Proposal:H.014258.6
Parish:West Baton Rouge
Routes:LA 1
Description:LA 1: PORT ALLEN CANAL BR REPL (PH2)(HBI)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF STEEL GIRDER BRIDGE WITH CONCRETE DECK, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE LAYER (TREATED), LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, PRECAST CONCRETE PILES, MECHANICALLY STABILIZED EARTH WALL, COMPOSITE STEEL AND CONCRETE GIRDER BRIDGES, LIGHTING, AND RELATED WORK.
Estimated Construction Cost:$96,084,373.10
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$18,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $115,573,596.84 | 970.00 | $133,033,596.84 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $116,703,255.00 | 1000.00 | $134,703,255.00 |
| 3 | 47347 | Kiewit Louisiana Co. | $130,729,190.73 | 540.00 | $140,449,190.73 |
| 4 | 34567 | James Construction Group LLC | $141,520,179.04 | 984.00 | $159,232,179.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Kiewit Louisiana Co. | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 | 700,000.00 | 700,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 480,000.00 | 480,000.00 | 70,000.00 | 70,000.00 | 34,248.08 | 34,248.08 | 61,425.00 | 61,425.00 | | 0003 | 202-02-00010 | Removal of TEMPORARY PRECAST CONCRETE BARRIER | 304 | EACH | 380.00 | 115,520.00 | 400.00 | 121,600.00 | 157.46 | 47,867.84 | 200.00 | 60,800.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 15,552 | SQYD | 19.00 | 295,488.00 | 17.00 | 264,384.00 | 35.50 | 552,096.00 | 18.00 | 279,936.00 | | 0005 | 202-02-04501 | Removal of Bridge (STR. NO. 61610500708321) 28'x2469' STEEL GIRDER BRIDGE WITH CONCRETE DECK | 69,132 | LUMP | 2,400,000.00 | 2,400,000.00 | 4,500,000.00 | 4,500,000.00 | 3,288,387.50 | 3,288,387.50 | 10,200,000.00 | 10,200,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (STR. NO. 61610500708322) 28'x2469' STEEL GIRDER BRIDGE WITH CONCRETE DECK | 69,132 | LUMP | 2,400,000.00 | 2,400,000.00 | 4,500,000.00 | 4,500,000.00 | 3,288,287.50 | 3,288,287.50 | 10,200,000.00 | 10,200,000.00 | | 0007 | 202-02-06040 | Removal of Concrete Box Headwall (4'X3' STA 18+05 - LEFT LA EFR) | 1 | EACH | 7,300.00 | 7,300.00 | 1,600.00 | 1,600.00 | 829.63 | 829.63 | 8,000.00 | 8,000.00 | | 0008 | 202-02-06040 | Removal of Concrete Box Headwall (4'X3' STA 28+10- LEFT LA EFR) | 1 | EACH | 7,300.00 | 7,300.00 | 1,600.00 | 1,600.00 | 573.37 | 573.37 | 8,000.00 | 8,000.00 | | 0009 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 2,000.00 | 16,000.00 | 1,100.00 | 8,800.00 | 631.23 | 5,049.84 | 3,500.00 | 28,000.00 | | 0010 | 202-02-06100 | Removal of Concrete Walks and Drives | 22 | SQYD | 156.00 | 3,432.00 | 80.00 | 1,760.00 | 154.69 | 3,403.18 | 445.00 | 9,790.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 1,188.8 | LNFT | 11.00 | 13,076.80 | 8.00 | 9,510.40 | 15.09 | 17,938.99 | 7.00 | 8,321.60 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) (15")(RCP) | 282 | LNFT | 45.00 | 12,690.00 | 26.00 | 7,332.00 | 40.51 | 11,423.82 | 25.00 | 7,050.00 | | 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) (18")(RCP) | 107 | LNFT | 60.00 | 6,420.00 | 26.00 | 2,782.00 | 41.01 | 4,388.07 | 25.00 | 2,675.00 | | 0014 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 3,800.00 | 3,800.00 | 1,600.00 | 1,600.00 | 1,024.73 | 1,024.73 | 1,500.00 | 1,500.00 | | 0015 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,699 | SQYD | 20.00 | 153,980.00 | 10.00 | 76,990.00 | 8.22 | 63,285.78 | 20.00 | 153,980.00 | | 0016 | 202-02-38220 | Removal of Sign Supports | 15 | EACH | 150.00 | 2,250.00 | 160.00 | 2,400.00 | 220.66 | 3,309.90 | 150.00 | 2,250.00 | | 0017 | 202-02-38300 | Removal of Sign and U-Channel Post | 12 | EACH | 15.00 | 180.00 | 16.00 | 192.00 | 220.66 | 2,647.92 | 15.00 | 180.00 | | 0018 | 202-02-38360 | Removal of Sign Faces | 15 | EACH | 15.00 | 225.00 | 16.00 | 240.00 | 220.66 | 3,309.90 | 15.00 | 225.00 | | 0019 | 202-02-38380 | Removal of Sign Truss and Footings | 2 | EACH | 9,500.00 | 19,000.00 | 10,000.00 | 20,000.00 | 3,437.89 | 6,875.78 | 9,500.00 | 