Proposal:H.015357.6
Parish:St. Landry
Routes:LA 182, LA 31
Description:LA 31/LA 182: LA 742 - 0.355MI. N. LA 31
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, CLASS II BASE COURSE, ROADWAY REINFORCING MESH, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,277,109.80
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $3,352,455.37 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,863,817.90 |
| 3 | 34356 | Prairie Contractors LLC | $5,521,944.13 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 111 | SQYD | 24.00 | 2,664.00 | 40.00 | 4,440.00 | 60.00 | 6,660.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure (4" THICK) | 1,663.4 | SQYD | 7.00 | 11,643.80 | 25.00 | 41,585.00 | 45.00 | 74,853.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 2,155.00 | 6,465.00 | 6,000.00 | 18,000.00 | 2,000.00 | 6,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 81 | SQYD | 35.00 | 2,835.00 | 65.00 | 5,265.00 | 100.00 | 8,100.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CPEPDW | 124 | LNFT | 21.30 | 2,641.20 | 17.00 | 2,108.00 | 50.00 | 6,200.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 23,275.00 | 23,275.00 | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 175.00 | 3,150.00 | 160.00 | 2,880.00 | 275.00 | 4,950.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 4,136 | LNFT | 2.50 | 10,340.00 | 2.25 | 9,306.00 | 3.00 | 12,408.00 | | 0009 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 1,463.1 | SQYD | 100.00 | 146,310.00 | 100.00 | 146,310.00 | 190.00 | 277,989.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 205 | CUYD | 64.00 | 13,120.00 | 90.00 | 18,450.00 | 121.00 | 24,805.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 52.00 | 5,200.00 | 90.00 | 9,000.00 | 50.00 | 5,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 6,547.1 | TON | 144.50 | 946,055.95 | 180.00 | 1,178,478.00 | 169.00 | 1,106,459.90 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 293.8 | TON | 184.00 | 54,059.20 | 380.00 | 111,644.00 | 300.00 | 88,140.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 40,057 | SQYD | 3.25 | 130,185.25 | 3.00 | 120,171.00 | 11.00 | 440,627.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,321 | CUYD | 0.10 | -232.10 | 1.00 | -2,321.00 | 0.01 | -23.21 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,387 | SQYD | 218.50 | 521,559.50 | 210.00 | 501,270.00 | 215.00 | 513,205.00 | | 0017 | 510-02-00100 | Pavement Widening (16" Minimum Thickness) | 508.5 | SQYD | 215.30 | 109,480.05 | 245.00 | 124,582.50 | 210.00 | 106,785.00 | | 0018 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 59.6 | SQYD | 165.00 | 9,834.00 | 220.00 | 13,112.00 | 225.00 | 13,410.00 | | 0019 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 34,456 | LNFT | 3.00 | 103,368.00 | 5.00 | 172,280.00 | 5.00 | 172,280.00 | | 0020 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 21,254 | LNFT | 3.50 | 74,389.00 | 5.00 | 106,270.00 | 5.00 | 106,270.00 | | 0021 | 602-10-00100 | Longitudinal Shoulder Joints | 8,809 | LNFT | 3.00 | 26,427.00 | 4.00 | 35,236.00 | 3.75 | 33,033.75 | | 0022 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching 12" THICK | 38.1 | SQYD | 320.00 | 12,192.00 | 1,100.00 | 41,910.00 | 1,400.00 | 53,340.00 | | 0023 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 124 | LNFT | 118.50 | 14,694.00 | 400.00 | 49,600.00 | 350.00 | 43,400.00 | | 0024 | 701-14-00100 | Cleaning Existing Pipes | 111 | LNFT | 150.00 | 16,650.00 | 28.00 | 3,108.00 | 600.00 | 66,600.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,500.00 | 4,500.00 | 17,000.00 | 17,000.00 | 9,000.00 | 9,000.00 | | 0026 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 6,650.00 | 6,650.00 | 18,000.00 | 18,000.00 | 15,000.00 | 15,000.00 | | 0027 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 8,530.00 | 8,530.00 | 19,000.00 | 19,000.00 | 15,000.00 | 15,000.00 | | 0028 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 14 | EACH | 220.00 | 3,080.00 | 600.00 | 8,400.00 | 1,250.00 | 17,500.00 | | 0029 | 706-01-00100 | Concrete Walk (4" Thick) | 25 | SQYD | 75.00 | 1,875.00 | 130.00 | 3,250.00 | 200.00 | 5,000.