Proposal:H.014851.6
Parish:Ouachita
Routes:US 80
Description:US 80: 670 FT W LA 3249 - LA 617
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$4,358,714.56
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,257,452.69 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,704,250.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 3,000.00 | 3,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,613 | LNFT | 35.00 | 56,455.00 | 25.00 | 40,325.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 40 | SQYD | 30.00 | 1,200.00 | 30.00 | 1,200.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 127 | LNFT | 30.00 | 3,810.00 | 25.00 | 3,175.00 | | 0005 | 202-02-12020 | Removal of Fence (Chain Link) | 40 | LNFT | 200.00 | 8,000.00 | 15.00 | 600.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0007 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 15 | CUYD | 19.00 | 285.00 | 75.00 | 1,125.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 7,957.8 | TON | 175.00 | 1,392,615.00 | 185.00 | 1,472,193.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 90.5 | TON | 420.00 | 38,010.00 | 335.00 | 30,317.50 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 73,163 | SQYD | 5.00 | 365,815.00 | 5.75 | 420,687.25 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,046 | CUYD | 1.00 | -3,046.00 | 1.00 | -3,046.00 | | 0013 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 3,307 | SQYD | 185.00 | 611,795.00 | 240.00 | 793,680.00 | | 0014 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 18 | EACH | 5,500.00 | 99,000.00 | 5,500.00 | 99,000.00 | | 0015 | 702-04-00100 | Adjusting Manholes | 24 | EACH | 3,500.00 | 84,000.00 | 3,500.00 | 84,000.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 4,500.00 | 9,000.00 | 4,500.00 | 9,000.00 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 40 | SQYD | 130.00 | 5,200.00 | 165.00 | 6,600.00 | | 0018 | 707-01-00100 | Concrete Curb | 127 | LNFT | 80.00 | 10,160.00 | 45.00 | 5,715.00 | | 0019 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,562 | LNFT | 80.00 | 124,960.00 | 90.00 | 140,580.00 | | 0020 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 20 | CUYD | 275.00 | 5,500.00 | 500.00 | 10,000.00 | | 0021 | 711-01-02000 | Riprap (10 lb, 10" Thick) | 35 | SQYD | 165.00 | 5,775.00 | 175.00 | 6,125.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 5.00 | 175.00 | 5.00 | 175.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 450,000.00 | 450,000.00 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,436 | LNFT | 0.25 | 859.00 | 0.25 | 859.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.322 | MILE | 154.00 | 665.59 | 300.00 | 1,296.60 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.948 | MILE | 700.00 | 6,263.60 | 700.00 | 6,263.60 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.456 | MILE | 1,250.00 | 24,320.00 | 1,200.00 | 23,347.20 | | 0028 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 1 | EACH | 25.00 | 25.00 | 25.00 | 25.00 | | 0029 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 1 | EACH | 25.00 | 25.00 | 25.00 | 25.00 | | 0030 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 38 | EACH | 25.00 | 950.00 | 25.00 | 950.00 | | 0031 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 12 | EACH | 25.00 | 300.00 | 25.00 | 300.00 | | 0032 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 28 | EACH | 35.00 | 980.00 | 35.00 | 980.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 420,000.00 | 420,000.00 | 450,000.00 | 450,000.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,433 | EACH | 7.00 | 24,031.00 | 7.00 | 24,031.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,718 | LNFT | 5.00 | 8,590.00 | 5.00 | 8,590.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 553 | LNFT | 20.00 | 11,060.00 | 20.00 | 11,060.00 | | 0037 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 856 | LNFT | 3.00 | 2,568.00 | 4.00 | 3,424.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.728 | MILE | 5,500.00 | 53,504.00 | 6,500.00 | 63,232.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.474 | MILE | 1,250.00 | 5,592.50 | 1,500.00 | 6,711.00 | | 0040 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 500.00 | 500.00 | 600.00 | 600.00 | | 0041 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 500.00 | 500.00 | 650.00 | 650.00 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 500.00 | 9,500.00 | 600.00 | 11,400.00 | | 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 500.00 | 3,000.00 | 600.00 | 3,600.00 | | 0044 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 700.00 | 9,800.00 | 800.00 | 11,200.00 | | 0045 | 735-01-00100 | Mailboxes | 11 | EACH | 1.00 | 11.00 | 35.00 | 385.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 525.00 | 4,725.00 | 350.00 | 3,150.00 | | 0047 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 600.00 | 600.00 | 500.00 | 500.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 47,000.00 | 47,000.00 | 45,000.00 | 45,000.00 | | 0049 | 810-04-00100 | Hand Railing | 52 | LNFT | 175.00 | 9,100.00 | 400.00 | 20,800.00 | | 0050 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 41,587 | LNFT | 2.00 | 83,174.00 | 2.00 | 83,174.00 | | 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 34,389 | LNFT | 2.00 | 68,778.00 | 2.40 | 82,533.60 | | 0052 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 75,976 | LNFT | 1.25 | 94,970.00 | 1.50 | 113,964.00 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 892 | INLF | 1.00 | 892.00 | 4.00 | 3,568.00 | | 0054 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) | 8 | EACH | 10,000.00 | 80,000.00 | 10,000.00 | 80,000.00 | | 0055 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) | 2 | EACH | 7,500.00 | 15,000.00 | 10,000.00 | 20,000.00 | | 0056 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) | 1,740 | LNFT | 4.00 | 6,960.00 | 7.00 | 12,180.00 | | 0057 | NS-736-00124 | Signal Radar Vehicle Detection System (Training) | 1 | LUMP | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,257,452.69 | | 4,704,250.75 |
|