19,000.00 | | 0020 | 203-01-00100 | General Excavation | 16,313 | CUYD | 36.00 | 587,268.00 | 25.00 | 407,825.00 | 51.46 | 839,466.98 | 30.00 | 489,390.00 | | 0021 | 203-03-00100 | Embankment | 18,051 | CUYD | 66.00 | 1,191,366.00 | 43.00 | 776,193.00 | 89.86 | 1,622,062.86 | 60.00 | 1,083,060.00 | | 0022 | 203-04-00300 | Nonplastic Embankment (Stone) | 337 | CUYD | 206.00 | 69,422.00 | 280.00 | 94,360.00 | 74.60 | 25,140.20 | 300.00 | 101,100.00 | | 0023 | 203-08-00100 | Geotextile Fabric | 3,835.9 | SQYD | 5.00 | 19,179.50 | 6.00 | 23,015.40 | 16.03 | 61,489.48 | 15.00 | 57,538.50 | | 0024 | 204-02-00100 | Temporary Hay Bales | 70 | EACH | 35.00 | 2,450.00 | 40.00 | 2,800.00 | 38.34 | 2,683.80 | 75.00 | 5,250.00 | | 0025 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 150.00 | 1,350.00 | 175.00 | 1,575.00 | 164.31 | 1,478.79 | 392.00 | 3,528.00 | | 0026 | 204-06-00100 | Temporary Silt Fencing | 10,461 | LNFT | 7.00 | 73,227.00 | 2.25 | 23,537.25 | 2.19 | 22,909.59 | 4.00 | 41,844.00 | | 0027 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 11,000.00 | 22,000.00 | 7,800.00 | 15,600.00 | 6,050.00 | 12,100.00 | 9,400.00 | 18,800.00 | | 0028 | 302-02-10060 | Class II Base Course (10" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 16,400.2 | SQYD | 47.00 | 770,809.40 | 52.00 | 852,810.40 | 56.05 | 919,231.21 | 43.00 | 705,208.60 | | 0029 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 8,910.9 | SQYD | 20.00 | 178,218.00 | 25.00 | 222,772.50 | 20.28 | 180,713.05 | 15.00 | 133,663.50 | | 0030 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 8,910.9 | SQYD | 20.00 | 178,218.00 | 20.00 | 178,218.00 | 34.41 | 306,624.07 | 11.00 | 98,019.90 | | 0031 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 25,311.1 | SQYD | 29.00 | 734,021.90 | 30.51 | 772,241.66 | 54.60 | 1,381,986.06 | 23.00 | 582,155.30 | | 0032 | 401-01-00100 | Aggregate Surface Course (Net Section) | 19.6 | CUYD | 412.00 | 8,075.20 | 200.00 | 3,920.00 | 136.74 | 2,680.10 | 980.00 | 19,208.00 | | 0033 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 173.00 | 34,600.00 | 83.00 | 16,600.00 | 133.70 | 26,740.00 | 615.00 | 123,000.00 | | 0034 | 502-01-00100 | Asphalt Concrete | 2,659.7 | TON | 209.00 | 555,877.30 | 220.00 | 585,134.00 | 252.05 | 670,377.39 | 215.00 | 571,835.50 | | 0035 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 13.8 | TON | 850.00 | 11,730.00 | 450.00 | 6,210.00 | 465.53 | 6,424.31 | 850.00 | 11,730.00 | | 0036 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | 10,004 | SQYD | 174.00 | 1,740,696.00 | 160.00 | 1,600,640.00 | 256.60 | 2,567,026.40 | 133.00 | 1,330,532.00 | | 0037 | 601-03-01300 | Portland Cement Concrete Shoulder (11" Thick) | 5,201.2 | SQYD | 175.00 | 910,210.00 | 185.00 | 962,222.00 | 279.77 | 1,455,139.72 | 126.00 | 655,351.20 | | 0038 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 3 | EACH | 350.00 | 1,050.00 | 2,600.00 | 7,800.00 | 259.07 | 777.21 | 532.00 | 1,596.00 | | 0039 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 958 | LNFT | 207.00 | 198,306.00 | 210.00 | 201,180.00 | 278.00 | 266,324.00 | 200.00 | 191,600.00 | | 0040 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 10 | LNFT | 671.00 | 6,710.00 | 260.00 | 2,600.00 | 710.75 | 7,107.50 | 250.00 | 2,500.00 | | 0041 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 10 | LNFT | 905.00 | 9,050.00 | 510.00 | 5,100.00 | 811.35 | 8,113.50 | 500.00 | 5,000.00 | | 0042 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,634.00 | 7,268.00 | 2,600.00 | 5,200.00 | 5,304.87 | 10,609.74 | 2,500.00 | 5,000.00 | | 0043 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 6,610.00 | 105,760.00 | 6,700.00 | 107,200.00 | 11,774.62 | 188,393.92 | 6,500.00 | 104,000.00 | | 0044 | 702-04-00300 | Adjusting Junction Boxes | 5 | EACH | 4,200.00 | 21,000.00 | 7,800.00 | 39,000.00 | 17,944.19 | 89,720.95 | 2,955.00 | 14,775.00 | | 0045 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,578.3 | LNFT | 28.00 | 72,192.40 | 30.00 | 77,349.00 | 34.35 | 88,564.61 | 28.00 | 72,192.40 | | 0046 