Proposal:H.011196.6
Parish:Calcasieu
Description:LAKE CHARLES SRTS PROJ. - BARBE ELEM.
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, CURB RAMPS, AND RELATED WORK.
Estimated Construction Cost:$878,089.00
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $971,979.40 |
| 2 | 42520 | TRAHAN CONSTRUCTION, LLC | $989,084.19 |
| 3 | 14648 | McManus Construction, LLC | $1,165,077.61 |
| 4 | 30774 | Progressive Construction Co., LLC | $1,448,391.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - TRAHAN CONSTRUCTION, LLC | - 3 - McManus Construction, LLC | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 28,000.00 | 28,000.00 | 26,250.00 | 26,250.00 | 15,000.00 | 15,000.00 | 43,000.00 | 43,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,210.00 | 7,210.00 | 26,250.00 | 26,250.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,617 | SQYD | 19.00 | 30,723.00 | 12.08 | 19,533.36 | 40.00 | 64,680.00 | 18.00 | 29,106.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 530 | LNFT | 29.25 | 15,502.50 | 9.98 | 5,289.40 | 40.00 | 21,200.00 | 10.00 | 5,300.00 | | 0005 | 202-02-12020 | Removal of Fence (Chain Link) | 10 | LNFT | 46.25 | 462.50 | 52.60 | 526.00 | 20.00 | 200.00 | 32.00 | 320.00 | | 0006 | 202-03-38000 | Relocation of Sign | 27 | EACH | 105.00 | 2,835.00 | 131.25 | 3,543.75 | 350.00 | 9,450.00 | 400.00 | 10,800.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole (STREET SIGNS) | 20 | EACH | 142.00 | 2,840.00 | 99.75 | 1,995.00 | 500.00 | 10,000.00 | 400.00 | 8,000.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 53,650.00 | 53,650.00 | 52,500.00 | 52,500.00 | 20,000.00 | 20,000.00 | 150,000.00 | 150,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 84 | EACH | 30.00 | 2,520.00 | 47.25 | 3,969.00 | 24.00 | 2,016.00 | 50.00 | 4,200.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 5,188 | LNFT | 2.25 | 11,673.00 | 3.94 | 20,440.72 | 5.00 | 25,940.00 | 3.00 | 15,564.00 | | 0011 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 14 | LNFT | 171.00 | 2,394.00 | 86.10 | 1,205.40 | 200.00 | 2,800.00 | 300.00 | 4,200.00 | | 0012 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 8,500.00 | 8,500.00 | 8,190.00 | 8,190.00 | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | | 0013 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,950.00 | 6,950.00 | 8,190.00 | 8,190.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | | 0014 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 5 | EACH | 7,300.00 | 36,500.00 | 1,837.50 | 9,187.50 | 5,000.00 | 25,000.00 | 7,500.00 | 37,500.00 | | 0015 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 3,350.00 | 6,700.00 | 1,312.50 | 2,625.00 | 5,000.00 | 10,000.00 | 7,500.00 | 15,000.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 10 | EACH | 4,200.00 | 42,000.00 | 4,462.50 | 44,625.00 | 5,000.00 | 50,000.00 | 7,500.00 | 75,000.00 | | 0017 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 10 | LNFT | 120.00 | 1,200.00 | 47.25 | 472.50 | 200.00 | 2,000.00 | 100.00 | 1,000.