Proposal:H.015471.6
Parish:Lincoln
Description:E. KENTUCKY AVE: GOODWIN TO LA 33
Type Construction:CLEARING AND GRUBBING, GRADING, TEMPORARY DETOUR ROAD, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, CONCRETE WALKS AND DRIVES, WATER DISTRIBUTION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$11,232,134.70
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $10,292,040.00 |
| 2 | 15099 | Amethyst Construction, Inc. | $11,636,886.40 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $16,481,689.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - Amethyst Construction, Inc. | - 3 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing 1 acre | 1 | LUMP | 25,000.00 | 25,000.00 | 110,000.00 | 110,000.00 | 400,000.00 | 400,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 150,000.00 | 150,000.00 | 300,000.00 | 300,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,670 | SQYD | 8.00 | 13,360.00 | 12.00 | 20,040.00 | 12.00 | 20,040.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 17,265 | SQYD | 6.00 | 103,590.00 | 7.00 | 120,855.00 | 11.00 | 189,915.00 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 17,265 | SQYD | 7.00 | 120,855.00 | 12.00 | 207,180.00 | 12.00 | 207,180.00 | | 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 300 | LNFT | 15.00 | 4,500.00 | 16.00 | 4,800.00 | 28.00 | 8,400.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,920 | SQYD | 8.00 | 15,360.00 | 12.00 | 23,040.00 | 24.00 | 46,080.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 12'' RCP | 25 | LNFT | 32.00 | 800.00 | 42.00 | 1,050.00 | 65.00 | 1,625.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 15'' CPP | 160 | LNFT | 25.00 | 4,000.00 | 42.00 | 6,720.00 | 80.00 | 12,800.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) 15'' RCP | 25 | LNFT | 32.00 | 800.00 | 42.00 | 1,050.00 | 65.00 | 1,625.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 18'' CPP | 115 | LNFT | 35.00 | 4,025.00 | 42.00 | 4,830.00 | 80.00 | 9,200.00 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 18'' RCP | 135 | LNFT | 35.00 | 4,725.00 | 42.00 | 5,670.00 | 70.00 | 9,450.00 | | 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) 24'' CPP | 420 | LNFT | 30.00 | 12,600.00 | 42.00 | 17,640.00 | 60.00 | 25,200.00 | | 0014 | 202-02-32140 | Removal of Pipe (Storm Drain) 24'' PP | 135 | LNFT | 35.00 | 4,725.00 | 42.00 | 5,670.00 | 70.00 | 9,450.00 | | 0015 | 202-02-32140 | Removal of Pipe (Storm Drain) 24'' RCP | 85 | LNFT | 47.00 | 3,995.00 | 42.00 | 3,570.00 | 75.00 | 6,375.00 | | 0016 | 202-02-32140 | Removal of Pipe (Storm Drain) 30'' CPP | 20 | LNFT | 40.00 | 800.00 | 42.00 | 840.00 | 80.00 | 1,600.00 | | 0017 | 202-02-32140 | Removal of Pipe (Storm Drain) 30'' RCP | 15 | LNFT | 53.00 | 795.00 | 42.00 | 630.00 | 110.00 | 1,650.00 | | 0018 | 202-02-32140 | Removal of Pipe (Storm Drain) 48'' CPP | 40 | LNFT | 50.00 | 2,000.00 | 42.00 | 1,680.00 | 150.00 | 6,000.00 | | 0019 | 202-02-38200 | Removal of Signs | 16 | EACH | 45.00 | 720.00 | 60.00 | 960.00 | 100.00 | 1,600.00 | | 0020 | 202-02-38220 | Removal of Sign Supports | 16 | EACH | 45.00 | 720.00 | 165.00 | 2,640.00 | 300.00 | 4,800.00 | | 0021 | 202-03-38000 | Relocation of Sign | 14 | EACH | 100.00 | 1,400.00 | 300.00 | 4,200.00 | 100.00 | 1,400.00 | | 0022 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 475,000.00 | 475,000.00 | 950,000.00 | 950,000.00 | 1,540,000.00 | 1,540,000.00 | | 0023 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 40.00 | 4,000.00 | 45.00 | 