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 29.7 | LNFT | 140.00 | 4,158.00 | 142.00 | 4,217.40 | 171.75 | 5,100.98 | 140.00 | 4,158.00 | | 0047 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 72.00 | 1,800.00 | 74.00 | 1,850.00 | 88.33 | 2,208.25 | 72.00 | 1,800.00 | | 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 112.00 | 16,800.00 | 114.00 | 17,100.00 | 137.40 | 20,610.00 | 112.00 | 16,800.00 | | 0049 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 5 | EACH | 3,550.00 | 17,750.00 | 3,700.00 | 18,500.00 | 4,355.19 | 21,775.95 | 3,550.00 | 17,750.00 | | 0050 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 107 | LNFT | 200.00 | 21,400.00 | 210.00 | 22,470.00 | 245.36 | 26,253.52 | 200.00 | 21,400.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 27.1 | SQYD | 130.00 | 3,523.00 | 125.00 | 3,387.50 | 184.24 | 4,992.90 | 120.00 | 3,252.00 | | 0052 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 310.1 | SQYD | 100.00 | 31,010.00 | 95.00 | 29,459.50 | 169.83 | 52,664.28 | 90.00 | 27,909.00 | | 0053 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,010.3 | SQYD | 84.00 | 84,865.20 | 115.00 | 116,184.50 | 402.98 | 407,130.69 | 110.00 | 111,133.00 | | 0054 | 711-02-00600 | Riprap (250 lb) | 891 | CUYD | 220.00 | 196,020.00 | 135.00 | 120,285.00 | 185.76 | 165,512.16 | 200.00 | 178,200.00 | | 0055 | 711-04-00100 | Geotextile Fabric | 1,337 | SQYD | 4.50 | 6,016.50 | 5.00 | 6,685.00 | 7.89 | 10,548.93 | 3.50 | 4,679.50 | | 0056 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 614 | SQYD | 90.00 | 55,260.00 | 140.00 | 85,960.00 | 160.84 | 98,755.76 | 135.00 | 82,890.00 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 3,500,000.00 | 3,500,000.00 | 1,500,000.00 | 1,500,000.00 | 850,000.00 | 850,000.00 | | 0058 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 143 | LNFT | 1.00 | 143.00 | 0.20 | 28.60 | 0.19 | 27.17 | 1.00 | 143.00 | | 0059 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 6,641 | LNFT | 1.00 | 6,641.00 | 0.70 | 4,648.70 | 0.81 | 5,379.21 | 1.00 | 6,641.00 | | 0060 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 920 | LNFT | 2.00 | 1,840.00 | 0.80 | 736.00 | 0.93 | 855.60 | 2.00 | 1,840.00 | | 0061 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.573 | MILE | 1,500.00 | 5,359.50 | 530.00 | 1,893.69 | 652.58 | 2,331.67 | 1,500.00 | 5,359.50 | | 0062 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.838 | MILE | 2,500.00 | 24,595.00 | 1,000.00 | 9,838.00 | 1,243.01 | 12,228.73 | 2,500.00 | 24,595.00 | | 0063 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.405 | MILE | 17,500.00 | 24,587.50 | 9,500.00 | 13,347.50 | 11,808.61 | 16,591.10 | 17,563.00 | 24,676.02 | | 0064 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 50.00 | 100.00 | 27.00 | 54.00 | 31.08 | 62.16 | 50.00 | 100.00 | | 0065 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 2 | EACH | 75.00 | 150.00 | 52.00 | 104.00 | 62.15 | 124.30 | 75.00 | 150.00 | | 0066 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 95 | EACH | 15.00 | 1,425.00 | 6.00 | 570.00 | 6.22 | 590.90 | 15.00 | 1,425.00 | | 0067 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 316 | EACH | 4,100.00 | 1,295,600.00 | 800.00 | 252,800.00 | 1,115.41 | 352,469.56 | 1,415.00 | 447,140.00 | | 0068 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 18,000.00 | 36,000.00 | 28,000.00 | 56,000.00 | 24,645.83 | 49,291.66 | 22,500.00 | 45,000.00 | | 0069 | 716-01-00100 | Mulch (Vegetative) | 11.1 | TON | 750.00 | 8,325.00 | 800.00 | 8,880.00 | 821.53 | 9,118.98 | 750.00 | 8,325.00 | | 0070 | 717-01-00100 | Seeding | 223 | LB | 20.00 | 4,460.00 | 22.00 | 4,906.00 | 21.91 | 4,885.93 | 20.00 | 4,460.00 | | 0071 | 718-01-00100 | Fertilizer | 5,567 | LB | 0.65 | 3,618.55 | 0.70 | 3,896.90 | 0.71 | 3,952.57 | 0.65 | 3,618.55 | | 0072 | 718-02-00100 | Agricultural Lime | 11.1 | TON | 350.00 | 3,885.00 | 375.00 | 4,162.50 | 383.38 | 4,255.52 | 350.00 | 3,885.00 | | 0073 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 85,000.00 | 85,000.00 | 250,000.00 | 250,000.00 | 60,245.35 | 60,245.35 | 95,415.00 | 95,415.00 | | 0074 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.111 | MILE | 495.50 | 55.00 | 600.00 | 66.60 | 1,314.44 | 145.90 | 495.00 | 54.95 | | 0075 | 725-01-00100 | Temporary Detour Roads | 1,179.1 | SQYD | 398.00 | 469,281.80 | 200.00 | 235,820.00 | 243.13 | 286,674.58 | 330.00 | 389,103.00 | | 0076 | 726-01-00100 | Bedding Material | 97 | CUYD | 170.00 | 16,490.00 | 130.00 | 12,610.00 | 192.28 | 18,651.16 | 125.00 | 12,125.00 | | 0077 | 727-01-00100 | Mobilization | 1 | LUMP | 11,700,000.00 | 11,700,000.00 | 11,500,000.00 | 11,500,000.00 | 13,000,000.00 | 13,000,000.00 | 14,150,000.00 | 14,150,000.00 | | 0078 | 729-01-00100 | Sign (Type A) | 165.4 | SQFT | 32.50 | 5,375.50 | 35.00 | 5,789.00 | 35.60 | 5,888.24 | 32.50 | 5,375.50 | | 0079 | 729-04-00100 | Sign (Type D) | 264.5 | SQFT | 39.00 | 10,315.50 | 41.00 | 10,844.50 | 42.72 | 11,299.44 | 39.00 | 10,315.50 | | 0080 | 729-06-00100 | Sign (Overhead Mounted) | 545.5 | SQFT | 43.00 | 23,456.50 | 45.00 | 24,547.50 | 47.10 | 25,693.05 | 43.00 | 23,456.50 | | 0081 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 1,560.00 | 6,240.00 | 1,600.00 | 6,400.00 | 1,708.78 | 6,835.12 | 1,560.00 | 6,240.00 | | 0082 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 1 | EACH | 4,000.00 | 4,000.00 | 4,200.00 | 4,200.00 | 4,381.48 | 4,381.48 | 4,000.00 | 4,000.00 | | 0083 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 2,400.00 | 4,800.00 | 2,500.00 | 5,000.00 | 2,628.89 | 5,257.78 | 2,400.00 | 4,800.00 | | 0084 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 2 | EACH | 4,000.00 | 8,000.00 | 4,200.00 | 8,400.00 | 4,381.48 | 8,762.96 | 4,000.00 | 8,000.00 | | 0085 | 729-09-00200 | Mounting (Overhead Truss) (Ground Mounted) (66' Span) | 1 | EACH | 119,360.00 | 119,360.00 | 125,000.00 | 125,000.00 | 130,743.36 | 130,743.36 | 119,360.00 | 119,360.00 | | 0086 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 1 | EACH | 73,235.00 | 73,235.00 | 75,000.00 | 75,000.00 | 80,219.42 | 80,219.42 | 73,235.00 | 73,235.00 | | 0087 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 1 | EACH | 44,000.00 | 44,000.00 | 46,000.00 | 46,000.00 | 49,017.81 | 49,017.81 | 44,750.00 | 44,750.00 | | 0088 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 2 | EACH | 50,650.00 | 101,300.00 | 52,000.00 | 104,000.00 | 55,480.49 | 110,960.98 | 50,650.00 | 101,300.00 | | 0089 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 7 | EACH | 225.00 | 1,575.00 | 230.00 | 1,610.00 | 246.46 | 1,725.22 | 225.00 | 1,575.00 | | 0090 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,544 | EACH | 15.00 | 23,160.00 | 6.00 | 9,264.00 | 6.22 | 9,603.68 | 15.00 | 23,160.00 | | 0091 | 731-02-00100 | Reflectorized Raised Pavement Markers | 867 | EACH | 12.50 | 10,837.50 | 6.00 | 5,202.00 | 6.22 | 5,392.74 | 12.50 | 10,837.50 | | 0092 | 731-03-00100 | Removal of Raised Pavement Markers | 1.116 | MILE | 502.00 | 560.23 | 750.00 | 837.00 | 932.26 | 1,040.40 | 500.00 | 558.00 | | 0093 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,521 | LNFT | 15.00 | 22,815.00 | 16.00 | 24,336.00 | 18.65 | 28,366.65 | 15.00 | 22,815.00 | | 0094 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.456 | MILE | 6,504.00 | 48,493.82 | 4,200.00 | 31,315.20 | 4,972.05 | 37,071.60 | 6,495.00 | 48,426.72 | | 0095 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.206 | MILE | 18,562.00 | 22,385.77 | 12,000.00 | 14,472.00 | 13,673.12 | 16,489.78 | 17,795.00 | 21,460.77 | | 0096 | 732-03-02002 | Plastic Pav't Striping (Broken) (4" Width) (Thermo 90 mil)(Black and White Cont) | 2.929 | MILE | 10,003.00 | 29,298.79 | 12,000.00 | 35,148.00 | 14,294.63 | 41,868.97 | 10,000.00 | 29,290.00 | | 0097 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.117 | MILE | 4,615.00 | 539.96 | 5,000.00 | 585.00 | 6,215.06 | 727.16 | 5,000.00 | 585.00 | | 0098 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.122 | MILE | 9,836.00 | 1,199.99 | 9,000.00 | 1,098.00 | 11,187.10 | 1,364.83 | 11,475.00 | 1,399.95 | | 0099 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 