Proposal:H.015056.6
Parish:Vermilion
Routes:LA 685
Description:LA 685: LA 14-BUSINESS - BAYOU TIGRE
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,140,585.30
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $1,848,481.07 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $2,482,142.11 |
| 3 | 34356 | Prairie Contractors LLC | $2,842,081.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 47 | SQYD | 29.00 | 1,363.00 | 14.00 | 658.00 | 15.00 | 705.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 5,315.4 | SQYD | 9.50 | 50,496.30 | 15.75 | 83,717.55 | 17.00 | 90,361.80 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 12 | EACH | 430.00 | 5,160.00 | 740.00 | 8,880.00 | 850.00 | 10,200.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 267 | LNFT | 10.00 | 2,670.00 | 27.00 | 7,209.00 | 32.00 | 8,544.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 217.5 | SQYD | 23.50 | 5,111.25 | 26.50 | 5,763.75 | 30.00 | 6,525.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 407.1 | LNFT | 10.30 | 4,193.13 | 20.25 | 8,243.78 | 15.00 | 6,106.50 | | 0007 | 202-02-26000 | Removal of Manholes | 4 | EACH | 430.00 | 1,720.00 | 640.00 | 2,560.00 | 800.00 | 3,200.00 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) (15" RCP) | 36 | LNFT | 60.00 | 2,160.00 | 97.00 | 3,492.00 | 105.00 | 3,780.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (18" RCP) | 88 | LNFT | 60.00 | 5,280.00 | 97.00 | 8,536.00 | 105.00 | 9,240.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (30" RCP) | 20 | LNFT | 60.00 | 1,200.00 | 97.00 | 1,940.00 | 105.00 | 2,100.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) (36" RCP) | 4 | LNFT | 60.00 | 240.00 | 126.00 | 504.00 | 140.00 | 560.00 | | 0012 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 203 | SQYD | 14.00 | 2,842.00 | 20.00 | 4,060.00 | 25.00 | 5,075.00 | | 0013 | 203-02-00100 | Drainage Excavation | 98 | CUYD | 52.50 | 5,145.00 | 52.00 | 5,096.00 | 65.00 | 6,370.00 | | 0014 | 203-03-00100 | Embankment | 994 | CUYD | 23.25 | 23,110.50 | 57.25 | 56,906.50 | 65.00 | 64,610.00 | | 0015 | 203-10-00100 | Cleaning Existing Ditches | 260 | LNFT | 20.80 | 5,408.00 | 11.50 | 2,990.00 | 20.00 | 5,200.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 42.42 | 4,242.00 | 38.50 | 3,850.00 | 30.00 | 3,000.00 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 181.80 | 1,818.00 | 165.00 | 1,650.00 | 200.00 | 2,000.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 4,500 | LNFT | 2.42 | 10,890.00 | 2.20 | 9,900.00 | 3.00 | 13,500.00 | | 0019 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 6,022 | SQYD | 10.00 | 60,220.00 | 24.00 | 144,528.00 | 30.00 | 180,660.00 | | 0020 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 86.40 | 8,640.00 | 49.50 | 4,950.00 | 60.00 | 6,000.00 | | 0021 | 304-01-00100 | Lime | 40 | TON | 265.00 | 10,600.00 | 310.00 | 12,400.00 | 375.00 | 15,000.00 | | 0022 | 304-05-00100 | Lime Treatment (Type E) | 1,403 | SQYD | 4.65 | 6,523.95 | 7.00 | 9,821.00 | 10.00 | 14,030.00 | | 0023 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 6,022 | SQYD | 11.00 | 66,242.00 | 21.70 | 130,677.40 | 28.00 | 168,616.00 | | 0024 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 179 | CUYD | 68.00 | 12,172.00 | 157.00 | 28,103.00 | 120.00 | 21,480.00 | | 0025 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 700 | CUYD | 60.00 | 42,000.00 | 133.00 | 93,100.00 | 200.00 | 140,000.00 | | 0026 | 502-01-00100 | Asphalt Concrete | 3,479.2 | TON | 136.40 | 474,562.88 | 143.00 | 497,525.60 | 135.00 | 469,692.00 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 