Proposal:H.012057.6
Parish:Assumption
Routes:LA 431
Description:LA 431: VILLAR CANAL AND DRAINAGE BRIDGES
Type Construction:CLEARING AND GRUBBING, EARTHWORK, REMOVAL OF BRIDGES, CLASS II BASE COURSE, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE, TEMPORARY DETOUR ROADS, PRECAST CONCRETE PILES, SLAB SPAN BRIDGES, TEMPORARY DETOUR BRIDGE; AND RELATED WORK.
Estimated Construction Cost:$8,568,281.64
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $6,662,629.22 |
| 2 | 00009 | Coastal Contractors, LLC | $8,117,471.22 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $8,513,408.43 |
| 4 | 28190 | Buck Town Contractors & Co. | $9,504,484.62 |
| 5 | 44187 | RNGD Infrastructure LLC | $9,905,617.99 |
| 6 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $9,975,086.50 |
| 7 | 34567 | James Construction Group LLC | $11,652,267.92 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Coastal Contractors, LLC | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.28 | LUMP | 720,000.00 | 720,000.00 | 300,000.00 | 300,000.00 | 400,000.00 | 400,000.00 | 170,000.00 | 170,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,500.00 | 12,500.00 | 30,000.00 | 30,000.00 | 15,600.00 | 15,600.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,312 | SQYD | 5.50 | 12,716.00 | 50.00 | 115,600.00 | 75.00 | 173,400.00 | 15.00 | 34,680.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 610302670209481, 58' x 31.3' | 1,815 | LUMP | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | 60,500.00 | 60,500.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 610302670209621, 57' x 31.3' | 1,784 | LUMP | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | 59,000.00 | 59,000.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 71.8 | LNFT | 10.00 | 718.00 | 20.00 | 1,436.00 | 50.00 | 3,590.00 | 5.00 | 359.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 957.6 | LNFT | 7.00 | 6,703.20 | 7.00 | 6,703.20 | 8.00 | 7,660.80 | 10.00 | 9,576.00 | | 0008 | 202-03-38000 | Relocation of Sign | 1 | EACH | 250.00 | 250.00 | 450.00 | 450.00 | 225.00 | 225.00 | 50.00 | 50.00 | | 0009 | 203-01-00100 | General Excavation | 202 | CUYD | 25.00 | 5,050.00 | 50.00 | 10,100.00 | 320.00 | 64,640.00 | 25.00 | 5,050.00 | | 0010 | 203-02-00100 | Drainage Excavation | 291 | CUYD | 24.00 | 6,984.00 | 45.00 | 13,095.00 | 80.00 | 23,280.00 | 25.00 | 7,275.00 | | 0011 | 203-03-00100 | Embankment | 6,717 | CUYD | 32.00 | 214,944.00 | 55.00 | 369,435.00 | 55.00 | 369,435.00 | 67.00 | 450,039.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 3,680 | LNFT | 2.80 | 10,304.00 | 3.00 | 11,040.00 | 7.00 | 25,760.00 | 1.00 | 3,680.00 | | 0013 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 2,464.5 | SQYD | 42.00 | 103,509.00 | 50.00 | 123,225.00 | 40.00 | 98,580.00 | 47.00 | 115,831.50 | | 0014 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 130 | SQYD | 125.00 | 16,250.00 | 150.00 | 19,500.00 | 85.00 | 11,050.00 | 233.00 | 30,290.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 1,716.1 | TON | 155.00 | 265,995.50 | 180.00 | 308,898.00 | 154.00 | 264,279.40 | 191.00 | 327,775.10 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 344.9 | TON | 225.00 | 77,602.50 | 250.00 | 86,225.00 | 220.00 | 75,878.00 | 264.00 | 91,053.60 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 6,610 | SQYD | 5.00 | 33,050.00 | 5.25 | 34,702.50 | 4.50 | 29,745.00 | 3.50 | 23,135.