500.00 | 1,000.00 | 300.00 | 600.00 | 366.69 | 733.38 | 500.00 | 1,000.00 | | 0100 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 1,000.00 | 2,000.00 | 510.00 | 1,020.00 | 621.51 | 1,243.02 | 1,000.00 | 2,000.00 | | 0101 | 732-05-00100 | Removal of Existing Markings | 1.355 | MILE | 17,565.00 | 23,800.58 | 1,400.00 | 1,897.00 | 1,640.77 | 2,223.24 | 17,565.00 | 23,800.58 | | 0102 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 | 1,482,530.37 | 1,482,530.37 | 1,219,458.00 | 1,219,458.00 | | 0103 | 802-01-00100 | Structural Excavation (Bents) | 6,973 | CUYD | 38.00 | 264,974.00 | 43.00 | 299,839.00 | 580.29 | 4,046,362.17 | 445.00 | 3,102,985.00 | | 0104 | 802-03-00100 | Temporary Sheeting (Steel) (WALL 1) | 4,862 | SQFT | 54.00 | 262,548.00 | 48.00 | 233,376.00 | 117.56 | 571,576.72 | 65.00 | 316,030.00 | | 0105 | 802-04-00100 | Mechanically Stabilized Earth Wall (LA 1 SB MSE WALL) | 6,613 | SQFT | 98.00 | 648,074.00 | 100.00 | 661,300.00 | 158.82 | 1,050,276.66 | 475.00 | 3,141,175.00 | | 0106 | 802-05-00100 | MSEW Structural Excavation and Backfill | 1 | LUMP | 2,000,000.00 | 2,000,000.00 | 2,000,000.00 | 2,000,000.00 | 856,034.31 | 856,034.31 | 301,980.00 | 301,980.00 | | 0107 | 803-01-00700 | Drilled Shaft (54" Diameter) | 180 | LNFT | 2,967.40 | 534,132.00 | 2,500.00 | 450,000.00 | 3,634.50 | 654,210.00 | 2,370.00 | 426,600.00 | | 0108 | 803-08-00700 | Crosshole Sonic Log Test (54" Diameter) | 6 | EACH | 8,130.00 | 48,780.00 | 3,000.00 | 18,000.00 | 4,299.02 | 25,794.12 | 2,800.00 | 16,800.00 | | 0109 | 804-01-00200 | Precast Concrete Piles (14") | 160 | LNFT | 365.00 | 58,400.00 | 232.00 | 37,120.00 | 170.02 | 27,203.20 | 150.00 | 24,000.00 | | 0110 | 804-01-00400 | Precast Concrete Piles (18") | 80,373 | LNFT | 163.00 | 13,100,799.00 | 142.00 | 11,412,966.00 | 126.91 | 10,200,137.43 | 150.00 | 12,055,950.00 | | 0111 | 804-01-00600 | Precast Concrete Piles (24") | 32,742 | LNFT | 218.00 | 7,137,756.00 | 167.00 | 5,467,914.00 | 157.39 | 5,153,263.38 | 177.00 | 5,795,334.00 | | 0112 | 804-01-00700 | Precast Concrete Piles (30") | 2,280 | LNFT | 342.00 | 779,760.00 | 260.00 | 592,800.00 | 349.35 | 796,518.00 | 298.00 | 679,440.00 | | 0113 | 804-01-00800 | Precast Concrete Piles (36") | 650 | LNFT | 589.00 | 382,850.00 | 400.00 | 260,000.00 | 838.49 | 545,018.50 | 677.00 | 440,050.00 | | 0114 | 804-10-00400 | Precast Concrete Indicator Piles (18") | 4 | EACH | 85,000.00 | 340,000.00 | 150,000.00 | 600,000.00 | 63,101.38 | 252,405.52 | 112,500.00 | 450,000.00 | | 0115 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 4 | EACH | 134,000.00 | 536,000.00 | 150,000.00 | 600,000.00 | 69,322.00 | 277,288.00 | 99,000.00 | 396,000.00 | | 0116 | 804-14-00100 | Dynamic Monitoring Assistance | 66 | EACH | 1,584.00 | 104,544.00 | 8,000.00 | 528,000.00 | 3,833.80 | 253,030.80 | 4,800.00 | 316,800.00 | | 0117 | 804-15-00100 | Dynamic Monitoring Instrumentation | 1 | LUMP | 8,500.00 | 8,500.00 | 100,000.00 | 100,000.00 | 43,814.80 | 43,814.80 | 16,000.00 | 16,000.00 | | 0118 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 68,000.00 | 68,000.00 | 250,000.00 | 250,000.00 | 500,000.00 | 500,000.00 | 68,000.00 | 68,000.00 | | 0119 | 804-18-00100 | Vibration Monitoring | 75 | DAY | 375.00 | 28,125.00 | 1,600.00 | 120,000.00 | 1,807.36 | 135,552.00 | 950.00 | 71,250.00 | | 0120 | 805-01-00200 | Class A1 Concrete (Deck) | 6,411.63 | CUYD | 1,200.00 | 7,693,956.00 | 1,300.00 | 8,335,119.00 | 1,785.99 | 11,451,107.06 | 1,500.00 | 9,617,445.00 | | 0121 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 1,922.22 | CUYD | 1,900.00 | 3,652,218.00 | 2,000.00 | 3,844,440.00 | 3,647.04 | 7,010,413.23 | 2,500.00 | 4,805,550.00 | | 0122 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 1,491.13 | CUYD | 1,900.00 | 2,833,147.00 | 2,800.00 | 4,175,164.00 | 2,717.56 | 4,052,235.24 | 2,100.00 | 3,131,373.00 | | 0123 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 6,019.68 | CUYD | 1,000.00 | 6,019,680.00 | 880.00 | 5,297,318.40 | 914.61 | 5,505,659.52 | 1,000.00 | 6,019,680.00 | | 0124 | 805-08-01600 | Precast-Prestressed Concrete Girders (Type LG-72) | 9,902 | LNFT | 525.00 | 5,198,550.00 | 490.00 | 4,851,980.00 | 659.77 | 6,533,042.54 | 650.00 | 6,436,300.00 | | 0125 | 805-08-01700 | Precast-Prestressed Concrete Girders (Type LG-78) | 5,984 | LNFT | 675.00 | 4,039,200.00 | 650.00 | 3,889,600.00 | 847.57 | 5,071,858.88 | 750.00 | 4,488,000.00 | | 0126 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) (4'X3') | 14.8 | LNFT | 3,485.00 | 51,578.00 | 1,600.00 | 23,680.00 | 1,936.02 | 28,653.10 | 1,500.00 | 22,200.00 | | 0127 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (QUANTITY OF STEEL = 572 LBS, QUANTITY OF CONCRETE = 6.83 CUYD) | 2 | EACH | 1,900.00 | 3,800.00 | 24,000.00 | 48,000.00 | 17,123.80 | 34,247.60 | 20,000.00 | 40,000.00 | | 0128 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 68,485 | SQFT | 1.15 | 78,757.75 | 3.00 | 205,455.00 | 0.11 | 7,533.35 | 2.00 | 136,970.00 | | 0129 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 182,164 | SQFT | 2.35 | 428,085.40 | 3.25 | 592,033.00 | 1.20 | 218,596.80 | 1.00 | 182,164.00 | | 0130 | 806-01-00100 | Deformed Reinforcing Steel | 3,213,298 | LB | 1.50 | 4,819,947.00 | 1.30 | 4,177,287.40 | 1.87 | 6,008,867.26 | 1.50 | 4,819,947.00 | | 0131 | 806-02-00100 | Deformed Reinforcing Steel (Corrosion Resistant) (Stainless Steel) | 20,126 | LB | 1.75 | 35,220.50 | 4.00 | 80,504.00 | 6.32 | 127,196.32 | 6.00 | 120,756.00 | | 0132 | 807-01-00100 | Structural Metalwork (Grade 36) | 1,586 | LUMP | 3,400.00 | 3,400.00 | 15,000.00 | 15,000.00 | 16,591.99 | 16,591.99 | 20,000.00 | 20,000.00 | | 0133 | 807-01-00400 | Structural Metalwork (Grade 50W) | 5,248,681 | LUMP | 17,200,000.00 | 17,200,000.00 | 15,000,000.00 | 15,000,000.00 | 14,864,817.65 | 14,864,817.65 | 20,000,000.00 | 20,000,000.00 | | 0134 | 807-02-00100 | Structural Metalwork (Anchor Bolts) (STAINLESS STEEL) | 4,785 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | 260,886.00 | 260,886.00 | 115,000.00 | 115,000.00 | | 0135 | 807-03-00100 | Structural Metalwork (Access System) | 17,426 | LUMP | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 713,196.08 | 713,196.08 | 1,330,000.00 | 1,330,000.00 | | 0137 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 6,262 | LNFT | 150.00 | 939,300.00 | 165.00 | 1,033,230.00 | 123.01 | 770,288.62 | 130.00 | 814,060.00 | | 0138 | 810-01-00320 | Concrete Bridge Railing (Double Face) (36 inch Height) | 2,344 | LNFT | 180.00 | 421,920.00 | 225.00 | 527,400.00 | 171.24 | 401,386.56 | 240.00 | 562,560.00 | | 0139 | 810-05-00120 | Concrete Roadway Barrier (36 inch Height) | 1,512.9 | LNFT | 390.00 | 590,031.00 | 340.00 | 514,386.00 | 120.73 | 182,652.42 | 550.00 | 832,095.00 | | 0140 | 810-05-00320 | Concrete Roadway Barrier (Double Face) (36 inch Height) | 94.6 | LNFT | 620.00 | 58,652.00 | 350.00 | 33,110.00 | 210.11 | 19,876.41 | 800.00 | 75,680.00 | | 0141 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 5,520 | SQFT | 90.00 | 496,800.00 | 120.00 | 662,400.00 | 126.32 | 697,286.40 | 175.00 | 966,000.00 | | 0142 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,474 | SFIN | 88.00 | 129,712.00 | 100.00 | 147,400.00 | 116.98 | 172,428.52 | 115.00 | 169,510.00 | | 0143 | 814-03-00100 | Bearing Assembly (Disc) | 28 | EACH | 18,000.00 | 504,000.00 | 25,000.00 | 700,000.00 | 19,447.02 | 544,516.56 | 15,000.00 | 420,000.00 | | 0144 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 351 | LNFT | 540.00 | 189,540.00 | 675.00 | 236,925.00 | 845.78 | 296,868.78 | 400.00 | 140,400.00 | | 0145 | 815-02-00300 | Sealed Expansion Joint (Modular) | 140 | LNFT | 4,000.00 | 560,000.00 | 4,400.00 | 616,000.00 | 5,710.88 | 799,523.20 | 4,500.00 | 630,000.00 | | 0146 | 816-01-00100 | Bridge Deck Drainage System (Collection) | 1 | LUMP | 250,000.00 | 250,000.00 | 325,000.00 | 325,000.00 | 376,633.90 | 376,633.90 | 220,000.00 | 220,000.00 | | 0147 | 816-02-00100 | Bridge End Drain System (Open Drain) | 1 | EACH | 18,000.00 | 18,000.00 | 19,000.00 | 19,000.00 | 15,408.54 | 15,408.54 | 25,000.00 | 25,000.00 | | 0148 | 822-01-00100 | Trenching and Backfilling | 3,750 | LNFT | 11.35 | 42,562.50 | 12.00 | 45,000.00 | 12.31 | 46,162.50 | 11.50 | 43,125.00 | | 0149 | 822-02-00100 | Conduit w Conductors (PVC/HDPE) (3/4") (1#4 BARE STRANDED GROUND)(G) | 3,950 | LNFT | 5.15 | 20,342.50 | 6.00 | 23,700.00 | 5.59 | 22,080.50 | 5.00 | 19,750.00 | | 0150 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") ( 2#2, 1#2 BARE STRANDED GROUND) (Q) | 400 | LNFT | 18.21 | 7,284.00 | 19.00 | 7,600.00 | 19.75 | 7,900.00 | 18.00 | 7,200.00 | | 0151 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") ( 2#2/0, 1#2 BARE STRANDED GROUND) (R) | 400 | LNFT | 21.82 | 8,728.00 | 22.00 | 8,800.00 | 23.66 | 9,464.00 | 21.00 | 8,400.00 | | 0152 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") ( 2#4, 1#4 BARE STRANDED GROUND) (N) | 500 | LNFT | 13.16 | 6,580.00 | 14.00 | 7,000.00 | 14.27 | 7,135.00 | 13.00 | 6,500.00 | | 0153 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") ( 2#6, 1#6 BARE STRANDED GROUND) (P) | 200 | LNFT | 10.27 | 2,054.00 | 11.00 | 2,200.00 | 11.14 | 2,228.00 | 10.00 | 2,000.00 | | 0154 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") ( 2#8, 1#8 BARE STRANDED GROUND) (M) | 1,500 | LNFT | 9.33 | 13,995.00 | 10.00 | 15,000.00 | 10.12 | 15,180.00 | 9.00 | 13,500.00 | | 0155 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2#6,2#4, 1#4) (L) | 1,500 | LNFT | 18.21 | 27,315.00 | 19.00 | 28,500.00 | 19.75 | 29,625.00 | 18.00 | 27,000.00 | | 0156 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (3#2/0) (D) | 1,200 | LNFT | 20.10 | 24,120.00 | 20.00 | 24,000.00 | 21.80 | 26,160.00 | 20.00 | 24,000.00 | | 0157 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (SPARE)(E) | 50 | LNFT | 5.59 | 279.50 | 6.00 | 300.00 | 6.06 | 303.00 | 5.50 | 275.00 | | 0158 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2#2, 1#2 GREEN INSUL. GROUND) | 1,200 | LNFT | 56.64 | 67,968.00 | 58.00 | 69,600.00 | 61.42 | 73,704.00 | 56.00 | 67,200.00 | | 0159 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2#2, 2#4, 1#2 BARE STRANDED GROUND) (H) | 150 | LNFT | 61.25 | 9,187.50 | 62.00 | 9,300.00 | 66.42 | 9,963.00 | 61.00 | 9,150.00 | | 0160 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (2#2/0, 1#2 BARE STRANDED GROUND) (S) | 650 | LNFT | 59.48 | 38,662.00 | 60.00 | 39,000.00 | 64.51 | 41,931.50 | 59.00 | 38,350.00 | | 0161 | 822-02-01500 | Conduit w Conductors (Rigid Alum) (2") (4#8, 1#8 BARE STRANDED GROUND) (I) | 150 | LNFT | 52.11 | 7,816.50 | 53.00 | 7,950.00 | 56.51 | 8,476.50 | 52.00 | 7,800.00 | | 0162 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (2#2/0) (F) | 12 | LNFT | 76.57 | 918.84 | 77.00 | 924.00 | 83.03 | 996.36 | 76.00 | 912.00 | | 0163 | 822-02-01700 | Conduit w Conductors (Rigid Alum) (3") (3#2/0) (A) | 40 | LNFT | 83.78 | 3,351.20 | 55.00 | 2,200.00 | 90.85 | 3,634.00 | 83.00 | 3,320.00 | | 0164 | 822-02-03500 | Conduit w Conductors (Liq Tight Flexible Metal) (2") (1#2 GREEN INSUL. GROUND) | 50 | LNFT | 46.43 | 2,321.50 | 46.00 | 2,300.00 | 50.35 | 2,517.50 | 46.00 | 2,300.00 | | 0165 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (2#2, 2#4, 1#2 BARE STRANDED GROUND) (J) | 20 | LNFT | 53.65 | 1,073.00 | 55.00 | 1,100.00 | 58.18 | 1,163.60 | 54.00 | 1,080.00 | | 0166 | 822-02-04500 | Conduit w Conductors (Fiberglass) (2") (2#8, 1#8 BARE STRANDED GROUND) (K) | 10 | LNFT | 53.65 | 536.50 | 55.00 | 550.00 | 58.18 | 581.80 | 54.00 | 540.00 | | 0167 | 822-02-04700 | Conduit w Conductors (Fiberglass) (3") (3#2/0) (B) | 20 | LNFT | 68.08 | 1,361.60 | 70.00 | 1,400.00 | 73.83 | 1,476.60 | 68.00 | 1,360.00 | | 0168 | 822-02-04700 | Conduit w Conductors (Fiberglass) (3") (SPARE) (C) | 40 | LNFT | 68.08 | 2,723.20 | 70.00 | 2,800.00 | 73.83 | 2,953.20 | 68.00 | 2,720.00 | | 0169 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 150 | LNFT | 61.24 | 9,186.00 | 62.00 | 9,300.00 | 66.41 | 9,961.50 | 61.00 | 9,150.00 | | 0170 | 822-06-01800 | High Mast Pole (150') (6 Luminaire) (STEEL, INTERNAL LOWER. DEVICE, CONC. MOWING
