Proposal:H.015593.6
Parish:Avoyelles
Routes:LA 115
Description:LA 115: LA 1188 - LA 114 W JCT
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,218,844.62
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,829,283.92 |
| 2 | 55505 | MERRICK, LLC | $5,081,974.53 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $5,651,345.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - MERRICK, LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 69,000.00 | 69,000.00 | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 99 | SQYD | 100.00 | 9,900.00 | 20.00 | 1,980.00 | 90.00 | 8,910.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 701 | SQYD | 25.00 | 17,525.00 | 20.00 | 14,020.00 | 35.00 | 24,535.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (18" CMP) | 40 | LNFT | 15.00 | 600.00 | 35.00 | 1,400.00 | 50.00 | 2,000.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" EQUIV. CMPA) | 38 | LNFT | 20.00 | 760.00 | 35.00 | 1,330.00 | 50.00 | 1,900.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (12" RCP) (15" RCP) | 616 | LNFT | 15.00 | 9,240.00 | 35.00 | 21,560.00 | 50.00 | 30,800.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (12"PP) (15"PP) | 60 | LNFT | 15.00 | 900.00 | 35.00 | 2,100.00 | 50.00 | 3,000.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (15" CMP) (8" SP) | 53 | LNFT | 15.00 | 795.00 | 35.00 | 1,855.00 | 75.00 | 3,975.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) (18" PP) (21" Equiv. CMPA) | 233 | LNFT | 15.00 | 3,495.00 | 35.00 | 8,155.00 | 100.00 | 23,300.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 513 | LNFT | 15.00 | 7,695.00 | 35.00 | 17,955.00 | 80.00 | 41,040.00 | | 0012 | 202-02-32120 | Removal of Pipe (Side Drain) (24" CMP) (24" PP) | 58 | LNFT | 15.00 | 870.00 | 35.00 | 2,030.00 | 70.00 | 4,060.00 | | 0013 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP) | 64 | LNFT | 15.00 | 960.00 | 35.00 | 2,240.00 | 65.00 | 4,160.00 | | 0014 | 202-02-32120 | Removal of Pipe (Side Drain) (30" CMP) | 112 | LNFT | 20.00 | 2,240.00 | 35.00 | 3,920.00 | 60.00 | 6,720.00 | | 0015 | 202-02-32120 | Removal of Pipe (Side Drain) (36" EQUIV. CMPA) | 30 | LNFT | 20.00 | 600.00 | 35.00 | 1,050.00 | 60.00 | 1,800.00 | | 0016 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,267 | CUYD | 27.00 | 34,209.00 | 40.00 | 50,680.00 | 32.00 | 40,544.00 | | 0017 | 203-10-00100 | Cleaning Existing Ditches | 2,690 | LNFT | 12.00 | 32,280.00 | 15.00 | 40,350.00 | 10.00 | 26,900.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 32 | EACH | 140.00 | 4,480.00 | 150.00 | 4,800.00 | 25.00 | 800.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 960 | LNFT | 4.00 | 3,840.00 | 4.50 | 4,320.00 | 2.25 | 2,160.00 | | 0020 | 303-02-00100 | Removal of Existing Patches | 300 | SQYD | 1.00 | 300.00 | 30.00 | 9,000.00 | 38.00 | 11,400.00 | | 0021 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 34,203.3 | SQYD | 14.00 | 478,846.20 | 14.00 | 478,846.20 | 11.00 | 376,236.30 | | 0022 | 304-01-00100 | Lime | 81.9 | TON | 368.00 | 30,139.20 | 290.00 | 23,751.00 | 300.00 | 24,570.00 | | 0023 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 5,778 | SQYD | 6.50 | 37,557.00 | 2.25 | 13,000.50 | 11.00 | 63,558.00 | | 0024 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,739 | CUYD | 30.00 | 52,170.00 | 35.00 | 60,865.00 | 35.00 | 60,865.00 | | 0025 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 40.00 | 8,000.00 | 140.00 | 28,000.00 | 60.00 | 12,000.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 11,289.8 | TON | 120.00 | 1,354,776.00 | 138.00 | 1,557,992.40 | 125.00 | 1,411,225.00 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,541.1 | TON | 190.00 | 292,809.00 | 310.00 | 477,741.00 | 210.00 | 323,631.00 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 34,339 | SQYD | 4.00 | 137,356.00 | 4.00 | 137,356.00 | 3.00 | 103,017.00 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,842 | CUYD | 1.00 | -1,842.00 | 0.10 | -184.20 | 10.00 | -18,420.00 | | 0030 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,200 | SQYD | 120.00 | 144,000.00 | 175.00 | 210,000.00 | 140.00 | 168,000.00 | | 0031 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 40 | LNFT | 275.00 | 11,000.00 | 315.00 | 12,600.00 | 665.00 | 26,600.00 | | 0032 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 38 | LNFT | 300.00 | 11,400.00 | 340.00 | 12,920.00 | 715.00 | 27,170.00 | | 0033 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 1,037 | LNFT | 125.00 | 129,625.00 | 90.00 | 93,330.00 | 260.00 | 269,620.00 | | 0034 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 80 | LNFT | 125.00 | 10,000.00 | 120.00 | 9,600.00 | 325.00 | 26,000.00 | | 0035 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 96 | LNFT | 155.00 | 14,880.00 | 145.00 | 13,920.00 | 325.00 | 31,200.00 | | 0036 