Proposal:H.014811.6
Parish:Richland
Routes:LA 133
Description:LA 133: LA 15 - US 80
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,192,212.74
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $6,715,883.29 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $7,075,210.60 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $8,720,903.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 3.559 | LUMP | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions BRICK MAILBOXES | 1 | LUMP | 11,000.00 | 11,000.00 | 7,500.00 | 7,500.00 | 42,000.00 | 42,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 550.9 | SQYD | 40.00 | 22,036.00 | 15.00 | 8,263.50 | 30.00 | 16,527.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,418.2 | SQYD | 17.00 | 24,109.40 | 10.00 | 14,182.00 | 10.00 | 14,182.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 790 | LNFT | 15.00 | 11,850.00 | 30.00 | 23,700.00 | 8.00 | 6,320.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP | 104 | LNFT | 15.00 | 1,560.00 | 20.00 | 2,080.00 | 50.00 | 5,200.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP | 30 | LNFT | 15.00 | 450.00 | 20.00 | 600.00 | 100.00 | 3,000.00 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 300 | LNFT | 15.00 | 4,500.00 | 20.00 | 6,000.00 | 55.00 | 16,500.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 42 | LNFT | 18.00 | 756.00 | 20.00 | 840.00 | 55.00 | 2,310.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" EQ. CMPA | 184 | LNFT | 18.00 | 3,312.00 | 20.00 | 3,680.00 | 55.00 | 10,120.00 | | 0011 | 203-01-00100 | General Excavation | 795 | CUYD | 45.00 | 35,775.00 | 20.00 | 15,900.00 | 40.00 | 31,800.00 | | 0012 | 203-02-00100 | Drainage Excavation | 48 | CUYD | 45.00 | 2,160.00 | 30.00 | 1,440.00 | 50.00 | 2,400.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,009 | CUYD | 40.00 | 80,360.00 | 35.00 | 70,315.00 | 65.00 | 130,585.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 350 | LNFT | 8.00 | 2,800.00 | 6.00 | 2,100.00 | 10.00 | 3,500.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,587 | CUYD | 85.00 | 474,895.00 | 65.00 | 363,155.00 | 75.00 | 419,025.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 21,617.2 | TON | 127.00 | 2,745,384.40 | 150.00 | 3,242,580.00 | 150.00 | 3,242,580.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,665.5 | TON | 241.00 | 642,385.50 | 150.00 | 399,825.00 | 245.00 | 653,047.50 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 111,587 | SQYD | 2.75 | 306,864.25 | 4.00 | 446,348.00 | 5.00 | 557,935.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,598 | CUYD | 1.00 | -3,598.00 | 1.00 | -3,598.00 | 1.00 | -3,598.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 9,518 | SQYD | 129.00 | 1,227,822.00 | 140.00 | 1,332,520.00 | 150.00 | 1,427,700.00 | | 0021 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 112 | LNFT | 225.00 | 25,200.00 | 325.00 | 36,400.00 | 240.00 | 26,880.00 | | 0022 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 320 | LNFT | 255.00 | 81,600.00 | 350.00 | 112,000.00 | 300.00 | 96,000.00 | | 0023 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 240 | LNFT | 285.00 | 68,400.00 | 375.00 | 90,000.00 | 320.00 | 76,800.00 | | 0024 | 701-12-01120 | Corrugated Metal Pipe (Extension) (42") | 24 | LNFT | 350.00 | 8,400.00 | 400.00 | 9,600.00 | 435.00 | 10,440.00 | | 0025 | 701-15-00100 | Concrete Collar | 24 | EACH | 1,200.00 | 28,800.00 | 1,600.00 | 38,400.00 | 2,900.00 | 69,600.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 360 | LNFT | 15.00 | 5,400.00 | 6.00 | 2,160.00 | 1.50 | 540.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 362.5 | LNFT | 33.00 | 11,962.50 | 36.00 | 13,050.00 | 31.00 | 11,237.50 | | 0028 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 100.00 | 10,000.00 | 39.00 | 3,900.00 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 135.00 | 27,000.00 | 115.00 | 23,000.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,900.00 | 31,200.00 | 4,200.00 | 33,600.00 | 3,200.00 | 25,600.00 | | 0031 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 60.00 | 3,240.00 | 50.00 | 2,700.00 | 90.00 | 4,860.