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 2,499.1 | SQYD | 76.00 | 189,931.60 | 97.13 | 242,737.58 | 84.00 | 209,924.40 | 125.00 | 312,387.50 | | 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 816.3 | SQYD | 112.00 | 91,425.60 | 118.13 | 96,429.52 | 95.00 | 77,548.50 | 145.00 | 118,363.50 | | 0020 | 706-02-00300 | Concrete Drive (8" Thick) | 197.5 | SQYD | 125.00 | 24,687.50 | 131.25 | 25,921.88 | 105.00 | 20,737.50 | 150.00 | 29,625.00 | | 0021 | 706-04-00110 | Curb Ramps (Type 2) | 52 | SQYD | 300.00 | 15,600.00 | 367.50 | 19,110.00 | 600.00 | 31,200.00 | 300.00 | 15,600.00 | | 0022 | 706-04-00110 | Curb Ramps (Type 3) | 64.8 | SQYD | 325.00 | 21,060.00 | 341.25 | 22,113.00 | 500.00 | 32,400.00 | 300.00 | 19,440.00 | | 0023 | 706-04-00110 | Curb Ramps (Type 4) | 53.7 | SQYD | 215.00 | 11,545.50 | 288.75 | 15,505.88 | 600.00 | 32,220.00 | 300.00 | 16,110.00 | | 0024 | 706-04-00110 | Curb Ramps (Type 5) | 95.5 | SQYD | 215.00 | 20,532.50 | 262.50 | 25,068.75 | 700.00 | 66,850.00 | 300.00 | 28,650.00 | | 0025 | 706-04-00110 | Curb Ramps (Type 6) | 191.8 | SQYD | 240.00 | 46,032.00 | 236.25 | 45,312.75 | 600.00 | 115,080.00 | 300.00 | 57,540.00 | | 0026 | 706-04-00110 | Curb Ramps (Type 7) | 186.2 | SQYD | 280.00 | 52,136.00 | 183.75 | 34,214.25 | 600.00 | 111,720.00 | 300.00 | 55,860.00 | | 0027 | 707-01-00100 | Concrete Curb | 311 | LNFT | 31.00 | 9,641.00 | 99.75 | 31,022.25 | 50.00 | 15,550.00 | 33.00 | 10,263.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 63,650.00 | 63,650.00 | 52,500.00 | 52,500.00 | 64,800.00 | 64,800.00 | 100,000.00 | 100,000.00 | | 0029 | 714-01-00700 | Slab Sodding (Centipede) | 1,219 | SQYD | 7.00 | 8,533.00 | 13.13 | 16,005.47 | 10.00 | 12,190.00 | 15.00 | 18,285.00 | | 0030 | 726-01-00100 | Bedding Material | 7.4 | CUYD | 163.00 | 1,206.20 | 157.50 | 1,165.50 | 200.00 | 1,480.00 | 165.00 | 1,221.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 52,500.00 | 52,500.00 | 25,000.00 | 25,000.00 | 130,000.00 | 130,000.00 | | 0032 | 729-01-00100 | Sign (Type A) | 176 | SQFT | 36.00 | 6,336.00 | 36.75 | 6,468.00 | 75.00 | 13,200.00 | 55.00 | 9,680.00 | | 0033 | 729-21-00100 | U-Channel Post | 12 | EACH | 155.00 | 1,860.00 | 131.25 | 1,575.00 | 300.00 | 3,600.00 | 250.00 | 3,000.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 166 | LNFT | 46.50 | 7,719.00 | 34.13 | 5,665.58 | 18.00 | 2,988.00 | 30.00 | 4,980.00 | | 0035 | 732-05-00100 | Removal of Existing Markings | 0.167 | MILE | 42,000.00 | 7,014.00 | 26,250.00 | 4,383.75 | 1,725.00 | 288.08 | 15,250.00 | 2,546.75 | | 0036 | 739-01-00100 | Hydro-Seeding | 0.31 | ACRE | 3,850.00 | 1,193.50 | 5,040.00 | 1,562.40 | 4,887.50 | 1,515.13 | 15,000.00 | 4,650.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,800.00 | 8,800.00 | 26,250.00 | 26,250.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0038 | 741-35-00100 | Adjust Valve or Meter Box | 5 | EACH | 765.00 | 3,825.00 | 878.50 | 4,392.50 | 1,000.00 | 5,000.00 | 1,000.00 | 5,000.00 | | 0039 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 9 | EACH | 1,375.00 | 12,375.00 | 1,312.50 | 11,812.50 | 2,500.00 | 22,500.00 | 5,000.00 | 45,000.00 | | 0040 | NS-700-00100 | Trench Drains | 4 | EACH | 4,200.00 | 16,800.00 | 2,750.00 | 11,000.00 | 3,500.00 | 14,000.00 | 6,300.00 | 25,200.00 | | 0041 | TS-742-37000 | Adjusting Sanitary Sewer Cleanout | 1 | EACH | 416.00 | 416.00 | 1,575.00 | 1,575.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 971,979.40 | | 989,084.19 | | 1,165,077.61 | | 1,448,391.75 |
|