Proposal:H.015621.6
Parish:Evangeline
Routes:LA 3277
Description:LA 3277: LA 757 - LA 104
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,845,101.78
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $5,233,980.83 |
| 2 | 34356 | Prairie Contractors LLC | $5,318,197.69 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $5,816,617.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Prairie Contractors LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) (0.46 acres) | 1 | LUMP | 9,000.00 | 9,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 27 | SQYD | 300.00 | 8,100.00 | 115.00 | 3,105.00 | 150.00 | 4,050.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 21 | SQYD | 25.00 | 525.00 | 30.00 | 630.00 | 200.00 | 4,200.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 978 | LNFT | 15.00 | 14,670.00 | 17.00 | 16,626.00 | 8.00 | 7,824.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP & 36" RCP | 24 | LNFT | 20.00 | 480.00 | 22.00 | 528.00 | 75.00 | 1,800.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 280 | LNFT | 15.00 | 4,200.00 | 22.00 | 6,160.00 | 30.00 | 8,400.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 20.00 | 24,000.00 | 60.00 | 72,000.00 | 70.00 | 84,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 52 | EACH | 155.00 | 8,060.00 | 180.00 | 9,360.00 | 175.00 | 9,100.00 | | 0009 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 75,252 | SQYD | 10.00 | 752,520.00 | 10.10 | 760,045.20 | 15.00 | 1,128,780.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 800 | SQYD | 9.00 | 7,200.00 | 10.00 | 8,000.00 | 30.00 | 24,000.00 | | 0011 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 74,753 | SQYD | 8.75 | 654,088.75 | 9.00 | 672,777.00 | 11.00 | 822,283.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 500 | CUYD | 36.00 | 18,000.00 | 40.00 | 20,000.00 | 65.00 | 32,500.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 33.00 | 6,600.00 | 85.00 | 17,000.00 | 76.00 | 15,200.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 16,568.5 | TON | 140.00 | 2,319,590.00 | 123.00 | 2,037,925.50 | 135.00 | 2,236,747.50 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 578.2 | TON | 275.00 | 159,005.00 | 194.00 | 112,170.80 | 300.00 | 173,460.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 57,848 | SQYD | 3.00 | 173,544.00 | 3.54 | 204,781.92 | 2.50 | 144,620.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,272 | CUYD | 1.00 | -3,272.00 | 0.01 | -32.72 | 1.00 | -3,272.00 | | 0018 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 272 | SQYD | 245.00 | 66,640.00 | 175.00 | 47,600.00 | 220.00 | 59,840.00 | | 0019 | 602-12-00100 | Undersealing Pavement | 5.6 | TON | 7,500.00 | 42,000.00 | 5,000.00 | 28,000.00 | 4,000.00 | 22,400.00 | | 0020 | 602-14-00100 | Holes | 12 | EACH | 1,000.00 | 12,000.00 | 750.00 | 9,000.00 | 600.00 | 7,200.00 | | 0021 | 701-05-01065 | Side Drain Pipe (24" RPVCP/CPEPDW) | 120 | LNFT | 145.00 | 17,400.00 | 260.00 | 31,200.00 | 400.00 | 48,000.00 | | 0022 | 701-05-02064 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW) | 200 | LNFT | 145.00 | 29,000.00 | 260.00 | 52,000.00 | 260.00 | 52,000.00 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 32 | LNFT | 355.00 | 11,360.00 | 350.00 | 11,200.00 | 400.00 | 12,800.00 | | 0024 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 8 | LNFT | 370.00 | 2,960.00 | 425.00 | 3,400.00 | 1,400.00 | 11,200.00 | | 0025 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,200.00 | 6,600.00 | 2,250.00 | 6,750.00 | 3,000.00 | 9,000.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 320 | LNFT | 15.00 | 4,800.00 | 10.00 | 3,200.00 | 25.00 | 8,000.00 | | 0027 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 520 | LNFT | 100.00 | 52,000.00 | 110.00 | 57,200.00 | 55.00 | 28,600.