Search


Bid Tabulations for the Letting of 8/28/2024 LA DOTD Headquarters

Proposal:H.015756.6
Parish:Caldwell, Concordia
Routes:US 165, US 84
Description:US 165 & US 84 PCCP PATCHING
Type Construction:PCCP PATCHING & RELATED WORK.
Estimated Construction Cost:$1,742,277.00
Rank License BidderConstruction Bid
121982Forby Contracting, Inc.$1,516,625.00
225609DIAMOND SURFACE, INC.$2,324,437.65
339462JB JAMES CONSTRUCTION LLC$3,138,745.00
459114SOUTHERN ROAD & BRIDGE, LLC$4,487,053.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Forby Contracting, Inc.
- 2 -
DIAMOND SURFACE, INC.
- 3 -
JB JAMES CONSTRUCTION LLC
- 4 -
SOUTHERN ROAD & BRIDGE, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD50.005,000.00125.0012,500.00285.0028,500.00150.0015,000.00
0002602-05-01160Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) 2,328.3   SQYD250.00582,075.00397.50925,499.25500.001,164,150.00785.001,827,715.50
0003602-05-02160Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) 1,199.5   SQYD220.00263,890.00338.70406,270.65450.00539,775.00685.00821,657.50
0004602-05-03160Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) 1,953.3   SQYD200.00390,660.00317.50620,172.75400.00781,320.00585.001,142,680.50
0005713-01-00100Temporary Signs and Barricades 1     LUMP100,000.00100,000.0093,750.0093,750.00300,000.00300,000.00325,000.00325,000.00
0006727-01-00100Mobilization 1     LUMP150,000.00150,000.00259,995.00259,995.00300,000.00300,000.00330,000.00330,000.00
0007740-01-00100Construction Layout 1     LUMP25,000.0025,000.006,250.006,250.0025,000.0025,000.0025,000.0025,000.00
             
  CONTRACTOR TOTAL   1,516,625.00 2,324,437.65 3,138,745.00 4,487,053.50