200.2 | TON | 152.00 | 30,430.40 | 225.00 | 45,045.00 | 220.00 | 44,044.00 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 4,933 | SQYD | 1.83 | 9,027.39 | 8.25 | 40,697.25 | 7.50 | 36,997.50 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -168 | CUYD | 0.10 | -16.80 | 0.01 | -1.68 | 0.01 | -1.68 | | 0030 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 793 | SQYD | 135.40 | 107,372.20 | 225.00 | 178,425.00 | 190.00 | 150,670.00 | | 0031 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 11,763 | LNFT | 4.65 | 54,697.95 | 6.00 | 70,578.00 | 4.00 | 47,052.00 | | 0032 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 6,271 | LNFT | 5.25 | 32,922.75 | 6.00 | 37,626.00 | 4.50 | 28,219.50 | | 0033 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 36 | LNFT | 530.20 | 19,087.20 | 100.50 | 3,618.00 | 125.00 | 4,500.00 | | 0034 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 84 | LNFT | 533.06 | 44,777.04 | 100.50 | 8,442.00 | 125.00 | 10,500.00 | | 0035 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 20 | LNFT | 601.39 | 12,027.80 | 175.00 | 3,500.00 | 210.00 | 4,200.00 | | 0036 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 4 | LNFT | 720.80 | 2,883.20 | 375.00 | 1,500.00 | 425.00 | 1,700.00 | | 0037 | 701-15-00100 | Concrete Collar | 35 | EACH | 450.00 | 15,750.00 | 995.00 | 34,825.00 | 1,250.00 | 43,750.00 | | 0038 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 2 | EACH | 3,681.75 | 7,363.50 | 4,650.00 | 9,300.00 | 5,750.00 | 11,500.00 | | 0039 | 702-03-00100 | Catch Basins (CB-01) | 16 | EACH | 5,181.75 | 82,908.07 | 6,100.00 | 97,600.00 | 7,500.00 | 120,000.00 | | 0040 | 702-03-00500 | Catch Basins (CB-06) | 3 | EACH | 4,600.00 | 13,800.00 | 8,375.00 | 25,125.00 | 9,500.00 | 28,500.00 | | 0041 | 702-04-00100 | Adjusting Manholes | 9 | EACH | 2,496.75 | 22,470.75 | 3,000.00 | 27,000.00 | 3,500.00 | 31,500.00 | | 0042 | 702-04-00110 | Convert Manholes to Catch Basins | 1 | EACH | 2,250.00 | 2,250.00 | 4,550.00 | 4,550.00 | 5,750.00 | 5,750.00 | | 0043 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 290.00 | 870.00 | 460.00 | 1,380.00 | 550.00 | 1,650.00 | | 0044 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 1,500.00 | 3,000.00 | 4,730.00 | 9,460.00 | 5,750.00 | 11,500.00 | | 0045 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 1,950.00 | 1,950.00 | 4,050.00 | 4,050.00 | 5,000.00 | 5,000.00 | | 0046 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 200 | LNFT | 59.99 | 11,998.00 | 82.50 | 16,500.00 | 100.00 | 20,000.00 | | 0047 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 37.57 | 3,287.38 | 33.00 | 2,887.50 | 40.00 | 3,500.00 | | 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 143.02 | 14,302.00 | 138.00 | 13,800.00 | 165.00 | 16,500.00 | | 0049 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,423.80 | 17,695.20 | 4,400.00 | 17,600.00 | 5,500.00 | 22,000.00 | | 0050 | 706-01-00100 | Concrete Walk (4" Thick) | 8.8 | SQYD | 125.00 | 1,100.00 | 262.00 | 2,305.60 | 300.00 | 2,640.00 | | 0051 | 706-02-00200 | Concrete Drive (6" Thick) | 217.5 | SQYD | 88.87 | 19,329.23 | 155.00 | 33,712.50 | 180.00 | 39,150.00 | | 0052 | 706-04-00110 | Curb Ramps (TYPE 1) | 25.6 | SQYD | 215.00 | 5,504.00 | 175.00 | 4,480.00 | 210.00 | 5,376.00 | | 0053 | 706-04-00110 | Curb Ramps (TYPE 6) | 95.9 | SQYD | 215.00 | 20,618.50 | 167.75 | 16,087.23 | 210.00 | 20,139.00 | | 0054 | 706-04-00110 | Curb Ramps (TYPE 7) | 53.2 | SQYD | 215.00 | 11,438.00 | 245.00 | 13,034.00 | 300.00 | 15,960.00 | | 0055 | 707-03-00100 | Combination