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 95,000.00 | 95,000.00 | 56,000.00 | 56,000.00 | 250,000.00 | 250,000.00 | | 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 570 | LNFT | 0.25 | 142.50 | 0.25 | 142.50 | 0.60 | 342.00 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 66 | LNFT | 0.45 | 29.70 | 0.25 | 16.50 | 1.00 | 66.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24.735 | MILE | 154.00 | 3,809.19 | 300.00 | 7,420.50 | 325.00 | 8,038.88 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 16.806 | MILE | 650.00 | 10,923.90 | 300.00 | 5,041.80 | 650.00 | 10,923.90 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 71.564 | MILE | 800.00 | 57,251.20 | 400.00 | 28,625.60 | 850.00 | 60,829.40 | | 0038 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 25.00 | 150.00 | 25.00 | 150.00 | 50.00 | 300.00 | | 0039 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 25.00 | 150.00 | 25.00 | 150.00 | 50.00 | 300.00 | | 0040 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 25.00 | 150.00 | 25.00 | 150.00 | 100.00 | 600.00 | | 0041 | 716-01-00100 | Mulch (Vegetative) | 14.5 | TON | 850.00 | 12,325.00 | 700.00 | 10,150.00 | 850.00 | 12,325.00 | | 0042 | 717-01-00100 | Seeding | 435 | LB | 12.50 | 5,437.50 | 11.00 | 4,785.00 | 25.00 | 10,875.00 | | 0043 | 718-01-00100 | Fertilizer | 7,265 | LB | 0.55 | 3,995.75 | 0.60 | 4,359.00 | 0.75 | 5,448.75 | | 0044 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 4,000.00 | 4,000.00 | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | | 0045 | 726-01-00100 | Bedding Material | 294.5 | CUYD | 160.00 | 47,120.00 | 130.00 | 38,285.00 | 160.00 | 47,120.00 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 373,000.00 | 373,000.00 | 375,000.00 | 375,000.00 | 870,000.00 | 870,000.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 110.00 | 2,640.00 | 125.00 | 3,000.00 | 65.00 | 1,560.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 18 | EACH | 125.00 | 2,250.00 | 135.00 | 2,430.00 | 85.00 | 1,530.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,765 | EACH | 4.00 | 7,060.00 | 6.00 | 10,590.00 | 8.00 | 14,120.00 | | 0050 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 190 | LNFT | 4.00 | 760.00 | 4.00 | 760.00 | 3.50 | 665.00 | | 0051 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 20.00 | 440.00 | 20.00 | 440.00 | 20.00 | 440.00 | | 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.876 | MILE | 4,500.00 | 107,442.00 | 5,200.00 | 124,155.20 | 4,000.00 | 95,504.00 | | 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.602 | MILE | 1,000.00 | 5,602.00 | 1,500.00 | 8,403.00 | 1,500.00 | 8,403.00 | | 0054 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 350.00 | 700.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0055 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 350.00 | 700.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0056 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 950.00 | 1,900.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | | 0057 | 732-05-00100 | Removal of Existing Markings | 0.063 | MILE | 8,500.00 | 535.50 | 20,000.00 | 1,260.00 | 24,000.00 | 1,512.00 | | 0058 | 735-01-00100 | Mailboxes | 54 | EACH | 1.00 | 54.00 | 20.00 | 1,080.00 | 20.00 | 1,080.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 265.00 | 10,600.00 | 240.00 | 9,600.00 | 250.00 | 10,000.00 | | 0060 | 735-03-00100 | Mailbox Supports (Double) | 7 | EACH | 285.00 | 1,995.00 | 260.00 | 1,820.00 | 350.00 | 2,450.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 23,000.00 | 23,000.00 | 100,000.00 | 100,000.00 | | 0062 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 290 | LNFT | 7.00 | 2,030.00 | 9.00 | 2,610.00 | 10.00 | 2,900.00 | | 0063 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 290 | LNFT | 7.00 | 2,030.00 | 6.00 | 1,740.00 | 10.00 | 2,900.00 | | 0064 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,536 | INLF | 1.00 | 2,536.00 | 2.25 | 5,706.00 | 5.00 | 12,680.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,715,883.29 | | 7,075,210.60 | | 8,720,903.93 |
|