Proposal:H.014809.6
Parish:Cameron
Routes:LA 82
Description:LA 82: DYSON RD - 0.9 MI E OF N ISLAND RD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,391,645.96
| Rank | License | Bidder | Construction Bid |
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $8,291,904.95 |
| 2 | 34356 | Prairie Contractors LLC | $9,588,107.37 |
| 3 | 33663 | Glenn Lege Construction LLC | $11,421,617.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R. E. Heidt Construction Co., LLC | - 2 - Prairie Contractors LLC | - 3 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 298.7 | LNFT | 15.15 | 4,525.31 | 20.00 | 5,974.00 | 11.62 | 3,470.89 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP, 18" CMP, 24" RCP, 36" RCP | 637 | LNFT | 65.65 | 41,819.05 | 25.00 | 15,925.00 | 35.50 | 22,613.50 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 46 | CUYD | 350.00 | 16,100.00 | 300.00 | 13,800.00 | 75.00 | 3,450.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,081.9 | CUYD | 161.60 | 174,835.04 | 10.00 | 10,819.00 | 62.50 | 67,618.75 | | 0005 | 502-01-00100 | Asphalt Concrete | 27,356.4 | TON | 120.00 | 3,282,768.00 | 140.00 | 3,829,896.00 | 157.50 | 4,308,633.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,246.9 | TON | 148.00 | 184,541.20 | 125.00 | 155,862.50 | 167.50 | 208,855.75 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 138,385 | SQYD | 4.27 | 590,903.95 | 5.00 | 691,925.00 | 3.00 | 415,155.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,015 | CUYD | 0.01 | -70.15 | 0.01 | -70.15 | 0.10 | -701.50 | | 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 36 | SQYD | 120.00 | 4,320.00 | 250.00 | 9,000.00 | 89.00 | 3,204.00 | | 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 16,901 | SQYD | 105.00 | 1,774,605.00 | 130.00 | 2,197,130.00 | 151.38 | 2,558,473.38 | | 0011 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 336 | LNFT | 353.50 | 118,776.00 | 350.00 | 117,600.00 | 606.08 | 203,642.88 | | 0012 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 192 | LNFT | 515.10 | 98,899.20 | 425.00 | 81,600.00 | 1,069.46 | 205,336.32 | | 0013 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 136 | LNFT | 612.06 | 83,240.16 | 400.00 | 54,400.00 | 978.05 | 133,014.80 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 156.3 | LNFT | 40.40 | 6,314.52 | 50.00 | 7,815.00 | 68.22 | 10,662.79 | | 0015 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,141.00 | 16,564.00 | 5,500.00 | 22,000.00 | 4,472.52 | 17,890.08 | | 0016 | 710-01-00100 | Flowable Fill | 751 | CUYD | 309.06 | 232,104.06 | 285.00 | 214,035.00 | 207.00 | 155,457.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | 647,440.00 | 647,440.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 30 | MILE | 550.00 | 16,500.00 | 600.00 | 18,000.00 | 500.00 | 15,000.00 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 27.108 | MILE | 606.00 | 16,427.45 | 1.00 | 27.11 | 696.90 | 18,891.57 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 71.713 | MILE | 959.50 | 68,808.62 | 1.00 | 71.71 | 1,103.43 | 79,130.28 | | 0021 | 724-01-00100 | Rumble Strips (Centerline) | 9.931 | MILE | 1,010.00 | 10,030.31 | 1,100.00 | 10,924.10 | 818.86 | 8,132.10 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 19.861 | MILE | 1,010.00 | 20,059.61 | 1,100.00 | 21,847.10 | 818.86 | 16,263.38 | | 0023 | 726-01-00100 | Bedding Material | 157.4 | CUYD | 186.85 | 29,410.19 | 175.00 | 27,545.00 | 173.00 | 27,230.20 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 535,000.00 | 535,000.00 | 937,000.00 | 937,000.00 | 943,875.00 | 943,875.00 | | 0025 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 65.65 | 1,181.70 | 80.00 | 1,440.00 | 116.15 | 2,090.70 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 126.25 | 505.00 | 150.00 | 600.00 | 87.11 | 348.44 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,521 | EACH | 8.59 | 13,065.39 | 10.00 | 15,210.00 | 9.88 | 15,027.48 | | 0028 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 564 | LNFT | 2.28 | 1,285.92 | 2.75 | 1,551.00 | 2.62 | 1,477.68 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.904 | MILE | 6,514.50 | 155,722.61 | 7,000.00 | 167,328.00 | 7,491.68 | 179,081.12 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.036 | MILE | 3,004.75 | 27,150.92 | 3,750.00 | 33,885.00 | 3,455.46 | 31,223.54 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.069 | MILE | 10,958.50 | 756.14 | 13,000.00 | 897.00 | 12,602.28 | 869.56 | | 0032 | 735-01-00100 | Mailboxes | 35 | EACH | 1.01 | 35.35 | 10.00 | 350.00 | 1.16 | 40.60 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 29 | EACH | 308.05 | 8,933.45 | 375.00 | 10,875.00 | 220.69 | 6,400.01 | | 0034 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 308.05 | 924.15 | 375.00 | 1,125.00 | 336.84 | 1,010.52 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 47,722.50 | 47,722.50 | | 0036 | NS-300-00060 | Geogrid | 472 | SQYD | 15.15 | 7,150.80 | 15.00 | 7,080.00 | 6.00 | 2,832.00 | | 0037 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 5,926 | TON | 112.00 | 663,712.00 | 140.00 | 829,640.00 | 179.00 | 1,060,754.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,291,904.95 | | 9,588,107.37 | | 11,421,617.32 |
|