Concrete Curb and Gutter | 267 | LNFT | 37.50 | 10,012.50 | 203.00 | 54,201.00 | 225.00 | 60,075.00 | | 0056 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 37.50 | 2,025.00 | 410.00 | 22,140.00 | 300.00 | 16,200.00 | | 0057 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 48,075.00 | 48,075.00 | 83,000.00 | 83,000.00 | 200,000.00 | 200,000.00 | | 0058 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 100 | LNFT | 1.21 | 121.00 | 0.30 | 30.00 | 1.00 | 100.00 | | 0059 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 354 | LNFT | 2.42 | 856.68 | 0.55 | 194.70 | 2.00 | 708.00 | | 0060 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.402 | MILE | 616.00 | 1,479.63 | 1,035.00 | 2,486.07 | 600.00 | 1,441.20 | | 0061 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.612 | MILE | 1,575.80 | 15,146.59 | 1,035.00 | 9,948.42 | 1,500.00 | 14,418.00 | | 0062 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 3 | EACH | 60.60 | 181.80 | 28.75 | 86.25 | 50.00 | 150.00 | | 0063 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 3 | EACH | 60.60 | 181.80 | 28.75 | 86.25 | 50.00 | 150.00 | | 0064 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 16,000.00 | 16,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | | 0065 | 726-01-00100 | Bedding Material | 30.4 | CUYD | 70.00 | 2,128.00 | 742.50 | 22,572.00 | 800.00 | 24,320.00 | | 0066 | 727-01-00100 | Mobilization | 1 | LUMP | 194,800.00 | 194,800.00 | 200,000.00 | 200,000.00 | 240,000.00 | 240,000.00 | | 0067 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 103.02 | 412.08 | 110.00 | 440.00 | 150.00 | 600.00 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 222 | EACH | 10.30 | 2,286.60 | 7.00 | 1,554.00 | 10.00 | 2,220.00 | | 0069 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 60 | LNFT | 4.85 | 291.00 | 3.45 | 207.00 | 5.00 | 300.00 | | 0070 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 118 | LNFT | 21.82 | 2,574.76 | 17.25 | 2,035.50 | 22.00 | 2,596.00 | | 0071 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.204 | MILE | 7,575.00 | 24,270.30 | 5,510.00 | 17,654.04 | 7,500.00 | 24,030.00 | | 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 484.80 | 484.80 | 403.00 | 403.00 | 500.00 | 500.00 | | 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 606.00 | 606.00 | 515.00 | 515.00 | 625.00 | 625.00 | | 0074 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 1,575.60 | 1,575.60 | 977.00 | 977.00 | 1,550.00 | 1,550.00 | | 0075 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 2 | EACH | 1,212.00 | 2,424.00 | 977.00 | 1,954.00 | 1,250.00 | 2,500.00 | | 0076 | 739-01-00100 | Hydro-Seeding | 0.75 | ACRE | 7,029.60 | 5,272.20 | 6,500.00 | 4,875.00 | 8,000.00 | 6,000.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,700.00 | 13,700.00 | 29,000.00 | 29,000.00 | 45,000.00 | 45,000.00 | | 0078 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 100.00 | 600.00 | 310.00 | 1,860.00 | 800.00 | 4,800.00 | | 0079 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 5,249 | SQYD | 8.50 | 44,616.50 | 10.00 | 52,490.00 | 11.00 | 57,739.00 | | 0080 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,806 | LNFT | 3.76 | 6,790.56 | 5.00 | 9,030.00 | 3.75 | 6,772.50 | | 0081 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,750 | INLF | 1.25 | 2,187.50 | 1.30 | 2,275.00 | 1.65 | 2,887.50 | | 0082 | NS-602-00001 | Milling Concrete Pavement | 3,901.9 | SQYD | 17.05 | 66,527.40 | 21.00 | 81,939.90 | 25.00 | 97,547.50 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,848,481.07 | | 2,482,142.11 | | 2,842,081.32 |
|