Proposal:H.014756.6
Parish:Caddo
Routes:1-20
Description:I-20: DECEL LANE EXT EX 8
Type Construction:GRADING, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, LIGHTING AND RELATED WORK.
Estimated Construction Cost:$799,928.21
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $947,007.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | | Unit Price | Total Amount | | 0001 | 202-02-32000 | Removal of Paved Ditches | 86 | SQYD | 25.00 | 2,150.00 | | 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | | 0003 | 204-02-00100 | Temporary Hay Bales | 12 | EACH | 10.00 | 120.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 2,128 | LNFT | 2.75 | 5,852.00 | | 0005 | 302-02-05010 | Class II Base Course (5" Thick) (Asphalt Concrete Base) | 992.9 | SQYD | 47.35 | 47,013.82 | | 0006 | 304-01-00100 | Lime | 14.07 | TON | 300.00 | 4,221.00 | | 0007 | 304-05-00100 | Lime Treatment (Type E) | 995 | SQYD | 55.00 | 54,725.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 543.4 | TON | 175.00 | 95,095.00 | | 0009 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 260.9 | TON | 400.00 | 104,360.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 1,488 | SQYD | 10.00 | 14,880.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -143 | CUYD | 0.10 | -14.30 | | 0012 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 237.5 | SQYD | 100.00 | 23,750.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | | 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.496 | MILE | 1,000.00 | 496.00 | | 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.496 | MILE | 2,000.00 | 992.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.496 | MILE | 2,000.00 | 992.00 | | 0017 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 71 | EACH | 750.00 | 53,250.00 | | 0018 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 10,000.00 | 20,000.00 | | 0019 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 5,000.00 | 6,000.00 | | 0020 | 717-01-00100 | Seeding | 36 | LB | 50.00 | 1,800.00 | | 0021 | 718-01-00100 | Fertilizer | 608 | LB | 5.00 | 3,040.00 | | 0022 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 85 | SQYD | 20.00 | 1,700.00 | | 0023 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.202 | MILE | 35,000.00 | 7,070.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 170 | EACH | 20.00 | 3,400.00 | | 0026 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 338 | LNFT | 25.00 | 8,450.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.248 | MILE | 50,000.00 | 12,400.00 | | 0028 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.203 | MILE | 50,000.00 | 10,150.00 | | 0029 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.137 | MILE | 30,000.00 | 4,110.00 | | 0030 | 732-05-00100 | Removal of Existing Markings | 0.111 | MILE | 100,000.00 | 11,100.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | | 0032 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,500.00 | 2,500.00 | | 0033 | 822-12-00100 | Removal and Storage of Light Pole (Ground Mount) (Lowmast) | 1 | EACH | 4,500.00 | 4,500.00 | | 0034 | 822-13-00100 | Removal and Disposal of Light Pole Foundation (Ground) | 3 | EACH | 1,000.00 | 3,000.00 | | 0035 | 822-14-00100 | Removal and Disposal of Luminaire | 65 | EACH | 150.00 | 9,750.00 | | 0036 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 10,640 | INLF | 1.00 | 10,640.00 | | 0037 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 15,000.00 | 15,000.00 | | 0038 | NS-822-00175 | Light Pole Foundation (15' Length) | 3 | EACH | 11,500.00 | 34,500.00 | | 0039 | TS-822-09105 | Trenching and Backfilling | 800 | LNFT | 5.00 | 4,000.00 | | 0040 | TS-822-09110 | Conduit w Conductors (PVC/HDPE) (2") (2#4, 1#8 Ground) | 800 | LNFT | 15.50 | 12,400.00 | | 0041 | TS-822-09130 | Light Pole (Steel) (Single Arm) (10') | 3 | EACH | 9,500.00 | 28,500.00 | | 0042 | TS-822-09156 | Luminaire (Roadway) (LED) (4K) | 77 | EACH | 1,375.00 | 105,875.00 | | 0043 | TS-822-09164 | Underground Junction Box (Polymer Concrete) (11"x18") | 2 | EACH | 1,535.00 | 3,070.00 | | 0044 | TS-822-09164 | Underground Junction Box (Polymer Concrete) (12"x12") | 3 | EACH | 1,480.00 | 4,440.00 | | 0045 | TS-822-09172 | Modular Breakaway Cable System | 3 | EACH | 3,510.00 | 10,530.00 | | 0046 | TS-822-09178 | Underground Marker Tape (6") (Detectable) | 800 | LNFT | 1.50 | 1,200.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 947,007.52 |
|