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -243 | CUYD | 0.01 | -2.43 | 0.01 | -2.43 | 0.01 | -2.43 | 0.01 | -2.43 | | 0019 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 153 | SQYD | 225.00 | 34,425.00 | 260.00 | 39,780.00 | 224.00 | 34,272.00 | 203.00 | 31,059.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,075 | LNFT | 28.00 | 30,100.00 | 32.00 | 34,400.00 | 28.00 | 30,100.00 | 30.00 | 32,250.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 110.00 | 22,000.00 | 127.00 | 25,400.00 | 108.00 | 21,600.00 | 145.00 | 29,000.00 | | 0022 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,000.00 | 24,000.00 | 3,500.00 | 28,000.00 | 3,000.00 | 24,000.00 | 4,000.00 | 32,000.00 | | 0023 | 707-01-00100 | Concrete Curb | 23 | LNFT | 50.00 | 1,150.00 | 320.00 | 7,360.00 | 160.00 | 3,680.00 | 30.00 | 690.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 650.00 | 10,400.00 | 715.00 | 11,440.00 | 600.00 | 9,600.00 | 600.00 | 9,600.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 16 | EACH | 250.00 | 4,000.00 | 225.00 | 3,600.00 | 200.00 | 3,200.00 | 220.00 | 3,520.00 | | 0026 | 712-04-00100 | Flexible Revetment | 933 | SQYD | 80.00 | 74,640.00 | 116.00 | 108,228.00 | 110.00 | 102,630.00 | 83.00 | 77,439.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 105,000.00 | 105,000.00 | 400,000.00 | 400,000.00 | 55,500.00 | 55,500.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.151 | MILE | 1,100.00 | 2,366.10 | 3,250.00 | 6,990.75 | 1,205.00 | 2,591.96 | 1,150.00 | 2,473.65 | | 0029 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 626 | EACH | 11.00 | 6,886.00 | 12.00 | 7,512.00 | 5.00 | 3,130.00 | 11.50 | 7,199.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 85,000.00 | 85,000.00 | 40,000.00 | 40,000.00 | 43,000.00 | 43,000.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.931 | MILE | 350.00 | 325.85 | 350.00 | 325.85 | 300.00 | 279.30 | 2,500.00 | 2,327.50 | | 0032 | 725-01-00100 | Temporary Detour Roads | 4,853.5 | SQYD | 230.00 | 1,116,305.00 | 300.00 | 1,456,050.00 | 280.00 | 1,358,980.00 | 325.00 | 1,577,387.50 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 660,000.00 | 660,000.00 | 450,000.00 | 450,000.00 | 800,000.00 | 800,000.00 | 190,000.00 | 190,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 105.00 | 840.00 | 95.00 | 760.00 | 300.00 | 2,400.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 66 | EACH | 26.00 | 1,716.00 | 15.00 | 990.00 | 8.00 | 528.00 | 30.00 | 1,980.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.991 | MILE | 10,000.00 | 9,910.00 | 9,050.00 | 8,968.55 | 5,500.00 | 5,450.50 | 11,400.00 | 11,297.40 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.104 | MILE | 5,000.00 | 520.00 | 2,300.00 | 239.20 | 2,900.00 | 301.60 | 5,300.00 | 551.20 | | 0038 | 732-05-00100 | Removal of Existing Markings | 1.173 | MILE | 7,500.00 | 8,797.50 | 14,600.00 | 17,125.80 | 6,000.00 | 7,038.00 | 8,500.00 | 9,970.50 | | 0039 | 739-01-00100 | Hydro-Seeding | 1.191 | ACRE | 3,000.00 | 3,573.00 | 4,800.00 | 5,716.80 | 2,800.00 | 3,334.80 | 4,100.00 | 4,883.10 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 90,000.00 | 90,000.00 | 400,000.00 | 400,000.00 | 32,000.00 | 32,000.00 | | 0041 | 804-01-00600 | Precast Concrete Piles (24") | 2,484 | LNFT | 220.00 | 546,480.00 | 240.00 | 596,160.00 | 320.00 | 794,880.00 | 298.00 | 740,232.00 | | 0042 | 805-01-00100 | Class A1 Concrete (Slab Span) | 239.4 | CUYD | 1,400.00 | 335,160.00 | 3,100.00 | 742,140.00 | 2,000.00 | 478,800.00 | 2,500.00 | 598,500.00 | | 0043 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 101.58 | CUYD | 2,500.00 | 253,950.00 | 3,500.00 | 355,530.00 | 3,000.00 | 304,740.00 | 3,300.00 | 335,214.00 | | 0044 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,228 | SQFT | 2.00 | 4,456.00 | 2.50 | 5,570.00 | 1.50 | 3,342.00 | 1.00 | 2,228.00 | | 0045 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,228 | SQFT | 3.00 | 6,684.00 | 3.25 | 7,241.00 | 2.00 | 4,456.00 | 1.00 | 2,228.00 | | 0046 | 806-01-00100 | Deformed Reinforcing Steel | 60,532 | LB | 1.75 | 105,931.00 | 2.00 | 121,064.00 | 2.00 | 121,064.00 | 1.00 | 60,532.00 | | 0047 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 320 | LNFT | 290.00 | 92,800.00 | 275.00 | 88,000.00 | 309.00 | 98,880.00 | 280.00 | 89,600.00 | | 0048 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 4,800 | SQFT | 120.00 | 576,000.00 | 165.00 | 792,000.00 | 125.00 | 600,000.00 | 110.00 | 528,000.00 | | 0049 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 192 | SFIN | 120.00 | 23,040.00 | 115.00 | 22,080.00 | 170.00 | 32,640.00 | 200.00 | 38,400.00 | | 0050 | 815-03-00300 | Joint Seal (Poured) | 300 | LNFT | 16.00 | 4,800.00 | 50.00 | 15,000.00 | 31.00 | 9,300.00 | 5.00 | 1,500.00 | | 0051 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 3,200 | SQFT | 250.00 | 800,000.00 | 310.00 | 992,000.00 | 200.00 | 640,000.00 | 1,040.00 | 3,328,000.00 | | 0052 | 822-15-02100 | Relocate Light Poles | 1 | EACH | 20,000.00 | 20,000.00 | 6,000.00 | 6,000.00 | 11,000.00 | 11,000.00 | 11,000.00 | 11,000.00 | | 0053 | NS-203-00004 | Channel Excavation (Theoretical Measurement) | 1,928 | CUYD | 16.00 | 30,848.00 | 35.00 | 67,480.00 | 70.00 | 134,960.00 | 25.00 | 48,200.00 | | 0054 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 360 | LNFT | 6.00 | 2,160.00 | 17.00 | 6,120.00 | 3.25 | 1,170.00 | 5.00 | 1,800.00 | | 0055 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 601 | LNFT | 6.00 | 3,606.00 | 8.00 | 4,808.00 | 1.50 | 901.50 | 5.00 | 3,005.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 38,226 | INLF | 1.00 | 38,226.00 | 4.00 | 152,904.00 | 3.00 | 114,678.00 | 1.00 | 38,226.00 | | 0057 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 4 | EACH | 30,000.00 | 120,000.00 | 35,000.00 | 140,000.00 | 12,000.00 | 48,000.00 | 32,000.00 | 128,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,662,629.22 | | 8,117,471.22 | | 8,513,408.43 | | 9,504,484.62 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - RNGD Infrastructure LLC | - 6 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 7 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.28 | LUMP | 165,000.00 | 165,000.00 | 1,250,000.00 | 1,250,000.00 | 800,000.00 | 800,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 13,000.00 | 13,000.00 | 150,000.00 | 150,000.00 | 23,675.00 | 23,675.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,312 | SQYD | 6.50 | 15,028.00 | 20.00 | 46,240.00 | 95.00 | 219,640.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 610302670209481, 58' x 31.3' | 1,815 | LUMP | 45,000.00 | 45,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 610302670209621, 57' x 31.3' | 1,784 | LUMP | 55,000.00 | 55,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 71.8 | LNFT | 14.50 | 1,041.10 | 25.00 | 1,795.00 | 100.00 | 7,180.