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 32 | LNFT | 170.00 | 5,440.00 | 175.00 | 5,600.00 | 425.00 | 13,600.00 | | 0037 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 112 | LNFT | 250.00 | 28,000.00 | 125.00 | 14,000.00 | 250.00 | 28,000.00 | | 0038 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 8 | LNFT | 255.00 | 2,040.00 | 160.00 | 1,280.00 | 400.00 | 3,200.00 | | 0039 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,400.00 | 2,400.00 | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 | | 0040 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 206 | LNFT | 15.00 | 3,090.00 | 8.00 | 1,648.00 | 40.00 | 8,240.00 | | 0041 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 9,500.00 | 28,500.00 | 6,000.00 | 18,000.00 | 14,000.00 | 42,000.00 | | 0042 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 7 | EACH | 550.00 | 3,850.00 | 1,000.00 | 7,000.00 | 500.00 | 3,500.00 | | 0043 | 702-08-00100 | Side Drain Safety End (Type 1) | 297 | EACH | 2,500.00 | 742,500.00 | 2,000.00 | 594,000.00 | 3,300.00 | 980,100.00 | | 0044 | 702-08-00200 | Side Drain Safety End (Type 2) | 26 | EACH | 9,000.00 | 234,000.00 | 7,200.00 | 187,200.00 | 12,000.00 | 312,000.00 | | 0045 | 706-01-00100 | Concrete Walk (4" Thick) | 11.4 | SQYD | 110.00 | 1,254.00 | 350.00 | 3,990.00 | 300.00 | 3,420.00 | | 0046 | 706-02-00200 | Concrete Drive (6" Thick) | 322.1 | SQYD | 110.00 | 35,431.00 | 165.00 | 53,146.50 | 265.00 | 85,356.50 | | 0047 | 712-03-00100 | Stone Revetment | 118 | SQYD | 165.00 | 19,470.00 | 115.00 | 13,570.00 | 210.00 | 24,780.00 | | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 135,000.00 | 135,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | | 0049 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 34.596 | MILE | 154.00 | 5,327.78 | 100.00 | 3,459.60 | 225.00 | 7,784.10 | | 0050 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.239 | MILE | 700.00 | 2,267.30 | 700.00 | 2,267.30 | 700.00 | 2,267.30 | | 0051 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.035 | MILE | 1.00 | 24.04 | 1,000.00 | 24,035.00 | 1,100.00 | 26,438.50 | | 0052 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 582 | EACH | 5.00 | 2,910.00 | 9.00 | 5,238.00 | 10.00 | 5,820.00 | | 0053 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | | 0054 | 724-01-00100 | Rumble Strips (Centerline) | 1.108 | MILE | 1,000.00 | 1,108.00 | 1,100.00 | 1,218.80 | 1,100.00 | 1,218.80 | | 0055 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.405 | MILE | 1,000.00 | 4,405.00 | 1,200.00 | 5,286.00 | 1,100.00 | 4,845.50 | | 0056 | 726-01-00100 | Bedding Material | 512.8 | CUYD | 165.00 | 84,612.00 | 145.00 | 74,356.00 | 128.00 | 65,638.40 | | 0057 | 727-01-00100 | Mobilization | 1 | LUMP | 415,000.00 | 415,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | | 0058 | 729-01-00100 | Sign (Type A) | 39 | SQFT | 25.00 | 975.00 | 35.00 | 1,365.00 | 35.00 | 1,365.00 | | 0059 | 729-02-00100 | Sign (Type B) | 66 | SQFT | 25.00 | 1,650.00 | 45.00 | 2,970.00 | 35.00 | 2,310.00 | | 0060 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 75.00 | 300.00 | 90.00 | 360.00 | 75.00 | 300.00 | | 0061 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 17 | EACH | 175.00 | 2,975.00 | 300.00 | 5,100.00 | 250.00 | 4,250.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 535 | EACH | 7.00 | 3,745.00 | 7.50 | 4,012.50 | 7.00 | 3,745.00 | | 0063 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 182 | LNFT | 17.00 | 3,094.00 | 20.00 | 3,640.00 | 17.00 | 3,094.00 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.488 | MILE | 5,800.00 | 49,230.40 | 5,600.00 | 47,532.80 | 6,000.00 | 50,928.00 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.08 | MILE | 2,850.00 | 3,078.00 | 3,000.00 | 3,240.00 | 3,000.00 | 3,240.00 | | 0066 | 735-01-00100 | Mailboxes | 60 | EACH | 1.00 | 60.00 | 280.00 | 16,800.00 | 30.00 | 1,800.00 | | 0067 | 735-02-00100 | Mailbox Supports (Single) | 60 | EACH | 210.00 | 12,600.00 | 22.00 | 1,320.00 | 210.00 | 12,600.00 | | 0068 | 739-01-00100 | Hydro-Seeding | 2.52 | ACRE | 3,500.00 | 8,820.00 | 2,828.32 | 7,127.37 | 2,500.00 | 6,300.00 | | 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,500.00 | 25,500.00 | 13,000.00 | 13,000.00 | 21,500.00 | 21,500.00 | | 0070 | 805-01-01000 | Class A1 Concrete (Headwalls) (17'-3" X 3'-5") | 7.84 | CUYD | 1,900.00 | 14,896.00 | 2,400.00 | 18,816.00 | 2,400.00 | 18,816.00 | | 0071 | 806-02-00100 | Deformed Reinforcing Steel (Corrosion Resistant) (Stainless Steel) | 436 | LB | 15.00 | 6,540.00 | 12.00 | 5,232.00 | 15.00 | 6,540.00 | | 0072 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 10,524 | INLF | 1.50 | 15,786.00 | 1.49 | 15,680.76 | 3.00 | 31,572.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,829,283.92 | | 5,081,974.53 | | 5,651,345.40 |
|