Proposal:H.015757.6
Parish:Evangeline
Routes:LA 13
Description:LA 13: LA 1160 - LA 10
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, THIN ASPHALT OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,345,277.30
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $1,341,180.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,690,300.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 501-02-00100 | Thin Asphalt Concrete (Coarse Mix) | 3,293.2 | TON | 181.00 | 596,069.20 | 257.00 | 846,352.40 | | 0002 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10 | CUYD | 0.01 | -0.10 | 1.00 | -10.00 | | 0003 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 568 | SQYD | 190.00 | 107,920.00 | 300.00 | 170,400.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 38,000.00 | 38,000.00 | | 0005 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.922 | MILE | 650.00 | 4,499.30 | 154.00 | 1,065.99 | | 0006 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.882 | MILE | 1.00 | 6.88 | 800.00 | 5,505.60 | | 0007 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.466 | MILE | 1.00 | 16.47 | 1,200.00 | 19,759.20 | | 0008 | 724-01-00100 | Rumble Strips (Centerline) | 3.461 | MILE | 1,350.00 | 4,672.35 | 1,200.00 | 4,153.20 | | 0009 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.922 | MILE | 1,350.00 | 9,344.70 | 1,200.00 | 8,306.40 | | 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 165,000.00 | 165,000.00 | | 0011 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 150.00 | 4,800.00 | 125.00 | 4,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 509 | EACH | 10.00 | 5,090.00 | 9.00 | 4,581.00 | | 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 32.00 | 384.00 | 25.00 | 300.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.233 | MILE | 8,000.00 | 65,864.00 | 7,000.00 | 57,631.00 | | 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.049 | MILE | 4,000.00 | 12,196.00 | 4,000.00 | 12,196.00 | | 0016 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 1 | EACH | 1,200.00 | 1,200.00 | 1,100.00 | 1,100.00 | | 0017 | 735-01-00100 | Mailboxes | 9 | EACH | 10.00 | 90.00 | 1.00 | 9.00 | | 0018 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 425.00 | 3,825.00 | 600.00 | 5,400.00 | | 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | | 0020 | NS-507-00500 | Asphalt Material (Rejuvenating Scrub Seal) | 17,204 | GAL | 6.25 | 107,525.00 | 6.25 | 107,525.00 | | 0021 | NS-507-00510 | Aggregate (Rejuvenating Scrub Seal) | 49,152 | SQYD | 4.35 | 213,811.20 | 4.25 | 208,896.00 | | 0022 | NS-509-00001 | Micro-Milling Asphaltic Pavement | 671 | SQYD | 46.00 | 30,866.00 | 30.00 | 20,130.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,341,180.00 | | 1,690,300.79 |
|