Proposal:H.014123.6
Parish:St. Helena
Routes:LA 1043
Description:LA 1043: LA 10 - LA 43
Type Construction:DRAINAGE STRUCTURES, IN-PLACE CEMENT TREATED BASE COURSE, ASPAHLT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,606,193.35
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $5,123,327.20 |
| 2 | 06276 | Barriere Construction Co., LLC | $5,248,970.35 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,655,986.85 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $6,124,986.56 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 492 | LNFT | 6.25 | 3,075.00 | 6.25 | 3,075.00 | 23.00 | 11,316.00 | 6.50 | 3,198.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (48" Equiv. CMPA) | 130 | LNFT | 40.00 | 5,200.00 | 50.00 | 6,500.00 | 39.00 | 5,070.00 | 50.00 | 6,500.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (90" Equiv. CMPA) | 72 | LNFT | 55.00 | 3,960.00 | 50.00 | 3,600.00 | 57.00 | 4,104.00 | 75.00 | 5,400.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 25.00 | 100.00 | 25.00 | 100.00 | 26.00 | 104.00 | 26.00 | 104.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,602 | CUYD | 26.00 | 41,652.00 | 8.50 | 13,617.00 | 64.00 | 102,528.00 | 40.00 | 64,080.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 600 | LNFT | 16.00 | 9,600.00 | 8.00 | 4,800.00 | 15.00 | 9,000.00 | 18.00 | 10,800.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 300.00 | 1,800.00 | 285.00 | 1,710.00 | 160.00 | 960.00 | 290.00 | 1,740.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 78,384 | LNFT | 1.30 | 101,899.20 | 1.85 | 145,010.40 | 1.90 | 148,929.60 | 2.00 | 156,768.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 2,227 | SQYD | 5.00 | 11,135.00 | 0.01 | 22.27 | 15.00 | 33,405.00 | 16.90 | 37,636.30 | | 0010 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 99,912 | SQYD | 12.25 | 1,223,922.00 | 10.00 | 999,120.00 | 11.00 | 1,099,032.00 | 12.20 | 1,218,926.40 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,903 | CUYD | 96.00 | 278,688.00 | 50.00 | 145,150.00 | 115.00 | 333,845.00 | 60.00 | 174,180.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 15.00 | 7,500.00 | 1.00 | 500.00 | 105.00 | 52,500.00 | 30.00 | 15,000.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 21,480 | TON | 82.00 | 1,761,360.00 | 108.00 | 2,319,840.00 | 116.00 | 2,491,680.00 | 118.00 | 2,534,640.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,093.3 | TON | 229.00 | 250,365.70 | 190.00 | 207,727.00 | 210.00 | 229,593.00 | 118.00 | 129,009.40 | | 0015 | 701-01-01180 | Cross Drain Pipe (96" RCP) | 76 | LNFT | 1,525.00 | 115,900.00 | 1,575.00 | 119,700.00 | 1,425.00 | 108,300.00 | 1,650.00 | 125,400.00 | | 0016 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 128 | LNFT | 500.00 | 64,000.00 | 420.00 | 53,760.00 | 415.00 | 53,120.00 | 425.00 | 54,400.00 | | 0017 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 140 | LNFT | 12.00 | 1,680.00 | 1.00 | 140.00 | 12.50 | 1,750.00 | 15.00 | 2,100.00 | | 0018 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 68.50 | 6,850.00 | 69.00 | 6,900.00 | 78.00 | 7,800.00 | 70.00 | 7,000.00 | | 0019 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 192 | LNFT | 155.00 | 29,760.00 | 156.00 | 29,952.00 | 105.00 | 20,160.00 | 160.00 | 30,720.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 162.5 | LNFT | 27.50 | 4,468.75 | 28.00 | 4,550.00 | 37.00 | 6,012.50 | 30.00 | 4,875.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,325.00 | 13,300.00 | 3,500.00 | 14,000.00 | 3,700.00 | 14,800.00 | 3,500.00 | 14,000.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 268,000.00 | 268,000.00 | 180,000.00 | 180,000.00 | 360,000.00 | 360,000.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 2.00 | 144.00 | 0.01 | 0.72 | 2.00 | 144.00 | 2.10 | 151.20 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.845 | MILE | 350.00 | 5,195.75 | 320.00 | 4,750.40 | 300.00 | 4,453.50 | 155.00 | 2,300.98 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.47 | MILE | 650.00 | 4,855.50 | 0.01 | 0.07 | 650.00 | 4,855.50 | 700.00 | 5,229.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 54.058 | MILE | 850.00 | 45,949.30 | 0.01 | 0.54 | 850.00 | 45,949.30 | 860.00 | 46,489.88 | | 0027 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 2,000.00 | 4,000.00 | 6,500.00 | 13,000.00 | 5,500.00 | 11,000.00 | 7,000.00 | 14,000.00 | | 0028 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 23,000.00 | 23,000.00 | 20,500.00 | 20,500.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | | 0029 | 726-01-00100 | Bedding Material | 45.3 | CUYD | 145.00 | 6,568.50 | 100.00 | 4,530.00 | 120.00 | 5,436.00 | 150.00 | 6,795.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 430,000.00 | 430,000.00 | 200,000.00 | 200,000.00 | 585,000.00 | 585,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 91.00 | 364.00 | 100.00 | 400.00 | 100.00 | 400.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,631 | EACH | 5.00 | 8,155.00 | 5.00 | 8,155.00 | 5.25 | 8,562.75 | 6.00 | 9,786.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 10.00 | 240.00 | 10.00 | 240.00 | 10.50 | 252.00 | 11.00 | 264.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.029 | MILE | 3,500.00 | 94,601.50 | 3,500.00 | 94,601.50 | 3,700.00 | 100,007.30 | 3,600.00 | 97,304.40 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.49 | MILE | 1,250.00 | 3,112.50 | 1,255.00 | 3,124.95 | 1,300.00 | 3,237.00 | 1,400.00 | 3,486.00 | | 0036 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.126 | MILE | 2,500.00 | 315.00 | 2,500.00 | 315.00 | 2,500.00 | 315.00 | 2,600.00 | 327.60 | | 0037 | 735-01-00100 | Mailboxes | 41 | EACH | 250.00 | 10,250.00 | 250.00 | 10,250.00 | 1.00 | 41.00 | 22.00 | 902.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 41 | EACH | 20.00 | 820.00 | 20.00 | 820.00 | 210.00 | 8,610.00 | 260.00 | 10,660.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 5.398 | ACRE | 2,750.00 | 14,844.50 | 2,750.00 | 14,844.50 | 2,800.00 | 15,114.40 | 3,300.00 | 17,813.40 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 11,000.00 | 11,000.00 | 25,000.00 | 25,000.00 | 56,000.00 | 56,000.00 | | 0041 | NS-701-00020 | Culvert Rehabilitation by Geopolymer Lining | 219 | LNFT | 1,300.00 | 284,700.00 | 1,300.00 | 284,700.00 | 1,400.00 | 306,600.00 | 1,400.00 | 306,600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,123,327.20 | | 5,248,970.35 | | 5,655,986.85 | | 6,124,986.56 |
|