Proposal:H.015286.6
Parish:Calcasieu
Routes:LA 397
Description:LA 397: GAYLE RD - LA 27
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, HOT-MIX ASPHALT AGGREGATE SURFACE COURSE, AND RELATED WORK.
Estimated Construction Cost:$3,498,611.26
| Rank | License | Bidder | Construction Bid |
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $3,262,706.33 |
| 2 | 34356 | Prairie Contractors LLC | $3,265,870.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R. E. Heidt Construction Co., LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Catch Basin Yard Drain | 1 | EACH | 1,464.50 | 1,464.50 | 757.50 | 757.50 | | 0002 | 202-02-00030 | Removal of RETAINING STRUCTURE | 25.8 | LNFT | 95.95 | 2,475.51 | 328.25 | 8,468.85 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 260.05 | SQYD | 30.30 | 7,879.52 | 32.00 | 8,321.60 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 208 | SQYD | 30.30 | 6,302.40 | 32.00 | 6,656.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 246.9 | LNFT | 14.65 | 3,617.09 | 14.65 | 3,617.09 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP | 40 | LNFT | 70.70 | 2,828.00 | 18.18 | 727.20 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 196.6 | LNFT | 70.70 | 13,899.62 | 18.18 | 3,574.19 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMP | 40 | LNFT | 70.70 | 2,828.00 | 18.18 | 727.20 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | 54.9 | LNFT | 70.70 | 3,881.43 | 18.18 | 998.08 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 151.50 | 3,939.00 | 151.50 | 3,939.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,242.25 | LNFT | 2.02 | 2,509.35 | 3.54 | 4,397.57 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 189.1 | CUYD | 230.00 | 43,493.00 | 175.00 | 33,092.50 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 72.2 | CUYD | 187.00 | 13,501.40 | 125.00 | 9,025.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 10,564.8 | TON | 119.00 | 1,257,211.20 | 116.00 | 1,225,516.80 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,070.4 | TON | 135.00 | 144,504.00 | 85.00 | 90,984.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 55,690 | SQYD | 3.55 | 197,699.50 | 2.65 | 147,578.50 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,060 | CUYD | 0.01 | -20.60 | 0.01 | -20.60 | | 0018 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 2,767 | SQYD | 138.00 | 381,846.00 | 170.00 | 470,390.00 | | 0019 | 510-02-00100 | Pavement Widening Avg. Depth 12" | 281.5 | SQYD | 105.00 | 29,557.50 | 160.00 | 45,040.00 | | 0020 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 287.5 | LNFT | 292.90 | 84,208.75 | 267.65 | 76,949.38 | | 0021 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 404.00 | 16,160.00 | 321.18 | 12,847.20 | | 0022 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 256 | LNFT | 232.30 | 59,468.80 | 267.65 | 68,518.40 | | 0023 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 36 | LNFT | 247.45 | 8,908.20 | 232.30 | 8,362.80 | | 0024 | 702-02-00100 | Manholes (MH-06) | 4 | EACH | 12,524.00 | 50,096.00 | 6,716.50 | 26,866.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 9,342.50 | 9,342.50 | 6,161.00 | 6,161.00 | | 0026 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 12,372.50 | 24,745.00 | 7,393.20 | 14,786.40 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 35.35 | 883.75 | 35.35 | 883.75 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 133.83 | 13,383.00 | 133.83 | 13,383.00 | | 0029 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,545.00 | 4,545.00 | 4,545.00 | 4,545.00 | | 0030 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,737.00 | 11,211.00 | 3,737.00 | 11,211.00 | | 0031 | 707-01-00100 | Concrete Curb | 14 | LNFT | 159.58 | 2,234.12 | 79.79 | 1,117.06 | | 0032 | 710-01-00100 | Flowable Fill | 238.7 | CUYD | 277.75 | 66,298.93 | 237.35 | 56,655.45 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 82,000.00 | 82,000.00 | 200,000.00 | 200,000.00 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 0.51 | 18.36 | 0.01 | 0.36 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.751 | MILE | 500.00 | 5,875.50 | 750.00 | 8,813.25 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.712 | MILE | 656.50 | 7,688.93 | 0.01 | 0.12 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.389 | MILE | 1,161.50 | 29,489.32 | 0.01 | 0.25 | | 0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.06 | MILE | 1,010.00 | 60.60 | 200,000.00 | 12,000.00 | | 0039 | 726-01-00100 | Bedding Material | 76.6 | CUYD | 202.00 | 15,473.20 | 126.25 | 9,670.75 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 234,000.00 | 234,000.00 | 250,000.00 | 250,000.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 75.75 | 1,212.00 | 75.75 | 1,212.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 126.25 | 505.00 | 126.25 | 505.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 516 | EACH | 7.07 | 3,648.12 | 7.07 | 3,648.12 | | 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 18.69 | 224.28 | 18.69 | 224.28 | | 0045 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 225 | LNFT | 3.54 | 796.50 | 3.54 | 796.50 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.463 | MILE | 6,161.00 | 52,140.54 | 6,161.00 | 52,140.54 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.904 | MILE | 3,257.25 | 12,716.30 | 3,257.25 | 12,716.30 | | 0048 | 735-01-00100 | Mailboxes | 19 | EACH | 1.01 | 19.19 | 1.01 | 19.19 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 353.50 | 6,716.50 | 353.50 | 6,716.50 | | 0050 | 739-01-00100 | Hydro-Seeding | 0.26 | ACRE | 5,050.00 | 1,313.00 | 12,120.00 | 3,151.20 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,500.00 | 8,500.00 | 100.00 | 100.00 | | 0052 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 2,623.9 | TON | 115.00 | 301,748.50 | 119.00 | 312,244.10 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 607.81 | INLF | 4.50 | 2,735.15 | 1.50 | 911.72 | | 0054 | NS-DEV-72401 | S-wave Ground Inlay Grooves (Centerline) | 3.917 | MILE | 2,121.00 | 8,307.96 | 2,121.00 | 8,307.96 | | 0055 | NS-DEV-72402 | S-wave Ground Inlay Grooves (Shoulder/Edge)) | 7.834 | MILE | 2,121.00 | 16,615.91 | 2,121.00 | 16,615.91 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,262,706.33 | | 3,265,870.97 |
|