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 58.3 | SQYD | 95.00 | 5,538.50 | 130.00 | 7,579.00 | 200.00 | 11,660.00 | | 0031 | 706-04-00110 | Curb Ramps Type 1 | 38.4 | SQYD | 300.00 | 11,520.00 | 350.00 | 13,440.00 | 450.00 | 17,280.00 | | 0032 | 706-04-00110 | Curb Ramps Type 2 | 10.4 | SQYD | 300.00 | 3,120.00 | 350.00 | 3,640.00 | 450.00 | 4,680.00 | | 0033 | 706-04-00110 | Curb Ramps Type 4 | 17.9 | SQYD | 300.00 | 5,370.00 | 350.00 | 6,265.00 | 450.00 | 8,055.00 | | 0034 | 706-04-00110 | Curb Ramps Type 7 | 13.3 | SQYD | 300.00 | 3,990.00 | 350.00 | 4,655.00 | 450.00 | 5,985.00 | | 0035 | 706-04-00110 | Curb Ramps Type 8 | 15.5 | SQYD | 300.00 | 4,650.00 | 350.00 | 5,425.00 | 450.00 | 6,975.00 | | 0036 | 707-03-00100 | Combination Concrete Curb and Gutter | 110.2 | LNFT | 55.00 | 6,061.00 | 125.00 | 13,775.00 | 175.00 | 19,285.00 | | 0037 | 712-02-00100 | Sacked Concrete Revetment | 5 | SQYD | 510.00 | 2,550.00 | 1,800.00 | 9,000.00 | 600.00 | 3,000.00 | | 0038 | 712-04-00100 | Flexible Revetment | 10 | SQYD | 160.00 | 1,600.00 | 450.00 | 4,500.00 | 250.00 | 2,500.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 337,600.00 | 337,600.00 | 100,000.00 | 100,000.00 | 500,000.00 | 500,000.00 | | 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,493 | LNFT | 0.15 | 223.95 | 1.00 | 1,493.00 | 0.10 | 149.30 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 491 | LNFT | 0.25 | 122.75 | 1.00 | 491.00 | 0.20 | 98.20 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.46 | MILE | 680.00 | 2,352.80 | 350.00 | 1,211.00 | 5,700.00 | 19,722.00 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.691 | MILE | 755.00 | 5,806.71 | 300.00 | 2,307.30 | 1.00 | 7.69 | | 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.174 | MILE | 1,075.00 | 13,087.05 | 500.00 | 6,087.00 | 1,250.00 | 15,217.50 | | 0045 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 23 | EACH | 11.70 | 269.10 | 26.00 | 598.00 | 10.00 | 230.00 | | 0046 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 2 | EACH | 11.70 | 23.40 | 3.00 | 6.00 | 10.00 | 20.00 | | 0047 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 7 | EACH | 11.70 | 81.90 | 55.00 | 385.00 | 10.00 | 70.00 | | 0048 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.783 | MILE | 310.00 | 242.73 | 1,200.00 | 939.60 | 1,500.00 | 1,174.50 | | 0049 | 726-01-00100 | Bedding Material (6" THICK) | 15.1 | CUYD | 100.00 | 1,510.00 | 200.00 | 3,020.00 | 250.00 | 3,775.00 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 306,480.00 | 306,480.00 | 380,000.00 | 380,000.00 | 500,000.00 | 500,000.00 | | 0051 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 150.00 | 2,400.00 | 80.00 | 1,280.00 | 125.00 | 2,000.00 | | 0052 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 200.00 | 400.00 | 100.00 | 200.00 | 150.00 | 300.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,400 | EACH | 7.00 | 16,800.00 | 5.00 | 12,000.00 | 8.00 | 19,200.00 | | 0054 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,701 | LNFT | 3.50 | 9,453.50 | 5.00 | 13,505.00 | 5.00 | 13,505.00 | | 0055 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,008 | LNFT | 16.40 | 16,531.20 | 17.00 | 17,136.00 | 20.00 | 20,160.00 | | 0056 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,177 | LNFT | 3.50 | 4,119.50 | 5.00 | 5,885.00 | 5.00 | 5,885.00 | | 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.987 | MILE | 6,565.00 | 65,564.66 | 6,000.00 | 59,922.00 | 7,500.00 | 74,902.50 | | 0058 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.335 | MILE | 2,500.00 | 13,337.50 | 1,100.00 | 5,868.50 | 3,000.00 | 16,005.00 | | 0059 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 7 | EACH | 580.00 | 4,060.00 | 250.00 | 1,750.00 | 700.00 | 4,900.00 | | 0060 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 38 | EACH | 350.00 | 13,300.00 | 300.00 | 11,400.00 | 450.00 | 17,100.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 350.00 | 2,800.00 | 300.00 | 2,400.00 | 450.00 | 3,600.00 | | 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 380.00 | 2,660.00 | 300.00 | 2,100.00 | 475.00 | 3,325.00 | | 0063 | 732-05-00100 | Removal of Existing Markings | 2.465 | MILE | 11,615.00 | 28,630.98 | 7,000.00 | 17,255.00 | 15,000.00 | 36,975.00 | | 0064 | 735-01-00100 | Mailboxes | 9 | EACH | 29.00 | 261.00 | 30.00 | 270.00 | 10.00 | 90.00 | | 0065 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 235.00 | 2,115.00 | 210.00 | 1,890.00 | 550.00 | 4,950.00 | | 0066 | 739-01-00100 | Hydro-Seeding | 0.97 | ACRE | 3,252.00 | 3,154.44 | 3,000.00 | 2,910.00 | 7,500.00 | 7,275.00 | | 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,600.00 | 16,600.00 | 25,000.00 | 25,000.00 | 500,000.00 | 500,000.00 | | 0068 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 15,993 | SQYD | 10.45 | 167,126.85 | 15.00 | 239,895.00 | 15.00 | 239,895.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,352,455.37 | | 3,863,817.90 | | 5,521,944.13 |
|