Proposal:4400030480.6
Parish:Caddo
Routes:LA 1
Description:LA 1: SOUTHFIELD ROAD TO STONER AVENUE
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,582,546.27
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $3,749,866.17 |
| 2 | 67822 | Earnest Contracting LLC | $4,401,051.91 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 502-01-00100 | Asphalt Concrete | 10,220.6 | TON | 160.00 | 1,635,296.00 | 200.00 | 2,044,120.00 | | 0002 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 495.3 | TON | 200.00 | 99,060.00 | 190.00 | 94,107.00 | | 0003 | 509-01-00100 | Milling Asphalt Pavement | 97,238 | SQYD | 4.50 | 437,571.00 | 8.00 | 777,904.00 | | 0004 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,062.9 | CUYD | 0.01 | -40.63 | 0.10 | -406.29 | | 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,796 | SQYD | 175.00 | 314,300.00 | 140.00 | 251,440.00 | | 0006 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 13 | EACH | 1,000.00 | 13,000.00 | 1,000.00 | 13,000.00 | | 0007 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 5,000.00 | 15,000.00 | 5,000.00 | 15,000.00 | | 0008 | 710-01-00100 | Flowable Fill | 50 | CUYD | 400.00 | 20,000.00 | 300.00 | 15,000.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | | 0010 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,943 | LNFT | 0.55 | 1,068.65 | 0.50 | 971.50 | | 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 550 | LNFT | 1.10 | 605.00 | 1.00 | 550.00 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.988 | MILE | 1,000.00 | 11,988.00 | 1,000.00 | 11,988.00 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.542 | MILE | 275.00 | 2,624.05 | 250.00 | 2,385.50 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.992 | MILE | 550.00 | 6,595.60 | 500.00 | 5,996.00 | | 0015 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 49 | EACH | 27.50 | 1,347.50 | 25.00 | 1,225.00 | | 0016 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 2 | EACH | 27.50 | 55.00 | 25.00 | 50.00 | | 0017 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 7 | EACH | 27.50 | 192.50 | 25.00 | 175.00 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | | 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,466 | EACH | 8.80 | 12,900.80 | 8.00 | 11,728.00 | | 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,943 | LNFT | 4.40 | 8,549.20 | 4.00 | 7,772.00 | | 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 550 | LNFT | 33.00 | 18,150.00 | 30.00 | 16,500.00 | | 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.992 | MILE | 8,250.00 | 98,934.00 | 7,500.00 | 89,940.00 | | 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.218 | MILE | 2,750.00 | 25,349.50 | 2,500.00 | 23,045.00 | | 0024 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.432 | MILE | 16,500.00 | 7,128.00 | 15,000.00 | 6,480.00 | | 0025 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.324 | MILE | 22,000.00 | 7,128.00 | 20,000.00 | 6,480.00 | | 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 49 | EACH | 440.00 | 21,560.00 | 400.00 | 19,600.00 | | 0027 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 990.00 | 1,980.00 | 900.00 | 1,800.00 | | 0028 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 550.00 | 3,850.00 | 500.00 | 3,500.00 | | 0029 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 7 | EACH | 2,200.00 | 15,400.00 | 2,000.00 | 14,000.00 | | 0030 | 732-05-00100 | Removal of Existing Markings | 0.324 | MILE | 54,500.00 | 17,658.00 | 50,000.00 | 16,200.00 | | 0031 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 110.00 | 2,200.00 | 50.00 | 1,000.00 | | 0032 | 736-09-00100 | Loop Detector | 650 | LNFT | 86.00 | 55,900.00 | 80.00 | 52,000.00 | | 0033 | 736-10-00100 | Underground Junction Box (Type D) | 2 | EACH | 1,550.00 | 3,100.00 | 1,400.00 | 2,800.00 | | 0034 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 110.00 | 2,200.00 | 47.50 | 950.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | | 0036 | 741-35-00100 | Adjust Valve or Meter Box | 8 | EACH | 750.00 | 6,000.00 | 1,000.00 | 8,000.00 | | 0037 | NS-500-00160 | Roadway Joint Reinforcing Mesh (Detail Repair System) | 82,277 | LNFT | 8.00 | 658,216.00 | 5.60 | 460,751.20 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,749,866.17 | | 4,401,051.91 |
|