Proposal:H.014111.6
Parish:St. John the Baptist
Routes:US 61
Description:US 61: AIRPORT RD - ST JAMES P/L
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, TRAFFIC SIGNALS, AND RELATED WORK.
Estimated Construction Cost:$15,047,618.30
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $11,469,369.87 |
| 2 | 06276 | Barriere Construction Co., LLC | $11,719,171.00 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $13,314,782.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,453.7 | SQYD | 5.00 | 12,268.50 | 7.00 | 17,175.90 | 16.00 | 39,259.20 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 4,007.9 | SQYD | 20.00 | 80,158.00 | 32.00 | 128,252.80 | 24.00 | 96,189.60 | | 0003 | 202-02-06120 | Removal of Curbs (Asphalt) | 80 | LNFT | 100.00 | 8,000.00 | 17.00 | 1,360.00 | 35.00 | 2,800.00 | | 0004 | 202-02-26300 | Removal of Median / Island | 20 | SQYD | 100.00 | 2,000.00 | 16.00 | 320.00 | 90.00 | 1,800.00 | | 0005 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,834.29 | 1,834.29 | 1,835.00 | 1,835.00 | 2,000.00 | 2,000.00 | | 0006 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 519.43 | 519.43 | 520.00 | 520.00 | 600.00 | 600.00 | | 0007 | 203-01-00100 | General Excavation | 88 | CUYD | 91.00 | 8,008.00 | 175.00 | 15,400.00 | 85.00 | 7,480.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,809 | CUYD | 51.00 | 296,259.00 | 106.50 | 618,658.50 | 70.00 | 406,630.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 12,458 | LNFT | 1.97 | 24,542.26 | 1.97 | 24,542.26 | 2.00 | 24,916.00 | | 0010 | 302-02-12000 | Class II Base Course (12" Thick) (Crushed Stone) | 2,590 | SQYD | 40.15 | 103,988.50 | 55.00 | 142,450.00 | 80.00 | 207,200.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 65,765.9 | TON | 109.00 | 7,168,483.10 | 108.00 | 7,102,717.20 | 128.00 | 8,418,035.20 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 343.1 | TON | 259.82 | 89,144.24 | 275.00 | 94,352.50 | 215.00 | 73,766.50 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 252,382 | SQYD | 2.20 | 555,240.40 | 2.75 | 694,050.50 | 3.50 | 883,337.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10,600 | CUYD | 0.01 | -106.00 | 0.10 | -1,060.00 | 0.00 | 0.00 | | 0015 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,961 | SQYD | 132.43 | 392,125.23 | 135.50 | 401,215.50 | 170.00 | 503,370.00 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) (Blow Up Repair Patching) | 2,109 | SQYD | 109.91 | 231,800.19 | 195.00 | 411,255.00 | 190.00 | 400,710.00 | | 0017 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 7,500.00 | 7,500.00 | 4,750.00 | 4,750.00 | 5,000.00 | 5,000.00 | | 0018 | 706-03-00700 | Incidental Concrete Paving (10" Thick) | 557.7 | SQYD | 210.00 | 117,117.00 | 195.50 | 109,030.35 | 210.00 | 117,117.00 | | 0019 | 707-01-00100 | Concrete Curb | 5,574 | LNFT | 38.00 | 211,812.00 | 62.10 | 346,145.40 | 55.00 | 306,570.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 547,784.27 | 547,784.27 | 730,000.00 | 730,000.00 | 360,000.00 | 360,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 71,376 | LNFT | 0.15 | 10,706.40 | 0.10 | 7,137.60 | 0.15 | 10,706.40 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,708 | LNFT | 0.35 | 597.80 | 1.00 | 1,708.00 | 0.35 | 597.80 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 45.509 | MILE | 350.00 | 15,928.15 | 1,017.00 | 46,282.65 | 500.00 | 22,754.50 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 41.23 | MILE | 700.00 | 28,861.00 | 500.00 | 20,615.00 | 700.00 | 28,861.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 49.542 | MILE | 900.00 | 44,587.80 | 800.00 | 39,633.60 | 900.00 | 44,587.80 | | 0026 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 92 | EACH | 25.00 | 2,300.00 | 25.00 | 2,300.00 | 25.00 | 2,300.00 | | 0027 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 40 | EACH | 25.00 | 1,000.00 | 25.00 | 1,000.00 | 25.00 | 1,000.00 | | 0028 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 16 | EACH | 25.00 | 400.00 | 25.00 | 400.00 | 25.00 | 400.00 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 19.851 | MILE | 265.00 | 5,260.52 | 265.00 | 5,260.52 | 300.00 | 5,955.30 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 1,104,481.00 | 1,104,481.00 | 313,428.17 | 313,428.17 | 900,000.00 | 900,000.00 | | 0031 | 729-19-00200 | Dead End Road Installations (Type B) | 1 | EACH | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 3,000.00 | 3,000.