4,500.00 | 40.00 | 4,000.00 | | 0024 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 200.00 | 2,000.00 | 225.00 | 2,250.00 | 200.00 | 2,000.00 | | 0025 | 204-06-00100 | Temporary Silt Fencing | 12,000 | LNFT | 3.25 | 39,000.00 | 3.75 | 45,000.00 | 7.00 | 84,000.00 | | 0027 | 304-01-00100 | Lime | 355 | TON | 365.00 | 129,575.00 | 425.00 | 150,875.00 | 300.00 | 106,500.00 | | 0028 | 304-05-00100 | Lime Treatment (Type E) | 25,005 | SQYD | 6.00 | 150,030.00 | 2.25 | 56,261.25 | 5.00 | 125,025.00 | | 0029 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 130.00 | 26,000.00 | 145.00 | 29,000.00 | 400.00 | 80,000.00 | | 0030 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) NON-MAINLINE TRAFFIC MAINTENANCE SURFACING | 700 | CUYD | 130.00 | 91,000.00 | 145.00 | 101,500.00 | 170.00 | 119,000.00 | | 0031 | 502-01-00100 | Asphalt Concrete | 5,705 | TON | 201.00 | 1,146,705.00 | 170.00 | 969,850.00 | 185.00 | 1,055,425.00 | | 0032 | 509-01-00100 | Milling Asphalt Pavement | 1,855 | SQYD | 10.00 | 18,550.00 | 9.00 | 16,695.00 | 19.00 | 35,245.00 | | 0033 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) . | 206 | SQYD | 138.00 | 28,428.00 | 200.00 | 41,200.00 | 170.00 | 35,020.00 | | 0034 | 510-02-00100 | Pavement Widening (2'' Asphaltic Concrete over 12'' Full Depth Asphalt) | 156 | SQYD | 165.00 | 25,740.00 | 205.00 | 31,980.00 | 185.00 | 28,860.00 | | 0035 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 5,160 | LNFT | 71.00 | 366,360.00 | 100.00 | 516,000.00 | 130.00 | 670,800.00 | | 0036 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,090 | LNFT | 76.50 | 159,885.00 | 118.00 | 246,620.00 | 140.00 | 292,600.00 | | 0037 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 400 | LNFT | 94.75 | 37,900.00 | 148.00 | 59,200.00 | 190.00 | 76,000.00 | | 0038 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 1,324 | LNFT | 120.50 | 159,542.00 | 185.00 | 244,940.00 | 220.00 | 291,280.00 | | 0039 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 120 | LNFT | 156.50 | 18,780.00 | 260.00 | 31,200.00 | 400.00 | 48,000.00 | | 0040 | 701-05-01022 | Side Drain Pipe (15" RCP/RPVCP/CMP) | 40 | LNFT | 71.00 | 2,840.00 | 125.00 | 5,000.00 | 300.00 | 12,000.00 | | 0041 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 72 | LNFT | 141.00 | 10,152.00 | 345.00 | 24,840.00 | 400.00 | 28,800.00 | | 0042 | 701-15-00100 | Concrete Collar | 17 | EACH | 1,150.00 | 19,550.00 | 2,400.00 | 40,800.00 | 2,500.00 | 42,500.00 | | 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 8,300 | LNFT | 3.00 | 24,900.00 | 1.00 | 8,300.00 | 1.00 | 8,300.00 | | 0044 | 702-02-00100 | Manholes (MH-06) | 5 | EACH | 6,500.00 | 32,500.00 | 9,800.00 | 49,000.00 | 13,000.00 | 65,000.00 | | 0045 | 702-02-00100 | Manholes (MH-06) (CONFLICT BOX) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 65,000.00 | 65,000.00 | | 0046 | 702-03-00100 | Catch Basins (CB-01) | 21 | EACH | 4,300.00 | 90,300.00 | 7,500.00 | 157,500.00 | 12,000.00 | 252,000.00 | | 0047 | 702-03-00500 | Catch Basins (CB-06) | 46 | EACH | 6,000.00 | 276,000.00 | 7,400.00 | 340,400.00 | 14,000.00 | 644,000.00 | | 0048 | 702-03-00600 | Catch Basins (CB-07) | 24 | EACH | 7,500.00 | 180,000.00 | 9,400.00 | 225,600.00 | 16,000.00 | 384,000.00 | | 0049 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 13,500.00 | 27,000.00 | 17,000.00 | 34,000.00 | 28,000.00 | 56,000.00 | | 0050 | 702-04-00100 | Adjusting Manholes | 11 | EACH | 1,000.00 | 11,000.00 | 2,450.00 | 26,950.00 | 7,000.00 | 77,000.00 | | 0051 