Proposal:H.015299.6
Parish:Bienville
Routes:US 371
Description:US 371: RED RIVER P/L - WEBSTER P/L
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$12,931,748.90
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $13,198,301.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 9,026 | CUYD | 44.25 | 399,400.50 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 15 | CUYD | 100.00 | 1,500.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 73,367.3 | TON | 148.75 | 10,913,385.88 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 716.5 | TON | 226.50 | 162,287.25 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 2,185 | SQYD | 7.50 | 16,387.50 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -80 | CUYD | 0.10 | -8.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,034 | SQYD | 137.75 | 280,183.50 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 440,000.00 | 440,000.00 | | 0010 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 22 | LNFT | 0.25 | 5.50 | | 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24.044 | MILE | 300.00 | 7,213.20 | | 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.184 | MILE | 800.00 | 11,347.20 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 77.484 | MILE | 1,100.00 | 85,232.40 | | 0014 | 716-01-00100 | Mulch (Vegetative) | 29 | TON | 900.00 | 26,100.00 | | 0015 | 717-01-00100 | Seeding | 875 | LB | 20.00 | 17,500.00 | | 0016 | 718-01-00100 | Fertilizer | 14,572 | LB | 0.85 | 12,386.20 | | 0017 | 724-01-00100 | Rumble Strips (Centerline) | 12.022 | MILE | 1,000.00 | 12,022.00 | | 0018 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 24.044 | MILE | 1,000.00 | 24,044.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 440,000.00 | 440,000.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,239 | EACH | 7.00 | 15,673.00 | | 0021 | 731-03-00100 | Removal of Raised Pavement Markers | 12.022 | MILE | 1.00 | 12.02 | | 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 18.00 | 396.00 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 38.742 | MILE | 5,950.00 | 230,514.90 | | 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.092 | MILE | 2,975.00 | 21,098.70 | | 0025 | 735-01-00100 | Mailboxes | 108 | EACH | 20.00 | 2,160.00 | | 0026 | 735-02-00100 | Mailbox Supports (Single) | 84 | EACH | 280.00 | 23,520.00 | | 0027 | 735-03-00100 | Mailbox Supports (Double) | 12 | EACH | 370.00 | 4,440.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,500.00 | 50,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,198,301.75 |
|