Proposal:H.015361.6
Parish:St. Helena
Routes:LA 16
Description:LA 16: MCDANIEL RD - TANGIPAHOA P/L
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$1,212,778.49
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,170,469.27 |
| 2 | 73475 | Madden Gulf Coast, LLC | $1,172,678.00 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,194,076.23 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,259,976.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Madden Gulf Coast, LLC | - 3 - Barriere Construction Co., LLC | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 1,484 | LNFT | 6.60 | 9,794.40 | 6.50 | 9,646.00 | 6.50 | 9,646.00 | 7.50 | 11,130.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 12 | EACH | 36.00 | 432.00 | 35.00 | 420.00 | 35.00 | 420.00 | 40.00 | 480.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 163 | CUYD | 180.19 | 29,370.97 | 79.00 | 12,877.00 | 300.00 | 48,900.00 | 65.00 | 10,595.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 205.00 | 2,460.00 | 150.00 | 1,800.00 | 150.00 | 1,800.00 | 155.00 | 1,860.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 8,922 | LNFT | 2.00 | 17,844.00 | 1.80 | 16,059.60 | 0.50 | 4,461.00 | 2.00 | 17,844.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 240.00 | 720.00 | 500.00 | 1,500.00 | 2,500.00 | 7,500.00 | 400.00 | 1,200.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 4,856.6 | TON | 118.00 | 573,078.80 | 110.00 | 534,226.00 | 119.00 | 577,935.40 | 128.00 | 621,644.80 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 341.3 | TON | 190.00 | 64,847.00 | 250.00 | 85,325.00 | 192.50 | 65,700.25 | 228.00 | 77,816.40 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 18,373 | SQYD | 4.00 | 73,492.00 | 4.00 | 73,492.00 | 4.50 | 82,678.50 | 5.00 | 91,865.00 | | 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 393 | SQYD | 166.00 | 65,238.00 | 150.00 | 58,950.00 | 150.00 | 58,950.00 | 200.00 | 78,600.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 562.8 | LNFT | 30.00 | 16,884.00 | 28.50 | 16,039.80 | 28.50 | 16,039.80 | 32.00 | 18,009.60 | | 0012 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 115.00 | 34,500.00 | 112.00 | 33,600.00 | 112.00 | 33,600.00 | 124.00 | 37,200.00 | | 0013 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 3,100.00 | 37,200.00 | 3,000.00 | 36,000.00 | 3,000.00 | 36,000.00 | 3,300.00 | 39,600.00 | | 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 432.2 | SQYD | 162.00 | 70,016.40 | 115.00 | 49,703.00 | 100.00 | 43,220.00 | 135.00 | 58,347.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 94,000.00 | 94,000.00 | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | | 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.52 | MILE | 220.00 | 554.40 | 350.00 | 882.00 | 320.00 | 806.40 | 300.00 | 756.00 | | 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.535 | MILE | 850.00 | 2,154.75 | 600.00 | 1,521.00 | 0.01 | 0.03 | 600.00 | 1,521.00 | | 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.271 | MILE | 1,000.00 | 5,271.00 | 1,000.00 | 5,271.00 | 0.01 | 0.05 | 1,000.00 | 5,271.00 | | 0019 | 724-01-00100 | Rumble Strips (Centerline) | 0.84 | MILE | 300.00 | 252.00 | 1,000.00 | 840.00 | 300.00 | 252.00 | 350.00 | 294.00 | | 0020 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.68 | MILE | 300.00 | 504.00 | 1,000.00 | 1,680.00 | 300.00 | 504.00 | 350.00 | 588.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 100,250.00 | 100,250.00 | 98,500.00 | 98,500.00 | 80,000.00 | 80,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 100.00 | 1,200.00 | 90.00 | 1,080.00 | 90.00 | 1,080.00 | 100.00 | 1,200.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 141 | EACH | 7.00 | 987.00 | 6.00 | 846.00 | 6.00 | 846.00 | 7.00 | 987.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.757 | MILE | 4,200.00 | 7,379.40 | 5,800.00 | 10,190.60 | 5,800.00 | 10,190.60 | 6,300.00 | 11,069.10 | | 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.845 | MILE | 1,350.00 | 1,140.75 | 1,500.00 | 1,267.50 | 1,500.00 | 1,267.50 | 1,600.00 | 1,352.00 | | 0026 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.019 | MILE | 9,100.00 | 172.90 | 8,500.00 | 161.50 | 8,500.00 | 161.50 | 5,000.00 | 95.00 | | 0027 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 0.128 | MILE | 5,500.00 | 704.00 | 5,000.00 | 640.00 | 5,000.00 | 640.00 | 5,100.00 | 652.80 | | 0028 | 732-05-00100 | Removal of Existing Markings | 0.128 | MILE | 13,500.00 | 1,728.00 | 10,000.00 | 1,280.00 | 10,000.00 | 1,280.00 | 10,000.00 | 1,280.00 | | 0029 | 735-01-00100 | Mailboxes | 7 | EACH | 20.50 | 143.50 | 250.00 | 1,750.00 | 20.00 | 140.00 | 22.00 | 154.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 260.00 | 1,820.00 | 20.00 | 140.00 | 250.00 | 1,750.00 | 275.00 | 1,925.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 0.24 | ACRE | 14,000.00 | 3,360.00 | 7,500.00 | 1,800.00 | 7,500.00 | 1,800.00 | 8,000.00 | 1,920.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 18,000.00 | 18,000.00 | 18,000.00 | 18,000.00 | 9,000.00 | 9,000.00 | | 0033 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 720 | INLF | 1.00 | 720.00 | 2.00 | 1,440.00 | 0.01 | 7.20 | 1.00 | 720.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,170,469.27 | | 1,172,678.00 | | 1,194,076.23 | | 1,259,976.70 |
|