Proposal:H.015366.6
Parish:Washington
Routes:LA 1055
Description:LA 1055: LA 38 - 200' E OF SILVER CREEK
Type Construction:MILLING ASPHALT CONCRETE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,807,054.40
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,334,695.01 |
| 2 | 73475 | Madden Gulf Coast, LLC | $1,778,341.17 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of Aggregate Driveway | 50 | SQYD | 29.00 | 1,450.00 | 20.00 | 1,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 43.4 | SQYD | 34.00 | 1,475.60 | 32.00 | 1,388.80 | | 0003 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 43.4 | SQYD | 34.00 | 1,475.60 | 32.00 | 1,388.80 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,132 | LNFT | 10.25 | 11,603.00 | 20.00 | 22,640.00 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 10.25 | 82.00 | 20.00 | 160.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,025 | CUYD | 5.00 | 15,125.00 | 45.00 | 136,125.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 16,746 | LNFT | 1.00 | 16,746.00 | 1.88 | 31,482.48 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 22,555.6 | SQYD | 12.00 | 270,667.20 | 15.00 | 338,334.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 4,953.7 | TON | 107.00 | 530,045.90 | 125.00 | 619,212.50 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 388.1 | TON | 230.00 | 89,263.00 | 310.00 | 120,311.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 859 | SQYD | 12.75 | 10,952.25 | 15.00 | 12,885.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -47 | CUYD | 0.01 | -0.47 | 0.01 | -0.47 | | 0013 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 814 | LNFT | 76.00 | 61,864.00 | 75.00 | 61,050.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 250.1 | LNFT | 40.00 | 10,004.00 | 40.00 | 10,004.00 | | 0015 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 3 | EACH | 4,500.00 | 13,500.00 | 5,500.00 | 16,500.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 5 | EACH | 5,000.00 | 25,000.00 | 6,500.00 | 32,500.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 109,000.00 | 109,000.00 | 100,000.00 | 100,000.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 0.55 | 39.60 | 0.50 | 36.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.77 | MILE | 325.00 | 1,550.25 | 350.00 | 1,669.50 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.855 | MILE | 0.01 | 0.01 | 600.00 | 513.00 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.5 | MILE | 0.01 | 0.08 | 800.00 | 6,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 2,550.00 | 1,020.00 | 6,885.00 | 2,754.00 | | 0023 | 717-01-00100 | Seeding | 6 | LB | 25.60 | 153.60 | 40.16 | 240.96 | | 0024 | 718-01-00100 | Fertilizer | 200 | LB | 2.25 | 450.00 | 2.24 | 448.00 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.18 | MILE | 275.00 | 874.50 | 1,400.00 | 4,452.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 175,000.00 | 175,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 205.00 | 1,640.00 | 200.00 | 1,600.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,056 | EACH | 4.60 | 4,857.60 | 4.50 | 4,752.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 25.60 | 614.40 | 25.00 | 600.00 | | 0030 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 170 | LNFT | 4.00 | 680.00 | 4.00 | 680.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.5 | MILE | 4,500.00 | 11,250.00 | 4,400.00 | 11,000.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.29 | MILE | 1,500.00 | 435.00 | 1,500.00 | 435.00 | | 0033 | 735-01-00100 | Mailboxes | 30 | EACH | 25.00 | 750.00 | 50.00 | 1,500.00 | | 0034 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 25.00 | 750.00 | 250.00 | 7,500.00 | | 0035 | 739-01-00100 | Hydro-Seeding | 0.76 | ACRE | 3,125.00 | 2,375.00 | 5,126.45 | 3,896.10 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,000.00 | 19,000.00 | 50,000.00 | 50,000.00 | | 0037 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 189 | INLF | 0.01 | 1.89 | 1.50 | 283.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,334,695.01 | | 1,778,341.17 |
|