Proposal:H.014798.6
Parish:Concordia
Routes:LA 565
Description:LA 565: LA 129 - LA 15
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT SURFACE TREATMENT, MULTIAXIAL GEOGRID, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,555,847.50
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $8,589,008.25 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $8,872,847.75 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $9,312,674.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06040 | Removal of Concrete Box Headwall 40'x9'x1' | 1 | EACH | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 752 | LNFT | 25.00 | 18,800.00 | 8.00 | 6,016.00 | 15.00 | 11,280.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP, 24" RCP | 12 | LNFT | 20.00 | 240.00 | 60.00 | 720.00 | 55.00 | 660.00 | | 0004 | 203-01-00100 | General Excavation | 110 | CUYD | 55.00 | 6,050.00 | 100.00 | 11,000.00 | 155.00 | 17,050.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 67 | CUYD | 70.00 | 4,690.00 | 80.00 | 5,360.00 | 80.00 | 5,360.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 320 | LNFT | 6.00 | 1,920.00 | 6.00 | 1,920.00 | 10.00 | 3,200.00 | | 0007 | 302-01-00300 | Class II Base Course (Crushed Stone) | 256.1 | CUYD | 250.00 | 64,025.00 | 230.00 | 58,903.00 | 220.00 | 56,342.00 | | 0008 | 302-02-06020 | Class II Base Course (6" Thick) (Crushed Stone) | 65,741.6 | SQYD | 38.00 | 2,498,180.80 | 37.00 | 2,432,439.20 | 32.50 | 2,136,602.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9,743 | CUYD | 45.00 | 438,435.00 | 73.00 | 711,239.00 | 165.00 | 1,607,595.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 16,911 | TON | 160.00 | 2,705,760.00 | 150.00 | 2,536,650.00 | 150.00 | 2,536,650.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,367.4 | TON | 160.00 | 218,784.00 | 220.00 | 300,828.00 | 241.00 | 329,543.40 | | 0012 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 10,606 | GAL | 4.50 | 47,727.00 | 4.30 | 45,605.80 | 5.00 | 53,030.00 | | 0013 | 507-02-00300 | Aggregate (S3) | 34,209 | SQYD | 2.25 | 76,970.25 | 2.00 | 68,418.00 | 2.00 | 68,418.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 98,457 | SQYD | 8.50 | 836,884.50 | 6.00 | 590,742.00 | 7.00 | 689,199.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,296 | CUYD | 1.00 | -6,296.00 | 1.00 | -6,296.00 | 1.00 | -6,296.00 | | 0016 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 275 | SQYD | 280.00 | 77,000.00 | 240.00 | 66,000.00 | 250.00 | 68,750.00 | | 0017 | 701-01-01100 | Cross Drain Pipe (54" RCP) | 88 | LNFT | 850.00 | 74,800.00 | 825.00 | 72,600.00 | 620.00 | 54,560.00 | | 0018 | 701-08-00100 | Relaying Pipe 54" RCP, 48" RCP, 24" RCP | 32 | LNFT | 350.00 | 11,200.00 | 300.00 | 9,600.00 | 295.00 | 9,440.00 | | 0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 225.00 | 1,800.00 | 1,300.00 | 10,400.00 | 315.00 | 2,520.00 | | 0020 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 275.00 | 2,200.00 | 1,350.00 | 10,800.00 | 345.00 | 2,760.00 | | 0021 | 701-15-00100 | Concrete Collar | 6 | EACH | 1,800.00 | 10,800.00 | 3,100.00 | 18,600.00 | 2,800.00 | 16,800.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 88 | LNFT | 6.00 | 528.00 | 1.00 | 88.00 | 15.00 | 1,320.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 325 | LNFT | 36.00 | 11,700.00 | 35.00 | 11,375.00 | 35.00 | 11,375.00 | | 0024 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 120.00 | 12,000.00 | 85.00 | 8,500.00 | 95.00 | 9,500.00 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 140.00 | 28,000.00 | 122.00 | 24,400.00 | 135.00 | 27,000.00 | | 0026 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 4,600.00 | 36,800.00 | 3,700.00 | 29,600.00 | 3,700.00 | 29,600.00 | | 0027 | 707-01-00100 | Concrete Curb | 54 | LNFT | 80.00 | 4,320.00 | 200.00 | 10,800.00 | 95.00 | 5,130.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 168,000.00 | 168,000.00 | 100,000.00 | 100,000.00 | 133,000.00 | 133,000.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 22.505 | MILE | 250.00 | 5,626.25 | 250.00 | 5,626.25 | 154.00 | 3,465.77 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 20.545 | MILE | 250.00 | 5,136.25 | 600.00 | 12,327.00 | 700.00 | 14,381.50 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 52.234 | MILE | 300.00 | 15,670.20 | 1,100.00 | 57,457.40 | 950.00 | 49,622.30 | | 0032 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,250 | EACH | 3.00 | 6,750.00 | 2.50 | 5,625.00 | 3.00 | 6,750.00 | | 0033 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | 4,200.00 | 4,200.00 | | 0034 | 726-01-00100 | Bedding Material | 78.5 | CUYD | 135.00 | 10,597.50 | 225.00 | 17,662.50 | 210.00 | 16,485.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 425,000.00 | 425,000.00 | 870,000.00 | 870,000.00 | 650,000.00 | 650,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 125.00 | 1,750.00 | 120.00 | 1,680.00 | 115.00 | 1,610.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 100.00 | 800.00 | 130.00 | 1,040.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,217 | EACH | 8.00 | 9,736.00 | 9.00 | 10,953.00 | 5.00 | 6,085.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.629 | MILE | 6,000.00 | 117,774.00 | 6,400.00 | 125,625.60 | 4,500.00 | 88,330.50 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.757 | MILE | 1,500.00 | 11,635.50 | 3,200.00 | 24,822.40 | 1,200.00 | 9,308.40 | | 0041 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.106 | MILE | 6,500.00 | 689.00 | 5,600.00 | 593.60 | 6,200.00 | 657.20 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.102 | MILE | 16,000.00 | 1,632.00 | 14,000.00 | 1,428.00 | 13,000.00 | 1,326.00 | | 0043 | 735-01-00100 | Mailboxes | 22 | EACH | 40.00 | 880.00 | 25.00 | 550.00 | 35.00 | 770.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 325.00 | 3,900.00 | 255.00 | 3,060.00 | 250.00 | 3,000.00 | | 0045 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 400.00 | 2,000.00 | 355.00 | 1,775.00 | 350.00 | 1,750.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 0.13 | ACRE | 10,000.00 | 1,300.00 | 20,000.00 | 2,600.00 | 25,000.00 | 3,250.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0048 | 805-16-01700 | Reinforced Concrete Box Culverts (Extension) (7' x 7') | 32 | LNFT | 3,200.00 | 102,400.00 | 3,600.00 | 115,200.00 | 4,000.00 | 128,000.00 | | 0049 | TS-300-00100 | Multiaxial Geogrid | 67,459 | SQYD | 7.00 | 472,213.00 | 6.00 | 404,754.00 | 6.00 | 404,754.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,589,008.25 | | 8,872,847.75 | | 9,312,674.07 |
|