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 318.8 | LNFT | 33.00 | 10,520.40 | 40.00 | 12,752.00 | 35.00 | 11,158.00 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 150.00 | 30,000.00 | 126.00 | 25,200.00 | | 0030 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,500.00 | 5,500.00 | 6,500.00 | 6,500.00 | 4,300.00 | 4,300.00 | | 0031 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 4,000.00 | 28,000.00 | 5,000.00 | 35,000.00 | 4,100.00 | 28,700.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 12 | SQYD | 200.00 | 2,400.00 | 225.00 | 2,700.00 | 400.00 | 4,800.00 | | 0033 | 707-01-00100 | Concrete Curb | 108 | LNFT | 65.00 | 7,020.00 | 100.00 | 10,800.00 | 130.00 | 14,040.00 | | 0034 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 271 | SQYD | 175.00 | 47,425.00 | 175.00 | 47,425.00 | 160.00 | 43,360.00 | | 0035 | 711-04-00100 | Geotextile Fabric | 271 | SQYD | 6.00 | 1,626.00 | 6.00 | 1,626.00 | 5.00 | 1,355.00 | | 0036 | 712-02-00100 | Sacked Concrete Revetment | 103 | SQYD | 240.00 | 24,720.00 | 575.00 | 59,225.00 | 600.00 | 61,800.00 | | 0037 | 712-04-00100 | Flexible Revetment | 5 | SQYD | 300.00 | 1,500.00 | 175.00 | 875.00 | 1,000.00 | 5,000.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 70,000.00 | 70,000.00 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.682 | MILE | 154.00 | 2,261.03 | 600.00 | 8,809.20 | 225.00 | 3,303.45 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.539 | MILE | 500.00 | 6,769.50 | 1.00 | 13.54 | 800.00 | 10,831.20 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.502 | MILE | 850.00 | 30,176.70 | 1.00 | 35.50 | 1,100.00 | 39,052.20 | | 0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.68 | MILE | 1,000.00 | 9,680.00 | 1,100.00 | 10,648.00 | 1,100.00 | 10,648.00 | | 0044 | 726-01-00100 | Bedding Material 6" Thick | 36.9 | CUYD | 175.00 | 6,457.50 | 175.00 | 6,457.50 | 260.00 | 9,594.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 355,000.00 | 355,000.00 | 525,000.00 | 525,000.00 | 300,000.00 | 300,000.00 | | 0046 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 110.00 | 1,760.00 | 125.00 | 2,000.00 | 80.00 | 1,280.00 | | 0047 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 125.00 | 2,500.00 | 150.00 | 3,000.00 | 90.00 | 1,800.00 | | 0048 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 584 | EACH | 10.00 | 5,840.00 | 12.00 | 7,008.00 | 15.00 | 8,760.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 703 | EACH | 7.00 | 4,921.00 | 8.50 | 5,975.50 | 10.00 | 7,030.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.834 | MILE | 5,800.00 | 68,637.20 | 6,750.00 | 79,879.50 | 5,000.00 | 59,170.00 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.513 | MILE | 2,750.00 | 12,410.75 | 3,250.00 | 14,667.25 | 1,400.00 | 6,318.20 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.019 | MILE | 5,000.00 | 95.00 | 20,000.00 | 380.00 | 15,000.00 | 285.00 | | 0053 | 735-01-00100 | Mailboxes | 13 | EACH | 25.00 | 325.00 | 30.00 | 390.00 | 1.00 | 13.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 200.00 | 2,600.00 | 250.00 | 3,250.00 | 190.00 | 2,470.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 15.89 | ACRE | 2,500.00 | 39,725.00 | 3,000.00 | 47,670.00 | 2,600.00 | 41,314.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | | 0057 | 815-03-00300 | Joint Seal (Poured) | 435 | LNFT | 10.00 | 4,350.00 | 50.00 | 21,750.00 | 11.00 | 4,785.00 | | 0058 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 319 | LNFT | 5.00 | 1,595.00 | 7.50 | 2,392.50 | 11.00 | 3,509.00 | | 0059 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 319 | LNFT | 5.00 | 1,595.00 | 3.50 | 1,116.50 | 11.00 | 3,509.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 100 | INLF | 30.00 | 3,000.00 | 2.25 | 225.00 | 25.00 | 2,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,233,980.83 | | 5,318,197.69 | | 5,816,617.55 |
|