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 5,650.00 | 11,300.00 | 3,250.00 | 6,500.00 | 7,000.00 | 14,000.00 | | 0052 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 4,500.00 | 4,500.00 | 2,950.00 | 2,950.00 | 7,000.00 | 7,000.00 | | 0053 | 706-01-00100 | Concrete Walk (4" Thick) | 7,665 | SQYD | 74.00 | 567,210.00 | 95.00 | 728,175.00 | 100.00 | 766,500.00 | | 0054 | 706-02-00200 | Concrete Drive (6" Thick) | 3,030 | SQYD | 142.00 | 430,260.00 | 110.00 | 333,300.00 | 100.00 | 303,000.00 | | 0055 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 75 | SQYD | 150.00 | 11,250.00 | 190.00 | 14,250.00 | 130.00 | 9,750.00 | | 0056 | 706-04-00110 | Curb Ramps Type 7 | 186.2 | SQYD | 175.00 | 32,585.00 | 180.00 | 33,516.00 | 200.00 | 37,240.00 | | 0057 | 707-03-00100 | Combination Concrete Curb and Gutter | 11,900 | LNFT | 35.00 | 416,500.00 | 52.00 | 618,800.00 | 40.00 | 476,000.00 | | 0058 | 710-01-00100 | Flowable Fill | 38 | CUYD | 250.00 | 9,500.00 | 400.00 | 15,200.00 | 500.00 | 19,000.00 | | 0059 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 103 | SQYD | 150.00 | 15,450.00 | 210.00 | 21,630.00 | 250.00 | 25,750.00 | | 0060 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 78,000.00 | 78,000.00 | 400,000.00 | 400,000.00 | 475,000.00 | 475,000.00 | | 0061 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 24,353 | LNFT | 1.00 | 24,353.00 | 0.30 | 7,305.90 | 0.20 | 4,870.60 | | 0062 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 105 | EACH | 260.00 | 27,300.00 | 150.00 | 15,750.00 | 250.00 | 26,250.00 | | 0063 | 714-01-00700 | Slab Sodding (Centipede) | 21,560 | SQYD | 9.00 | 194,040.00 | 9.75 | 210,210.00 | 10.00 | 215,600.00 | | 0064 | 717-01-00100 | Seeding | 80 | LB | 30.00 | 2,400.00 | 35.00 | 2,800.00 | 30.00 | 2,400.00 | | 0065 | 718-01-00100 | Fertilizer | 6,485 | LB | 1.00 | 6,485.00 | 1.25 | 8,106.25 | 1.00 | 6,485.00 | | 0066 | 725-01-00100 | Temporary Detour Roads | 11,500 | SQYD | 65.00 | 747,500.00 | 68.00 | 782,000.00 | 90.00 | 1,035,000.00 | | 0067 | 726-01-00100 | Bedding Material | 1,040 | CUYD | 132.50 | 137,800.00 | 145.00 | 150,800.00 | 160.00 | 166,400.00 | | 0068 | 727-01-00100 | Mobilization | 1 | LUMP | 590,000.00 | 590,000.00 | 580,000.00 | 580,000.00 | 1,630,000.00 | 1,630,000.00 | | 0069 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 205 | SQFT | 35.00 | 7,175.00 | 65.00 | 13,325.00 | 30.00 | 6,150.00 | | 0070 | 729-21-00100 | U-Channel Post | 30 | EACH | 135.00 | 4,050.00 | 95.00 | 2,850.00 | 200.00 | 6,000.00 | | 0071 | 731-02-00100 | Reflectorized Raised Pavement Markers | 300 | EACH | 15.00 | 4,500.00 | 8.00 | 2,400.00 | 6.00 | 1,800.00 | | 0072 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 23,590 | LNFT | 2.00 | 47,180.00 | 2.00 | 47,180.00 | 1.00 | 23,590.00 | | 0073 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 250 | LNFT | 10.00 | 2,500.00 | 8.00 | 2,000.00 | 6.00 | 1,500.00 | | 0074 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,326 | LNFT | 30.00 | 39,780.00 | 22.00 | 29,172.00 | 19.00 | 25,194.00 | | 0075 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.5 | MILE | 5,000.00 | 7,500.00 | 1,600.00 | 2,400.00 | 1,200.00 | 1,800.00 | | 0076 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.1 | MILE | 15,000.00 | 1,500.00 | 17,000.00 | 1,700.00 | 15,000.00 | 1,500.00 | | 0077 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 350.00 | 350.00 | | 0078 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 33 | EACH | 500.00 | 16,500.00 | 500.00 | 16,500.00 | 350.00 | 11,550.00 | | 0079 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 350.00 | 700.00 | | 0080 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 9 | EACH | 500.00 | 4,500.00 | 550.00 | 4,950.00 | 475.00 | 4,275.00 | | 0081 | 735-01-00100 | Mailboxes | 12 | EACH | 50.00 | 600.00 | 30.00 | 360.00 | 20.00 | 240.00 | | 0082 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 200.00 | 2,400.00 | 325.00 | 3,900.00 | 250.00 | 3,000.00 | | 0083 | 740-01-00100 | Construction Layout | 1 | LUMP | 190,000.00 | 190,000.00 | 130,000.00 | 130,000.00 | 475,000.00 | 475,000.00 | | 0084 | 741-20-01060 | Water Main (4" PVC) | 60 | LNFT | 100.00 | 6,000.00 | 60.00 | 3,600.00 | 57.00 | 3,420.00 | | 0085 | 741-20-01080 | Water Main (6" PVC) | 40 | LNFT | 120.00 | 4,800.00 | 65.00 | 2,600.00 | 86.00 | 3,440.00 | | 0086 | 741-20-01100 | Water Main (8" PVC) | 80 | LNFT | 140.00 | 11,200.00 | 70.00 | 5,600.00 | 170.00 | 13,600.00 | | 0087 | 741-20-01130 | Water Main (12" PVC) | 4,140 | LNFT | 205.00 | 848,700.00 | 85.00 | 351,900.00 | 160.00 | 662,400.00 | | 0088 | 741-20-01160 | Water Main (16" PVC) | 900 | LNFT | 250.00 | 225,000.00 | 128.00 | 115,200.00 | 230.00 | 207,000.00 | | 0089 | 741-21-00200 | Gate Valve (4") | 2 | EACH | 2,500.00 | 5,000.00 | 1,800.00 | 3,600.00 | 1,900.00 | 3,800.00 | | 0090 | 741-21-00300 | Gate Valve (6") | 1 | EACH | 2,800.00 | 2,800.00 | 2,200.00 | 2,200.00 | 2,300.00 | 2,300.00 | | 0091 | 741-21-00400 | Gate Valve (8") | 5 | EACH | 3,500.00 | 17,500.00 | 2,800.00 | 14,000.00 | 3,100.00 | 15,500.00 | | 0092 | 741-21-00600 | Gate Valve (12") | 10 | EACH | 5,200.00 | 52,000.00 | 5,200.00 | 52,000.00 | 5,700.00 | 57,000.00 | | 0093 | 741-28-02010 | Service Connection (3/4" PE) | 665 | LNFT | 50.00 | 33,250.00 | 35.00 | 23,275.00 | 26.00 | 17,290.00 | | 0094 | 741-28-02020 | Service Connection (1" PE) | 280 | LNFT | 60.00 | 16,800.00 | 40.00 | 11,200.00 | 30.00 | 8,400.00 | | 0095 | 741-29-00100 | Relocate Fire Hydrant | 2 | EACH | 7,000.00 | 14,000.00 | 3,500.00 | 7,000.00 | 7,700.00 | 15,400.00 | | 0096 | 741-31-00100 | Relocate Water Meter | 6 | EACH | 800.00 | 4,800.00 | 1,450.00 | 8,700.00 | 700.00 | 4,200.00 | | 0097 | 741-35-00100 | Adjust Valve or Meter Box | 7 | EACH | 800.00 | 5,600.00 | 1,200.00 | 8,400.00 | 400.00 | 2,800.00 | | 0098 | 741-38-00100 | Removal of Fire Hydrant | 5 | EACH | 800.00 | 4,000.00 | 475.00 | 2,375.00 | 2,000.00 | 10,000.00 | | 0099 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 88.2 | CUYD | 1,800.00 | 158,760.00 | 2,700.00 | 238,140.00 | 3,000.00 | 264,600.00 | | 0100 | 805-01-01000 | Class A1 Concrete (Headwalls) See sheet 3e for details | 42 | CUYD | 3,750.00 | 157,500.00 | 3,200.00 | 134,400.00 | 5,000.00 | 210,000.00 | | 0101 | 806-01-00100 | Deformed Reinforcing Steel | 9,400 | LB | 2.75 | 25,850.00 | 5.00 | 47,000.00 | 4.00 | 37,600.00 | | 0102 | 810-04-00100 | Hand Railing | 110 | LNFT | 315.00 | 34,650.00 | 100.00 | 11,000.00 | 400.00 | 44,000.00 | | 0103 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 200 | TON | 185.00 | 37,000.00 | 235.00 | 47,000.00 | 300.00 | 60,000.00 | | 0104 | TS-741-00100 | Fire Hydrant Assembly | 6 | EACH | 8,000.00 | 48,000.00 | 5,900.00 | 35,400.00 | 10,500.00 | 63,000.00 | | 0105 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 25,005 | SQYD | 41.00 | 1,025,205.00 | 48.00 | 1,200,240.00 | 60.00 | 1,500,300.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,292,040.00 | | 11,636,886.40 | | 16,481,689.60 |
|