Proposal:H.014866.6
Parish:Ascension
Routes:LA 30
Description:LA 30: VETERAN'S BLVD - US 61
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS AND RELATED WORK.
Estimated Construction Cost:$4,459,083.34
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,053,058.40 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,091,525.70 |
| 3 | 73475 | Madden Gulf Coast, LLC | $4,265,975.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | - 3 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-26300 | Removal of Median / Island | 14 | SQYD | 50.00 | 700.00 | 50.00 | 700.00 | 300.00 | 4,200.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 229 | CUYD | 80.00 | 18,320.00 | 115.00 | 26,335.00 | 175.00 | 40,075.00 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 273 | CUYD | 100.00 | 27,300.00 | 123.00 | 33,579.00 | 210.00 | 57,330.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 16,060.9 | TON | 133.00 | 2,136,099.70 | 132.00 | 2,120,038.80 | 125.00 | 2,007,612.50 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,110.5 | TON | 195.00 | 216,547.50 | 342.00 | 379,791.00 | 275.00 | 305,387.50 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 73,741 | SQYD | 4.00 | 294,964.00 | 3.25 | 239,658.25 | 3.50 | 258,093.50 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,189 | CUYD | 0.00 | 0.00 | 0.01 | -31.89 | 0.01 | -31.89 | | 0008 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 557 | SQYD | 132.00 | 73,524.00 | 159.00 | 88,563.00 | 190.00 | 105,830.00 | | 0009 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 2,920 | LNFT | 3.00 | 8,760.00 | 3.25 | 9,490.00 | 7.50 | 21,900.00 | | 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,240 | LNFT | 3.00 | 6,720.00 | 3.35 | 7,504.00 | 7.50 | 16,800.00 | | 0011 | 602-03-00100 | Cleaning and Sealing Random Cracks | 450 | LNFT | 6.00 | 2,700.00 | 10.00 | 4,500.00 | 7.50 | 3,375.00 | | 0012 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 23.8 | SQYD | 550.00 | 13,090.00 | 500.00 | 11,900.00 | 383.00 | 9,115.40 | | 0013 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 176.1 | SQYD | 300.00 | 52,830.00 | 300.00 | 52,830.00 | 271.00 | 47,723.10 | | 0014 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 1,786.3 | SQYD | 255.00 | 455,506.50 | 240.00 | 428,712.00 | 238.00 | 425,139.40 | | 0015 | 707-01-00100 | Concrete Curb | 214 | LNFT | 50.00 | 10,700.00 | 100.00 | 21,400.00 | 45.00 | 9,630.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 215,000.00 | 215,000.00 | 330,500.00 | 330,500.00 | 325,000.00 | 325,000.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.205 | MILE | 300.00 | 3,361.50 | 208.00 | 2,330.64 | 350.00 | 3,921.75 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.48 | MILE | 750.00 | 9,360.00 | 750.00 | 9,360.00 | 750.00 | 9,360.00 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.516 | MILE | 900.00 | 32,864.40 | 900.00 | 32,864.40 | 900.00 | 32,864.40 | | 0020 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 12 | EACH | 50.00 | 600.00 | 50.00 | 600.00 | 50.00 | 600.00 | | 0021 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 114 | EACH | 50.00 | 5,700.00 | 50.00 | 5,700.00 | 50.00 | 5,700.00 | | 0022 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 18 | EACH | 50.00 | 900.00 | 50.00 | 900.00 | 50.00 | 900.00 | | 0023 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 50.00 | 1,200.00 | 50.00 | 1,200.00 | 50.00 | 1,200.00 | | 0024 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 50.00 | 300.00 | 50.00 | 300.00 | 50.00 | 300.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 2.097 | MILE | 300.00 | 629.10 | 4,500.00 | 9,436.50 | 1,000.00 | 2,097.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.053 | MILE | 300.00 | 2,115.90 | 1,500.00 | 10,579.50 | 1,000.00 | 7,053.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 122,500.00 | 122,500.00 | 400,000.00 | 400,000.00 | | 0028 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 3.6 | SQFT | 110.00 | 396.00 | 100.00 | 360.00 | 100.00 | 360.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,300 | EACH | 7.00 | 9,100.00 | 6.50 | 8,450.00 | 6.50 | 8,450.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,515 | LNFT | 3.00 | 4,545.00 | 2.50 | 3,787.50 | 2.50 | 3,787.50 | | 0031 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 320 | LNFT | 11.00 | 3,520.00 | 10.00 | 3,200.00 | 10.00 | 3,200.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 240 | LNFT | 14.00 | 3,360.00 | 12.50 | 3,000.00 | 12.50 | 3,000.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.172 | MILE | 4,400.00 | 53,556.80 | 4,000.00 | 48,688.00 | 4,000.00 | 48,688.00 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.16 | MILE | 1,400.00 | 5,824.00 | 1,250.00 | 5,200.00 | 1,250.00 | 5,200.00 | | 0035 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.334 | MILE | 5,500.00 | 1,837.00 | 5,000.00 | 1,670.00 | 5,000.00 | 1,670.00 | | 0036 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 330.00 | 1,320.00 | 300.00 | 1,200.00 | 300.00 | 1,200.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 38 | EACH | 330.00 | 12,540.00 | 300.00 | 11,400.00 | 300.00 | 11,400.00 | | 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 330.00 | 1,980.00 | 300.00 | 1,800.00 | 300.00 | 1,800.00 | | 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 330.00 | 2,640.00 | 300.00 | 2,400.00 | 300.00 | 2,400.00 | | 0040 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 1 | EACH | 550.00 | 550.00 | 500.00 | 500.00 | 500.00 | 500.00 | | 0041 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 550.00 | 1,100.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0042 | 735-01-00100 | Mailboxes | 52 | EACH | 22.00 | 1,144.00 | 20.00 | 1,040.00 | 250.00 | 13,000.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 52 | EACH | 275.00 | 14,300.00 | 250.00 | 13,000.00 | 20.00 | 1,040.00 | | 0044 | 736-01-00100 | Trenching and Backfilling | 45 | LNFT | 18.00 | 810.00 | 16.00 | 720.00 | 15.93 | 716.85 | | 0045 | 736-09-00100 | Loop Detector | 768 | LNFT | 32.00 | 24,576.00 | 30.00 | 23,040.00 | 29.38 | 22,563.84 | | 0046 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 1,500.00 | 4,500.00 | 1,402.50 | 4,207.50 | 1,402.50 | 4,207.50 | | 0047 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 45 | LNFT | 7.00 | 315.00 | 6.50 | 292.50 | 6.35 | 285.75 | | 0048 | 737-06-00002 | Painted Islands | 22 | SQYD | 16.00 | 352.00 | 15.00 | 330.00 | 15.00 | 330.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,053,058.40 | | 4,091,525.70 | | 4,265,975.10 |
|