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 957.6 | LNFT | 11.00 | 10,533.60 | 7.00 | 6,703.20 | 6.00 | 5,745.60 | | 0008 | 202-03-38000 | Relocation of Sign | 1 | EACH | 1,720.00 | 1,720.00 | 400.00 | 400.00 | 350.00 | 350.00 | | 0009 | 203-01-00100 | General Excavation | 202 | CUYD | 96.00 | 19,392.00 | 25.00 | 5,050.00 | 50.00 | 10,100.00 | | 0010 | 203-02-00100 | Drainage Excavation | 291 | CUYD | 100.00 | 29,100.00 | 55.00 | 16,005.00 | 120.00 | 34,920.00 | | 0011 | 203-03-00100 | Embankment | 6,717 | CUYD | 60.00 | 403,020.00 | 50.00 | 335,850.00 | 100.00 | 671,700.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 3,680 | LNFT | 4.00 | 14,720.00 | 5.00 | 18,400.00 | 5.00 | 18,400.00 | | 0013 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 2,464.5 | SQYD | 56.00 | 138,012.00 | 55.00 | 135,547.50 | 40.00 | 98,580.00 | | 0014 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 130 | SQYD | 56.00 | 7,280.00 | 225.00 | 29,250.00 | 50.00 | 6,500.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 1,716.1 | TON | 212.00 | 363,813.20 | 165.00 | 283,156.50 | 164.00 | 281,440.40 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 344.9 | TON | 303.00 | 104,504.70 | 230.00 | 79,327.00 | 226.00 | 77,947.40 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 6,610 | SQYD | 5.00 | 33,050.00 | 5.00 | 33,050.00 | 8.00 | 52,880.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -243 | CUYD | 0.01 | -2.43 | 1.00 | -243.00 | 0.01 | -2.43 | | 0019 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 153 | SQYD | 309.00 | 47,277.00 | 250.00 | 38,250.00 | 174.00 | 26,622.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,075 | LNFT | 39.00 | 41,925.00 | 30.00 | 32,250.00 | 27.50 | 29,562.50 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 150.00 | 30,000.00 | 110.00 | 22,000.00 | 106.50 | 21,300.00 | | 0022 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 4,200.00 | 33,600.00 | 3,100.00 | 24,800.00 | 2,950.00 | 23,600.00 | | 0023 | 707-01-00100 | Concrete Curb | 23 | LNFT | 94.00 | 2,162.00 | 200.00 | 4,600.00 | 200.00 | 4,600.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 700.00 | 11,200.00 | 650.00 | 10,400.00 | 600.00 | 9,600.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 16 | EACH | 960.00 | 15,360.00 | 250.00 | 4,000.00 | 200.00 | 3,200.00 | | 0026 | 712-04-00100 | Flexible Revetment | 933 | SQYD | 118.00 | 110,094.00 | 120.00 | 111,960.00 | 175.00 | 163,275.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 192,000.00 | 192,000.00 | 300,000.00 | 300,000.00 | 175,000.00 | 175,000.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.151 | MILE | 1,720.00 | 3,699.72 | 1,300.00 | 2,796.30 | 1,250.00 | 2,688.75 | | 0029 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 626 | EACH | 14.00 | 8,764.00 | 11.00 | 6,886.00 | 10.00 | 6,260.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 137,000.00 | 137,000.00 | 125,000.00 | 125,000.00 | 53,000.00 | 53,000.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.931 | MILE | 30,000.00 | 27,930.00 | 2,500.00 | 2,327.50 | 300.00 | 279.30 | | 0032 | 725-01-00100 | Temporary Detour Roads | 4,853.5 | SQYD | 421.00 | 2,043,323.50 | 425.00 | 2,062,737.50 | 630.00 | 3,057,705.