Proposal:H.014108.6
Parish:Ouachita
Routes:US 165
Description:US 165 SB: RILLA - PEARL ST
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,510,913.59
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $5,412,673.77 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $6,098,461.05 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $6,436,418.48 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions BRICK MAILBOX | 1 | LUMP | 11,000.00 | 11,000.00 | 1,500.00 | 1,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 3,027.8 | SQYD | 14.00 | 42,389.20 | 7.00 | 21,194.60 | 28.00 | 84,778.40 | | 0003 | 202-02-14500 | Removal of Guard Rail | 1,518 | LNFT | 14.00 | 21,252.00 | 20.00 | 30,360.00 | 9.00 | 13,662.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 485 | CUYD | 16.00 | 7,760.00 | 45.00 | 21,825.00 | 100.00 | 48,500.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 400.00 | 1,600.00 | 150.00 | 600.00 | 200.00 | 800.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 19,741.3 | TON | 153.00 | 3,020,418.90 | 155.00 | 3,059,901.50 | 160.00 | 3,158,608.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,999.5 | TON | 165.00 | 494,917.50 | 155.00 | 464,922.50 | 256.00 | 767,872.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 76,791 | SQYD | 3.50 | 268,768.50 | 7.50 | 575,932.50 | 5.00 | 383,955.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,518 | CUYD | 1.00 | -2,518.00 | 1.00 | -2,518.00 | 1.00 | -2,518.00 | | 0010 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 2,482 | SQYD | 180.00 | 446,760.00 | 225.00 | 558,450.00 | 187.00 | 464,134.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,381.3 | LNFT | 33.00 | 45,582.90 | 38.00 | 52,489.40 | 31.00 | 42,820.30 | | 0012 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 90.00 | 9,000.00 | 100.00 | 10,000.00 | 68.00 | 6,800.00 | | 0013 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 140.00 | 28,000.00 | 120.00 | 24,000.00 | | 0014 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,000.00 | 16,000.00 | 4,500.00 | 18,000.00 | 3,800.00 | 15,200.00 | | 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,700.00 | 14,800.00 | 4,000.00 | 16,000.00 | 3,400.00 | 13,600.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 125,000.00 | 125,000.00 | 265,000.00 | 265,000.00 | 225,000.00 | 225,000.00 | | 0017 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,386 | LNFT | 0.20 | 1,077.20 | 0.20 | 1,077.20 | 0.65 | 3,500.90 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 849 | LNFT | 0.40 | 339.60 | 0.40 | 339.60 | 0.75 | 636.75 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.767 | MILE | 154.00 | 2,120.12 | 250.00 | 3,441.75 | 225.00 | 3,097.58 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.767 | MILE | 750.00 | 10,325.25 | 700.00 | 9,636.90 | 500.00 | 6,883.50 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.534 | MILE | 900.00 | 24,780.60 | 900.00 | 24,780.60 | 650.00 | 17,897.10 | | 0022 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 39 | EACH | 25.00 | 975.00 | 25.00 | 975.00 | 26.00 | 1,014.00 | | 0023 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 21 | EACH | 25.00 | 525.00 | 25.00 | 525.00 | 26.00 | 546.00 | | 0024 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 60 | EACH | 25.00 | 1,500.00 | 25.00 | 1,500.00 | 46.00 | 2,760.00 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.178 | MILE | 1,100.00 | 10,095.80 | 300.00 | 2,753.40 | 1,100.00 | 10,095.80 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 352,000.00 | 352,000.00 | 430,000.00 | 430,000.00 | 630,000.00 | 630,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 135.00 | 1,080.00 | 100.00 | 800.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 696 | EACH | 5.00 | 3,480.00 | 6.00 | 4,176.00 | 6.00 | 4,176.00 | | 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,795 | LNFT | 4.00 | 7,180.00 | 5.00 | 8,975.00 | 4.00 | 7,180.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 283 | LNFT | 20.00 | 5,660.00 | 20.00 | 5,660.00 | 13.00 | 3,679.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.178 | MILE | 4,500.00 | 41,301.00 | 5,000.00 | 45,890.00 | 5,000.00 | 45,890.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.589 | MILE | 1,200.00 | 5,506.80 | 1,500.00 | 6,883.50 | 950.00 | 4,359.55 | | 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 300.00 | 3,900.00 | 400.00 | 5,200.00 | 300.00 | 3,900.00 | | 0034 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 300.00 | 2,100.00 | 400.00 | 2,800.00 | 300.00 | 2,100.00 | | 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 20 | EACH | 455.00 | 9,100.00 | 500.00 | 10,000.00 | 250.00 | 5,000.00 | | 0036 | 735-01-00100 | Mailboxes | 3 | EACH | 25.00 | 75.00 | 50.00 | 150.00 | 27.00 | 81.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 200.00 | 600.00 | 750.00 | 2,250.00 | 210.00 | 630.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 3.27 | ACRE | 2,900.00 | 9,483.00 | 3,600.00 | 11,772.00 | 3,000.00 | 9,810.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 17,500.00 | 17,500.00 | 50,000.00 | 50,000.00 | | 0040 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 71,316 | LNFT | 1.50 | 106,974.00 | 1.50 | 106,974.00 | 1.60 | 114,105.60 | | 0041 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 28,536 | LNFT | 1.25 | 35,670.00 | 1.50 | 42,804.00 | 1.10 | 31,389.60 | | 0042 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 199,704 | LNFT | 1.10 | 219,674.40 | 1.15 | 229,659.60 | 1.10 | 219,674.40 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,412,673.77 | | 6,098,461.05 | | 6,436,418.48 |
|