Proposal:H.014766.6
Parish:St. Landry
Routes:LA 10
Description:LA 10: LITTLE WAUKSHA BR - US 71
Type Construction:BORROW, CROSS DRAIN PIPE ARCH, PRECAST CONCRETE BOX CULVERTS, REMOVAL OF ASPHALT, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,046,611.29
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,034,157.64 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $5,248,603.05 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $5,784,349.42 |
| 4 | 06276 | Barriere Construction Co., LLC | $6,060,044.92 |
| 5 | 33663 | Glenn Lege Construction LLC | $6,473,013.26 |
| 6 | 51821 | Elliott Construction, LLC | $6,613,637.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Corrugated Structural Plate Cross Drain Arch(18' x 10') | 84 | LNFT | 100.00 | 8,400.00 | 180.00 | 15,120.00 | 175.00 | 14,700.00 | 74.00 | 6,216.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,935.7 | SQYD | 15.00 | 29,035.50 | 25.00 | 48,392.50 | 21.00 | 40,649.70 | 2.00 | 3,871.40 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 32,347 | SQYD | 2.50 | 80,867.50 | 3.25 | 105,127.75 | 1.45 | 46,903.15 | 4.00 | 129,388.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 151.1 | SQYD | 40.00 | 6,044.00 | 45.00 | 6,799.50 | 80.00 | 12,088.00 | 40.00 | 6,044.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 644 | LNFT | 17.00 | 10,948.00 | 8.00 | 5,152.00 | 15.00 | 9,660.00 | 8.00 | 5,152.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" x 58" CMPA | 69 | LNFT | 55.00 | 3,795.00 | 30.00 | 2,070.00 | 45.00 | 3,105.00 | 45.00 | 3,105.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 7,631 | CUYD | 32.00 | 244,192.00 | 20.00 | 152,620.00 | 25.00 | 190,775.00 | 52.00 | 396,812.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 175.00 | 8,750.00 | 175.00 | 8,750.00 | 155.00 | 7,750.00 | 150.00 | 7,500.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,556 | LNFT | 2.35 | 3,656.60 | 2.00 | 3,112.00 | 2.00 | 3,112.00 | 2.00 | 3,112.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,594 | CUYD | 55.00 | 197,670.00 | 32.00 | 115,008.00 | 80.00 | 287,520.00 | 50.00 | 179,700.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 80.00 | 4,000.00 | 60.00 | 3,000.00 | 55.00 | 2,750.00 | 60.00 | 3,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 17,170.8 | TON | 111.00 | 1,905,958.80 | 129.00 | 2,215,033.20 | 130.00 | 2,232,204.00 | 138.00 | 2,369,570.40 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 933.8 | TON | 85.00 | 79,373.00 | 240.00 | 224,112.00 | 225.00 | 210,105.00 | 292.00 | 272,669.60 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 77,834 | SQYD | 2.30 | 179,018.20 | 2.25 | 175,126.50 | 2.55 | 198,476.70 | 2.25 | 175,126.50 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,298 | CUYD | 0.01 | -32.98 | 1.00 | -3,298.00 | 1.00 | -3,298.00 | 0.01 | -32.98 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,040 | SQYD | 144.00 | 725,760.00 | 180.00 | 907,200.00 | 160.00 | 806,400.00 | 159.00 | 801,360.00 | | 0017 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 69 | LNFT | 500.00 | 34,500.00 | 560.00 | 38,640.00 | 600.00 | 41,400.00 | 414.00 | 28,566.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 153 | LNFT | 35.00 | 5,355.00 | 50.00 | 7,650.00 | 10.00 | 1,530.00 | 27.00 | 4,131.00 | | 0019 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 640 | LNFT | 110.00 | 70,400.00 | 49.00 | 31,360.00 | 95.00 | 60,800.00 | 48.00 | 30,720.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 400 | LNFT | 40.00 | 16,000.00 | 32.00 | 12,800.00 | 35.00 | 14,000.00 | 30.00 | 12,000.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 150.00 | 30,000.00 | 120.00 | 24,000.00 | 135.00 | 27,000.00 | 117.00 | 23,400.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,750.00 | 19,000.00 | 3,800.00 | 15,200.00 | 4,200.00 | 16,800.00 | 3,685.00 | 14,740.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,000.00 | 16,000.00 | 3,400.00 | 13,600.00 | 3,900.00 | 15,600.00 | 3,225.00 | 12,900.00 | | 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 151.1 | SQYD | 200.00 | 30,220.00 | 160.00 | 24,176.00 | 135.00 | 20,398.50 | 130.00 | 19,643.00 | | 0025 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 100.00 | 10,800.00 | 75.00 | 8,100.00 | 15.00 | 1,620.00 | 147.00 | 15,876.