Proposal:H.014093.6
Parish:Sabine
Routes:LA 6
Description:LA 6: US 171 TO NATCHITOCHES P.L.
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$14,824,688.54
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $21,388,784.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 2,480.9 | LNFT | 15.00 | 37,213.50 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 319 | CUYD | 63.25 | 20,176.75 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 520 | CUYD | 55.00 | 28,600.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 52,549.2 | TON | 154.65 | 8,126,733.78 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,376.9 | TON | 109.70 | 260,745.93 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 178,316 | SQYD | 4.81 | 857,699.96 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,535 | CUYD | 0.10 | -253.50 | | 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 10,066 | SQYD | 84.46 | 850,174.36 | | 0009 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 25,835 | SQYD | 291.70 | 7,536,069.50 | | 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 245 | LNFT | 8.60 | 2,107.00 | | 0011 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 17 | EACH | 2,650.00 | 45,050.00 | | 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 920 | LNFT | 71.00 | 65,320.00 | | 0013 | 704-03-00100 | Blocked Out Guard rail | 93.8 | LNFT | 42.00 | 3,939.60 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 687.5 | LNFT | 35.00 | 24,062.50 | | 0015 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 18.8 | LNFT | 160.00 | 3,008.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 130.00 | 52,000.00 | | 0017 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 13 | EACH | 3,750.00 | 48,750.00 | | 0018 | 707-04-00100 | Asphalt Curb | 216 | LNFT | 50.00 | 10,800.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,268,500.00 | 1,268,500.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 33.375 | MILE | 300.00 | 10,012.50 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 22.528 | MILE | 750.00 | 16,896.00 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 102.248 | MILE | 1,075.00 | 109,916.60 | | 0023 | 724-01-00100 | Rumble Strips (Centerline) | 9.367 | MILE | 1,000.00 | 9,367.00 | | 0024 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.006 | MILE | 1,000.00 | 10,006.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 1,268,500.00 | 1,268,500.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 125.00 | 2,000.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,401 | EACH | 8.50 | 20,408.50 | | 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 760 | LNFT | 4.00 | 3,040.00 | | 0029 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 492 | LNFT | 16.50 | 8,118.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 212 | LNFT | 17.50 | 3,710.00 | | 0031 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 295 | LNFT | 2.50 | 737.50 | | 0032 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 700 | LNFT | 2.50 | 1,750.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 36.551 | MILE | 6,800.00 | 248,546.80 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.509 | MILE | 2,950.00 | 22,151.55 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 425.00 | 4,250.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 425.00 | 425.00 | | 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 475.00 | 2,850.00 | | 0038 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 1,000.00 | 2,000.00 | | 0039 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 1,300.00 | 1,300.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 0.081 | MILE | 10,000.00 | 810.00 | | 0041 | 735-01-00100 | Mailboxes | 139 | EACH | 1.00 | 139.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 139 | EACH | 250.00 | 34,750.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | | 0044 | 741-35-00100 | Adjust Valve or Meter Box | 3 | EACH | 1,050.00 | 3,150.00 | | 0045 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 53,440 | LNFT | 1.34 | 71,609.60 | | 0046 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 34,681 | LNFT | 1.34 | 46,472.54 | | 0047 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 88,121 | LNFT | 1.08 | 95,170.68 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 21,388,784.65 |
|