Proposal:H.014118.6
Parish:Concordia
Routes:LA 900
Description:LA 900: LA 568 - US 65
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$2,809,145.00
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,811,925.81 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $2,987,375.68 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $3,503,103.88 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 5.14 | LUMP | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement GUARD RAIL PADS | 491 | SQYD | 14.00 | 6,874.00 | 15.00 | 7,365.00 | 31.00 | 15,221.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall STA. 229+94 Lt. 9'x5'x1' | 1 | EACH | 3,000.00 | 3,000.00 | 10,700.00 | 10,700.00 | 5,000.00 | 5,000.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 423 | LNFT | 27.00 | 11,421.00 | 9.00 | 3,807.00 | 14.00 | 5,922.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" Equiv. CMPA; 24" CMP; 30" CMP | 246 | LNFT | 20.00 | 4,920.00 | 60.00 | 14,760.00 | 25.00 | 6,150.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 48" RCP | 80 | LNFT | 20.00 | 1,600.00 | 60.00 | 4,800.00 | 25.00 | 2,000.00 | | 0007 | 203-02-00100 | Drainage Excavation | 50 | CUYD | 40.00 | 2,000.00 | 60.00 | 3,000.00 | 55.00 | 2,750.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 236 | CUYD | 30.00 | 7,080.00 | 50.00 | 11,800.00 | 55.00 | 12,980.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 20 | EACH | 10.00 | 200.00 | 50.00 | 1,000.00 | 50.00 | 1,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 240 | LNFT | 6.00 | 1,440.00 | 6.00 | 1,440.00 | 5.00 | 1,200.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,067 | CUYD | 75.00 | 155,025.00 | 115.00 | 237,705.00 | 205.00 | 423,735.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 3,979.7 | TON | 155.00 | 616,853.50 | 150.00 | 596,955.00 | 169.00 | 672,569.30 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 742.5 | TON | 155.00 | 115,087.50 | 150.00 | 111,375.00 | 300.00 | 222,750.00 | | 0014 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 16,975 | GAL | 4.60 | 78,085.00 | 4.50 | 76,387.50 | 5.00 | 84,875.00 | | 0015 | 507-02-00300 | Aggregate (S3) | 54,745.1 | SQYD | 2.05 | 112,227.46 | 2.25 | 123,176.48 | 2.00 | 109,490.20 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 644.4 | SQYD | 25.00 | 16,110.00 | 25.00 | 16,110.00 | 55.00 | 35,442.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -20 | CUYD | 1.00 | -20.00 | 1.00 | -20.00 | 1.00 | -20.00 | | 0018 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 3,700 | SQYD | 200.00 | 740,000.00 | 187.00 | 691,900.00 | 220.00 | 814,000.00 | | 0019 | 510-02-00100 | Pavement Widening 12" MINIMUM THICKNESS | 355.8 | SQYD | 180.00 | 64,044.00 | 285.00 | 101,403.00 | 200.00 | 71,160.00 | | 0020 | 701-01-01004 | Cross Drain Pipe (24" RCP/RPVCP) | 146 | LNFT | 300.00 | 43,800.00 | 260.00 | 37,960.00 | 315.00 | 45,990.00 | | 0021 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 100 | LNFT | 340.00 | 34,000.00 | 380.00 | 38,000.00 | 405.00 | 40,500.00 | | 0022 | 701-05-02145 | Side Drain Pipe (Erosion) (48" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 280 | LNFT | 380.00 | 106,400.00 | 325.00 | 91,000.00 | 365.00 | 102,200.00 | | 0023 | 702-01-00100 | Junction Boxes 48" Pipe | 1 | EACH | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | 12,000.00 | 12,000.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 175 | LNFT | 33.00 | 5,775.00 | 31.00 | 5,425.00 | 33.00 | 5,775.00 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 140.00 | 14,000.00 | 122.00 | 12,200.00 | 135.00 | 13,500.00 | | 0026 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,000.00 | 16,000.00 | 3,400.00 | 13,600.00 | 4,100.00 | 16,400.00 | | 0027 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 138.8 | SQYD | 175.00 | 24,290.00 | 210.00 | 29,148.00 | 168.00 | 23,318.40 | | 0028 | 711-04-00100 | Geotextile Fabric | 139 | SQYD | 6.00 | 834.00 | 15.00 | 2,085.00 | 10.00 | 1,390.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 92,000.00 | 92,000.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.557 | MILE | 250.00 | 2,139.25 | 250.00 | 2,139.25 | 154.00 | 1,317.78 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.314 | MILE | 700.00 | 2,319.80 | 750.00 | 2,485.50 | 700.00 | 2,319.80 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.674 | MILE | 1,200.00 | 34,408.80 | 1,250.00 | 35,842.50 | 1,000.00 | 28,674.00 | | 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,131 | EACH | 4.00 | 4,524.00 | 2.60 | 2,940.60 | 4.00 | 4,524.00 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 5,000.00 | 1,000.00 | 5,200.00 | 1,040.00 | 2,550.00 | 510.00 | | 0035 | 717-01-00100 | Seeding | 16 | LB | 30.00 | 480.00 | 57.00 | 912.00 | 45.00 | 720.00 | | 0036 | 718-01-00100 | Fertilizer | 190 | LB | 5.00 | 950.00 | 11.00 | 2,090.00 | 5.00 | 950.00 | | 0037 | 726-01-00100 | Bedding Material | 236 | CUYD | 125.00 | 29,500.00 | 168.00 | 39,648.00 | 160.00 | 37,760.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 290,000.00 | 290,000.00 | 335,000.00 | 335,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 125.00 | 2,000.00 | 80.00 | 1,280.00 | 110.00 | 1,760.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 95.00 | 380.00 | 125.00 | 500.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 912 | EACH | 8.00 | 7,296.00 | 8.00 | 7,296.00 | 6.00 | 5,472.00 | | 0042 | 731-03-00100 | Removal of Raised Pavement Markers | 1.707 | MILE | 500.00 | 853.50 | 250.00 | 426.75 | 2,700.00 | 4,608.90 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.337 | MILE | 6,000.00 | 86,022.00 | 4,100.00 | 58,781.70 | 5,300.00 | 75,986.10 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.657 | MILE | 1,600.00 | 2,651.20 | 1,600.00 | 2,651.20 | 1,200.00 | 1,988.40 | | 0045 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.066 | MILE | 7,800.00 | 514.80 | 4,700.00 | 310.20 | 6,000.00 | 396.00 | | 0046 | 735-01-00100 | Mailboxes | 19 | EACH | 30.00 | 570.00 | 50.00 | 950.00 | 1.00 | 19.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 350.00 | 5,250.00 | 260.00 | 3,900.00 | 400.00 | 6,000.00 | | 0048 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 450.00 | 900.00 | 360.00 | 720.00 | 400.00 | 800.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | | 0050 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 332.8 lbs. Steel; 2.65 cy Concrete | 8 | LNFT | 2,500.00 | 20,000.00 | 3,000.00 | 24,000.00 | 5,500.00 | 44,000.00 | | 0051 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 1 | EACH | 3,000.00 | 3,000.00 | 7,500.00 | 7,500.00 | 5,500.00 | 5,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,811,925.81 | | 2,987,375.68 | | 3,503,103.88 |
|