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 105,000.00 | 105,000.00 | 75,000.00 | 75,000.00 | 157,000.00 | 157,000.00 | 460,000.00 | 460,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.118 | MILE | 700.00 | 9,882.60 | 250.00 | 3,529.50 | 154.00 | 2,174.17 | 172.00 | 2,428.30 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.396 | MILE | 1.00 | 12.40 | 750.00 | 9,297.00 | 550.00 | 6,817.80 | 750.00 | 9,297.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 34.821 | MILE | 1.00 | 34.82 | 1,000.00 | 34,821.00 | 1,100.00 | 38,303.10 | 1,000.00 | 34,821.00 | | 0030 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 15,000.00 | 30,000.00 | 20,000.00 | 40,000.00 | 8,000.00 | 16,000.00 | 15,550.00 | 31,100.00 | | 0031 | 724-01-00100 | Rumble Strips (Centerline) | 4.63 | MILE | 1,200.00 | 5,556.00 | 1,000.00 | 4,630.00 | 1,100.00 | 5,093.00 | 5,000.00 | 23,150.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.261 | MILE | 1,200.00 | 11,113.20 | 1,000.00 | 9,261.00 | 1,000.00 | 9,261.00 | 300.00 | 2,778.30 | | 0033 | 726-01-00100 | Bedding Material | 67.4 | CUYD | 180.00 | 12,132.00 | 150.00 | 10,110.00 | 120.00 | 8,088.00 | 146.00 | 9,840.40 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 312,000.00 | 312,000.00 | 470,000.00 | 470,000.00 | 365,500.00 | 365,500.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 130.00 | 2,600.00 | 80.00 | 1,600.00 | 112.00 | 2,240.00 | 75.00 | 1,500.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 140.00 | 2,240.00 | 80.00 | 1,280.00 | 125.00 | 2,000.00 | 75.00 | 1,200.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 703 | EACH | 10.00 | 7,030.00 | 9.00 | 6,327.00 | 8.00 | 5,624.00 | 8.00 | 5,624.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.607 | MILE | 7,000.00 | 81,249.00 | 4,200.00 | 48,749.40 | 5,900.00 | 68,481.30 | 4,000.00 | 46,428.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.132 | MILE | 3,500.00 | 14,462.00 | 1,350.00 | 5,578.20 | 3,000.00 | 12,396.00 | 1,250.00 | 5,165.00 | | 0040 | 735-01-00100 | Mailboxes | 33 | EACH | 30.00 | 990.00 | 26.00 | 858.00 | 25.00 | 825.00 | 20.00 | 660.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 295.00 | 9,735.00 | 275.00 | 9,075.00 | 250.00 | 8,250.00 | 250.00 | 8,250.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.25 | ACRE | 3,000.00 | 6,750.00 | 2,750.00 | 6,187.50 | 2,500.00 | 5,625.00 | 2,500.00 | 5,625.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 21,000.00 | 21,000.00 | 28,000.00 | 28,000.00 | 16,000.00 | 16,000.00 | | 0044 | 805-15-02400 | Reinforced Concrete Box Culverts (Precast) (9' x 9') | 168 | LNFT | 2,150.00 | 361,200.00 | 1,800.00 | 302,400.00 | 2,800.00 | 470,400.00 | 2,025.00 | 340,200.00 | | 0045 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Straight Headwall
Concrete Qty. - 50.926 CuYd
Steel Qty. - 3,816.08 lbs | 2 | EACH | 75,000.00 | 150,000.00 | 77,500.00 | 155,000.00 | 72,000.00 | 144,000.00 | 64,000.00 | 128,000.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) Bridge Joints | 972 | LNFT | 45.00 | 43,740.00 | 18.00 | 17,496.00 | 51.00 | 49,572.00 | 35.00 | 34,020.00 | | 0047 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 320 | LNFT | 10.00 | 3,200.00 | 16.00 | 5,120.00 | 12.50 | 4,000.00 | 4.00 | 1,280.00 | | 0048 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 652 | LNFT | 10.00 | 6,520.00 | 16.00 | 10,432.00 | 12.50 | 8,150.00 | 4.00 | 2,608.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,034,157.64 | | 5,248,603.05 | | 5,784,349.42 | | 6,060,044.92 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Glenn Lege Construction LLC | - 6 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of Corrugated Structural Plate Cross Drain Arch(18' x 10') | 84 | LNFT | 105.50 | 8,862.00 | 85.00 | 7,140.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,935.7 | SQYD | 34.50 | 66,781.65 | 15.00 | 29,035.50 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 32,347 | SQYD | 1.90 | 61,459.30 | 4.00 | 129,388.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 151.1 | SQYD | 34.50 | 5,212.95 | 60.00 | 9,066.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 644 | LNFT | 16.85 | 10,851.40 | 20.00 | 12,880.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" x 58" CMPA | 69 | LNFT | 29.00 | 2,001.00 | 50.00 | 3,450.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 7,631 | CUYD | 26.50 | 202,221.50 | 50.00 | 381,550.