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,208 | EACH | 5.00 | 16,040.00 | 6.00 | 19,248.00 | 6.00 | 19,248.00 | | 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 427 | LNFT | 15.00 | 6,405.00 | 14.00 | 5,978.00 | 16.00 | 6,832.00 | | 0034 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 7,065 | LNFT | 2.75 | 19,428.75 | 3.25 | 22,961.25 | 3.00 | 21,195.00 | | 0035 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 10,779 | LNFT | 2.75 | 29,642.25 | 3.25 | 35,031.75 | 3.00 | 32,337.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.095 | MILE | 4,400.00 | 88,418.00 | 4,210.00 | 84,599.95 | 4,500.00 | 90,427.50 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.975 | MILE | 1,000.00 | 10,975.00 | 1,200.00 | 13,170.00 | 1,100.00 | 12,072.50 | | 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 23 | EACH | 300.00 | 6,900.00 | 400.00 | 9,200.00 | 350.00 | 8,050.00 | | 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 300.00 | 3,000.00 | 400.00 | 4,000.00 | 350.00 | 3,500.00 | | 0040 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 600.00 | 2,400.00 | 750.00 | 3,000.00 | 650.00 | 2,600.00 | | 0041 | 735-01-00100 | Mailboxes | 1 | EACH | 20.00 | 20.00 | 20.00 | 20.00 | 50.00 | 50.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 250.00 | 250.00 | 250.00 | 250.00 | 1,000.00 | 1,000.00 | | 0043 | 736-01-00100 | Trenching and Backfilling | 380 | LNFT | 9.26 | 3,518.80 | 9.26 | 3,518.80 | 11.00 | 4,180.00 | | 0044 | 736-03-00100 | Jacking or Boring | 290 | LNFT | 43.41 | 12,588.90 | 43.50 | 12,615.00 | 48.00 | 13,920.00 | | 0045 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) (with backplate) | 9 | EACH | 1,138.86 | 10,249.74 | 1,140.00 | 10,260.00 | 1,250.00 | 11,250.00 | | 0046 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) (with backplate) | 3 | EACH | 1,138.86 | 3,416.58 | 1,140.00 | 3,420.00 | 1,250.00 | 3,750.00 | | 0047 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) (with backplate) | 1 | EACH | 1,424.57 | 1,424.57 | 1,425.00 | 1,425.00 | 1,600.00 | 1,600.00 | | 0048 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) (with backplate) | 2 | EACH | 1,881.14 | 3,762.28 | 1,885.00 | 3,770.00 | 2,100.00 | 4,200.00 | | 0049 | 736-09-00100 | Loop Detector | 2,730 | LNFT | 24.77 | 67,622.10 | 24.80 | 67,704.00 | 28.00 | 76,440.00 | | 0050 | 736-10-00200 | Underground Junction Box (Type E) | 5 | EACH | 1,170.40 | 5,852.00 | 1,172.00 | 5,860.00 | 1,300.00 | 6,500.00 | | 0051 | 736-10-00300 | Underground Junction Box (Type F) | 5 | EACH | 1,444.84 | 7,224.20 | 1,448.00 | 7,240.00 | 1,600.00 | 8,000.00 | | 0052 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 210 | LNFT | 3.97 | 833.70 | 3.97 | 833.70 | 4.00 | 840.00 | | 0053 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 100 | LNFT | 6.11 | 611.00 | 6.12 | 612.00 | 7.00 | 700.00 | | 0054 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 360 | LNFT | 9.33 | 3,358.80 | 9.35 | 3,366.00 | 10.00 | 3,600.00 | | 0055 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 980 | LNFT | 3.61 | 3,537.80 | 3.62 | 3,547.60 | 4.00 | 3,920.00 | | 0056 | 737-05-00002 | Painted Curbs | 5,574 | LNFT | 1.00 | 5,574.00 | 1.00 | 5,574.00 | 1.00 | 5,574.00 | | 0057 | 737-06-00002 | Painted Islands | 558 | SQYD | 10.00 | 5,580.00 | 15.00 | 8,370.00 | 15.00 | 8,370.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 14.305 | ACRE | 2,597.89 | 37,162.82 | 2,600.00 | 37,193.00 | 2,600.00 | 37,193.00 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,110.00 | 19,110.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 15,490 | INLF | 1.25 | 19,362.50 | 0.85 | 13,166.50 | 1.00 | 15,490.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,469,369.87 | | 11,719,171.00 | | 13,314,782.30 |
|