APRON; LESS DRILL SHAFT. SEE PAY ITEM 803-01-00700 & 803-08-00700) | 5 | EACH | 85,493.80 | 427,469.00 | 85,000.00 | 425,000.00 | 92,710.87 | 463,554.35 | 84,700.00 | 423,500.00 | | 0171 | 822-06-01900 | High Mast Pole (150') (8 Luminaire) (STEEL, INTERNAL LOWER. DEVICE, CONC. MOWING
APRON; LESS DRILL SHAFT. SEE PAY ITEM 803-01-00700 & 803-08-00700) | 1 | EACH | 89,822.80 | 89,822.80 | 90,000.00 | 90,000.00 | 97,405.31 | 97,405.31 | 88,925.00 | 88,925.00 | | 0172 | 822-07-02500 | Luminaire (1000 Watt) (High Pressure Sodium) (HIGH MAST, 480V, NON-CUTOFF, IES TYPE VS, BUG RATING:
B5-U0-G5, DBL. FUSE, UL LISTED, ALUM. HOUS., W/ LAMP) | 38 | EACH | 2,227.54 | 84,646.52 | 2,300.00 | 87,400.00 | 2,415.58 | 91,792.04 | 2,206.00 | 83,828.00 | | 0173 | 822-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 37,724.68 | 37,724.68 | 40,000.00 | 40,000.00 | 40,909.25 | 40,909.25 | 37,348.00 | 37,348.00 | | 0174 | 822-09-00100 | Electrical System | 1 | LUMP | 114,920.27 | 114,920.27 | 135,000.00 | 135,000.00 | 124,621.42 | 124,621.42 | 113,771.00 | 113,771.00 | | 0175 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 15,848.78 | 15,848.78 | 20,000.00 | 20,000.00 | 17,186.67 | 17,186.67 | 15,691.00 | 15,691.00 | | 0176 | 822-11-00100 | Removal and Disposal of Electrical Equipment (STORAGE OF ELECTRICAL EQUIPMENT) | 1 | LUMP | 8,285.14 | 8,285.14 | 10,000.00 | 10,000.00 | 8,984.54 | 8,984.54 | 8,203.00 | 8,203.00 | | 0177 | 822-12-00100 | Removal and Storage of Light Pole (Ground Mount) (GROUND MOUNT) | 2 | EACH | 7,284.74 | 14,569.48 | 8,000.00 | 16,000.00 | 7,899.69 | 15,799.38 | 7,212.00 | 14,424.00 | | 0178 | 822-13-00100 | Removal and Disposal of Light Pole Foundation (GROUND MOUNT) | 2 | EACH | 2,668.75 | 5,337.50 | 3,000.00 | 6,000.00 | 2,894.03 | 5,788.06 | 2,642.00 | 5,284.00 | | 0179 | 822-14-00100 | Removal and Disposal of Luminaire | 12 | EACH | 70.24 | 842.88 | 75.00 | 900.00 | 76.17 | 914.04 | 70.00 | 840.00 | | 0180 | 822-16-00200 | Underground Junction Box (11" x 18") (JB1) | 1 | EACH | 1,276.25 | 1,276.25 | 1,300.00 | 1,300.00 | 1,383.99 | 1,383.99 | 1,264.00 | 1,264.00 | | 0181 | 822-16-00300 | Underground Junction Box (13" x 24") (JB2) | 3 | EACH | 1,438.38 | 4,315.14 | 1,600.00 | 4,800.00 | 1,559.81 | 4,679.43 | 1,424.00 | 4,272.00 | | 0182 | 822-16-00400 | Underground Junction Box (17"X30") (JB3) | 14 | EACH | 1,589.90 | 22,258.60 | 1,700.00 | 23,800.00 | 1,724.11 | 24,137.54 | 1,574.00 | 22,036.00 | | 0183 | 822-17-00400 | Structure Junction Box (Stainless Steel) (10" X 8" X 4") (JBS) | 6 | EACH | 1,323.34 | 7,940.04 | 1,500.00 | 9,000.00 | 1,435.06 | 8,610.36 | 1,310.00 | 7,860.00 | | 0184 | 822-20-00100 | Disconnect (Service) (NON-FUSED, HEAVY DUTY, 3P, 600V, 200 A, NEMA 4X, TYPE 316 S.S.
ENCLOSURE) | 1 | EACH | 8,188.63 | 8,188.63 | 9,000.00 | 9,000.00 | 8,879.88 | 8,879.88 | 8,107.00 | 8,107.00 | | 0185 | 822-21-00100 | Duct Marker (Concrete) | 1 | EACH | 5,000.00 | 5,000.00 | 400.00 | 400.00 | 602.45 | 602.45 | 1,028.00 | 1,028.00 | | 0186 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 3,750 | LNFT | 0.82 | 3,075.00 | 1.00 | 3,750.00 | 0.89 | 3,337.50 | 1.00 | 3,750.00 | | 0187 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,556 | INLF | 0.65 | 2,311.40 | 1.20 | 4,267.20 | 1.10 | 3,911.60 | 1.00 | 3,556.00 | | 0188 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,039 | INLF | 0.95 | 1,937.05 | 1.20 | 2,446.80 | 2.00 | 4,078.00 | 1.00 | 2,039.00 | | 0189 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 5 | EACH | 9,000.00 | 45,000.00 | 12,000.00 | 60,000.00 | 9,858.33 | 49,291.65 | 9,000.00 | 45,000.00 | | 0190 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | 2,738.43 | 5,476.86 | 2,500.00 | 5,000.00 | | 0191 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 37,250.00 | 37,250.00 | 45,000.00 | 45,000.00 | 40,802.53 | 40,802.53 | 37,250.00 | 37,250.00 | | 0192 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 3 | EACH | 950.00 | 2,850.00 | 1,000.00 | 3,000.00 | 492.92 | 1,478.76 | 750.00 | 2,250.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 115,573,596.84 | | 116,703,255.00 | | 130,729,190.73 | | 141,520,179.04 |
|