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 174.25 | 8,712.50 | 200.00 | 10,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,556 | LNFT | 2.50 | 3,890.00 | 2.50 | 3,890.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,594 | CUYD | 64.60 | 232,172.40 | 55.00 | 197,670.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 55.00 | 2,750.00 | 175.00 | 8,750.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 17,170.8 | TON | 156.50 | 2,687,230.20 | 150.00 | 2,575,620.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 933.8 | TON | 180.00 | 168,084.00 | 195.00 | 182,091.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 77,834 | SQYD | 2.00 | 155,668.00 | 3.00 | 233,502.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,298 | CUYD | 0.10 | -329.80 | 0.01 | -32.98 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,040 | SQYD | 156.00 | 786,240.00 | 200.00 | 1,008,000.00 | | 0017 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 69 | LNFT | 825.00 | 56,925.00 | 460.00 | 31,740.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 153 | LNFT | 19.00 | 2,907.00 | 30.00 | 4,590.00 | | 0019 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 640 | LNFT | 105.00 | 67,200.00 | 55.00 | 35,200.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 400 | LNFT | 37.75 | 15,100.00 | 35.00 | 14,000.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 151.00 | 30,200.00 | 130.00 | 26,000.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,646.00 | 18,584.00 | 4,050.00 | 16,200.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,181.50 | 16,726.00 | 3,550.00 | 14,200.00 | | 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 151.1 | SQYD | 95.00 | 14,354.50 | 125.00 | 18,887.50 | | 0025 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 50.00 | 5,400.00 | 75.00 | 8,100.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 416,010.97 | 416,010.97 | 150,000.00 | 150,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.118 | MILE | 615.00 | 8,682.57 | 900.00 | 12,706.20 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.396 | MILE | 581.00 | 7,202.08 | 550.00 | 6,817.80 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 34.821 | MILE | 1,278.00 | 44,501.24 | 1,225.00 | 42,655.73 | | 0030 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 13,940.00 | 27,880.00 | 15,000.00 | 30,000.00 | | 0031 | 724-01-00100 | Rumble Strips (Centerline) | 4.63 | MILE | 1,161.50 | 5,377.75 | 1,100.00 | 5,093.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.261 | MILE | 1,161.50 | 10,756.65 | 1,100.00 | 10,187.10 | | 0033 | 726-01-00100 | Bedding Material | 67.4 | CUYD | 125.17 | 8,436.46 | 160.00 | 10,784.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 463,794.53 | 463,794.53 | 650,000.00 | 650,000.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 128.00 | 2,560.00 | 85.00 | 1,700.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 145.25 | 2,324.00 | 85.00 | 1,360.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 703 | EACH | 9.30 | 6,537.90 | 9.00 | 6,327.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.607 | MILE | 6,737.00 | 78,196.36 | 6,400.00 | 74,284.80 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.132 | MILE | 3,426.50 | 14,158.30 | 3,250.00 | 13,429.00 | | 0040 | 735-01-00100 | Mailboxes | 33 | EACH | 30.00 | 990.00 | 22.00 | 726.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 290.50 | 9,586.50 | 275.00 | 9,075.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.25 | ACRE | 2,905.00 | 6,536.25 | 3,275.00 | 7,368.75 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,700.00 | 16,700.00 | 25,000.00 | 25,000.00 | | 0044 | 805-15-02400 | Reinforced Concrete Box Culverts (Precast) (9' x 9') | 168 | LNFT | 3,150.00 | 529,200.00 | 2,300.00 | 386,400.00 | | 0045 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Straight Headwall
Concrete Qty. - 50.926 CuYd
Steel Qty. - 3,816.08 lbs | 2 | EACH | 74,038.05 | 148,076.10 | 75,000.00 | 150,000.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) Bridge Joints | 972 | LNFT | 25.00 | 24,300.00 | 50.00 | 48,600.00 | | 0047 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 320 | LNFT | 10.00 | 3,200.00 | 10.50 | 3,360.00 | | 0048 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 652 | LNFT | 13.50 | 8,802.00 | 10.50 | 6,846.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,473,013.26 | | 6,613,637.40 |
|