 | 10,098.72 | 230.00 | 11,040.00 | 155.00 | 7,440.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 40.02 | 4,002.00 | 40.00 | 4,000.00 | 38.00 | 3,800.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 151.59 | 15,159.00 | 150.00 | 15,000.00 | 145.00 | 14,500.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,365.92 | 17,463.68 | 5,000.00 | 20,000.00 | 4,200.00 | 16,800.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,213 | SQYD | 97.02 | 214,705.26 | 100.00 | 221,300.00 | 135.00 | 298,755.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 2,213 | SQYD | 3.80 | 8,409.40 | 5.00 | 11,065.00 | 4.00 | 8,852.00 | | 0022 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 756 | SQYD | 133.40 | 100,850.40 | 160.00 | 120,960.00 | 125.00 | 94,500.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,020.88 | 40,020.88 | 200,000.00 | 200,000.00 | 48,500.00 | 48,500.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.669 | MILE | 971.66 | 650.04 | 3,500.00 | 2,341.50 | 1,500.00 | 1,003.50 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.593 | MILE | 965.30 | 572.42 | 1,100.00 | 652.30 | 950.00 | 563.35 | | 0026 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.038 | MILE | 8,297.89 | 315.32 | 6,500.00 | 247.00 | 7,500.00 | 285.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.271 | MILE | 1,212.38 | 3,965.69 | 1,200.00 | 3,925.20 | 1,200.00 | 3,925.20 | | 0028 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.076 | MILE | 8,936.05 | 679.14 | 8,000.00 | 608.00 | 8,100.00 | 615.60 | | 0029 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 89 | EACH | 6.06 | 539.34 | 7.00 | 623.00 | 6.00 | 534.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 10 | TON | 1,030.84 | 10,308.40 | 1,100.00 | 11,000.00 | 1,500.00 | 15,000.00 | | 0031 | 717-01-00100 | Seeding | 400 | LB | 16.98 | 6,792.00 | 20.00 | 8,000.00 | 25.00 | 10,000.00 | | 0032 | 718-01-00100 | Fertilizer | 5,000 | LB | 0.79 | 3,950.00 | 0.80 | 4,000.00 | 1.00 | 5,000.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,946 | SQYD | 2.43 | 4,728.78 | 2.50 | 4,865.00 | 4.00 | 7,784.00 | | 0034 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 82,467.26 | 82,467.26 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0035 | 724-01-00100 | Rumble Strips (Centerline) | 0.296 | MILE | 1,229.16 | 363.83 | 1,500.00 | 444.00 | 20,000.00 | 5,920.00 | | 0036 | 725-01-00100 | Temporary Detour Roads | 3,957.8 | SQYD | 215.10 | 851,322.78 | 210.00 | 831,138.00 | 345.00 | 1,365,441.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 132,599.48 | 132,599.48 | 980,000.00 | 980,000.00 | 1,000,000.00 | 1,000,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 151.60 | 606.40 | 200.00 | 800.00 | 145.00 | 580.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 45 | EACH | 6.06 | 272.70 | 7.00 | 315.00 | 6.00 | 270.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.002 | MILE | 3,025.83 | 3,031.88 | 6,000.00 | 6,012.00 | 5,200.00 | 5,210.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.334 | MILE | 2,156.83 | 720.38 | 2,100.00 | 701.40 | 2,070.00 | 691.38 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.22 | MILE | 7,882.91 | 1,734.24 | 9,000.00 | 1,980.00 | 7,500.00 | 1,650.00 | | 0043 | 735-01-00100 | Mailboxes | 1 | EACH | 1.21 | 1.21 | 100.00 | 100.00 | 500.00 | 500.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 69,384.15 | 69,384.15 | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | | 0045 | 804-01-00600 | Precast Concrete Piles (24") | 3,060 | LNFT | 302.04 | 924,242.40 | 295.00 | 902,700.00 | 305.00 | 933,300.00 | | 0046 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 1 | EACH | 67,677.09 | 67,677.09 | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 | | 0047 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 606.38 | 4,244.66 | 2,000.00 | 14,000.00 | 1,500.00 | 10,500.00 | | 0048 | 805-01-00100 | Class A1 Concrete (Slab Span) | 502.88 | CUYD | 1,426.42 | 717,318.09 | 1,600.00 | 804,608.00 | 3,000.00 | 1,508,640.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 122.12 | CUYD | 2,676.37 | 326,838.30 | 2,500.00 | 305,300.00 | 3,500.00 | 427,420.00 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,727 | SQFT | 4.38 | 11,944.26 | 3.00 | 8,181.00 | 3.00 | 8,181.00 | | 0051 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,727 | SQFT | 4.38 | 11,944.26 | 4.00 | 10,908.00 | 3.00 | 8,181.00 | | 0052 | 806-01-00100 | Deformed Reinforcing Steel | 129,047 | LB | 1.40 | 180,665.80 | 2.25 | 290,355.75 | 1.60 | 206,475.20 | | 0053 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 341.45 | 136,580.00 | 200.00 | 80,000.00 | 350.00 | 140,000.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,520 | SQFT | 125.46 | 441,619.20 | 115.00 | 404,800.00 | 120.00 | 422,400.00 | | 0055 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 272 | SFIN | 252.42 | 68,658.24 | 175.00 | 47,600.00 | 150.00 | 40,800.00 | | 0056 | 815-03-00300 | Joint Seal (Poured) | 396 | LNFT | 12.49 | 4,946.04 | 35.00 | 13,860.00 | 25.00 | 9,900.00 | | 0057 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 5,600 | SQFT | 386.62 | 2,165,072.00 | 400.00 | 2,240,000.00 | 428.00 | 2,396,800.00 | | 0058 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 264 | LNFT | 49.06 | 12,951.84 | 20.00 | 5,280.00 | 15.00 | 3,960.00 | | 0059 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 440 | LNFT | 39.25 | 17,270.00 | 4.00 | 1,760.00 | 15.00 | 6,600.00 | | 0060 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 352 | INLF | 12.27 | 4,319.04 | 10.00 | 3,520.00 | 15.00 | 5,280.00 | | 0061 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 4 | EACH | 12,523.48 | 50,093.92 | 12,000.00 | 48,000.00 | 20,000.00 | 80,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,393,757.55 | | 9,953,390.55 | | 10,888,229.93 |
|