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 950,000.00 | 950,000.00 | 995,000.00 | 995,000.00 | 1,165,000.00 | 1,165,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 117.00 | 936.00 | 90.00 | 720.00 | 85.00 | 680.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 66 | EACH | 14.00 | 924.00 | 13.00 | 858.00 | 12.50 | 825.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.991 | MILE | 10,300.00 | 10,207.30 | 7,600.00 | 7,531.60 | 7,500.00 | 7,432.50 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.104 | MILE | 2,800.00 | 291.20 | 2,100.00 | 218.40 | 1,925.00 | 200.20 | | 0038 | 732-05-00100 | Removal of Existing Markings | 1.173 | MILE | 17,200.00 | 20,175.60 | 25,000.00 | 29,325.00 | 12,500.00 | 14,662.50 | | 0039 | 739-01-00100 | Hydro-Seeding | 1.191 | ACRE | 5,500.00 | 6,550.50 | 3,000.00 | 3,573.00 | 2,800.00 | 3,334.80 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 126,000.00 | 126,000.00 | 300,000.00 | 300,000.00 | 240,000.00 | 240,000.00 | | 0041 | 804-01-00600 | Precast Concrete Piles (24") | 2,484 | LNFT | 551.00 | 1,368,684.00 | 225.00 | 558,900.00 | 237.00 | 588,708.00 | | 0042 | 805-01-00100 | Class A1 Concrete (Slab Span) | 239.4 | CUYD | 2,600.00 | 622,440.00 | 2,000.00 | 478,800.00 | 2,570.00 | 615,258.00 | | 0043 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 101.58 | CUYD | 2,900.00 | 294,582.00 | 3,000.00 | 304,740.00 | 4,850.00 | 492,663.00 | | 0044 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,228 | SQFT | 5.00 | 11,140.00 | 3.00 | 6,684.00 | 2.50 | 5,570.00 | | 0045 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,228 | SQFT | 8.00 | 17,824.00 | 4.00 | 8,912.00 | 3.50 | 7,798.00 | | 0046 | 806-01-00100 | Deformed Reinforcing Steel | 60,532 | LB | 3.00 | 181,596.00 | 2.00 | 121,064.00 | 2.00 | 121,064.00 | | 0047 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 320 | LNFT | 300.00 | 96,000.00 | 350.00 | 112,000.00 | 475.00 | 152,000.00 | | 0048 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 4,800 | SQFT | 94.00 | 451,200.00 | 125.00 | 600,000.00 | 160.00 | 768,000.00 | | 0049 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 192 | SFIN | 90.00 | 17,280.00 | 125.00 | 24,000.00 | 175.00 | 33,600.00 | | 0050 | 815-03-00300 | Joint Seal (Poured) | 300 | LNFT | 28.00 | 8,400.00 | 45.00 | 13,500.00 | 30.00 | 9,000.00 | | 0051 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 3,200 | SQFT | 367.00 | 1,174,400.00 | 250.00 | 800,000.00 | 350.00 | 1,120,000.00 | | 0052 | 822-15-02100 | Relocate Light Poles | 1 | EACH | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 10,630.00 | 10,630.00 | | 0053 | NS-203-00004 | Channel Excavation (Theoretical Measurement) | 1,928 | CUYD | 100.00 | 192,800.00 | 40.00 | 77,120.00 | 25.00 | 48,200.00 | | 0054 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 360 | LNFT | 25.00 | 9,000.00 | 16.00 | 5,760.00 | 18.00 | 6,480.00 | | 0055 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 601 | LNFT | 14.00 | 8,414.00 | 16.00 | 9,616.00 | 10.00 | 6,010.00 | | 0056 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 38,226 | INLF | 1.00 | 38,226.00 | 1.00 | 38,226.00 | 0.90 | 34,403.40 | | 0057 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 4 | EACH | 40,000.00 | 160,000.00 | 35,000.00 | 140,000.00 | 28,750.00 | 115,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,905,617.99 | | 9,975,086.50 | | 11,652,267.92 |
|