Proposal:H.011564.6
Parish:Franklin
Routes:LA 857
Description:LA 857: LA 15 - LA 132
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, CONCRETE WALKS, AND RELATED WORK.
Estimated Construction Cost:$2,809,836.06
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,760,635.92 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $2,924,990.00 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,722,354.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 0.080 ACRES | 1 | LUMP | 9,000.00 | 9,000.00 | 5,000.00 | 5,000.00 | 71,000.00 | 71,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 510 | SQYD | 23.00 | 11,730.00 | 12.00 | 6,120.00 | 15.00 | 7,650.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 993 | SQYD | 30.00 | 29,790.00 | 18.00 | 17,874.00 | 25.00 | 24,825.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 452 | LNFT | 15.00 | 6,780.00 | 20.00 | 9,040.00 | 10.00 | 4,520.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 35 | LNFT | 15.00 | 525.00 | 16.00 | 560.00 | 145.00 | 5,075.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 18" & 24" CMP | 240 | LNFT | 15.00 | 3,600.00 | 16.00 | 3,840.00 | 145.00 | 34,800.00 | | 0007 | 203-02-00100 | Drainage Excavation | 114 | CUYD | 45.00 | 5,130.00 | 24.00 | 2,736.00 | 65.00 | 7,410.00 | | 0008 | 203-03-00100 | Embankment | 200 | CUYD | 18.00 | 3,600.00 | 30.00 | 6,000.00 | 50.00 | 10,000.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 460 | CUYD | 45.00 | 20,700.00 | 25.00 | 11,500.00 | 50.00 | 23,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,042 | LNFT | 2.50 | 2,605.00 | 3.00 | 3,126.00 | 4.00 | 4,168.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,547 | CUYD | 100.00 | 154,700.00 | 75.00 | 116,025.00 | 115.00 | 177,905.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 142.1 | CUYD | 105.00 | 14,920.50 | 100.00 | 14,210.00 | 125.00 | 17,762.50 | | 0013 | 502-01-00100 | Asphalt Concrete | 6,261.5 | TON | 125.00 | 782,687.50 | 165.00 | 1,033,147.50 | 170.00 | 1,064,455.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,035.5 | TON | 215.00 | 222,632.50 | 165.00 | 170,857.50 | 250.00 | 258,875.00 | | 0015 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 17,438 | GAL | 5.00 | 87,190.00 | 4.60 | 80,214.80 | 4.50 | 78,471.00 | | 0016 | 507-02-00300 | Aggregate (S3) | 56,248 | SQYD | 2.00 | 112,496.00 | 2.25 | 126,558.00 | 1.65 | 92,809.20 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 55,965 | SQYD | 1.50 | 83,947.50 | 3.00 | 167,895.00 | 4.00 | 223,860.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,175 | CUYD | 1.00 | -1,175.00 | 1.00 | -1,175.00 | 1.00 | -1,175.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 300 | SQYD | 185.00 | 55,500.00 | 240.00 | 72,000.00 | 200.00 | 60,000.00 | | 0020 | 510-02-00100 | Pavement Widening 12" MINIMUM THICKNESS | 283.3 | SQYD | 245.00 | 69,408.50 | 200.00 | 56,660.00 | 300.00 | 84,990.00 | | 0021 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 40 | LNFT | 255.00 | 10,200.00 | 300.00 | 12,000.00 | 260.00 | 10,400.00 | | 0022 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 40 | LNFT | 300.00 | 12,000.00 | 315.00 | 12,600.00 | 350.00 | 14,000.00 | | 0023 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 40 | LNFT | 115.00 | 4,600.00 | 165.00 | 6,600.00 | 160.00 | 6,400.00 | | 0024 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 306 | LNFT | 125.00 | 38,250.00 | 215.00 | 65,790.00 | 170.00 | 52,020.00 | | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 419 | LNFT | 145.00 | 60,755.00 | 250.00 | 104,750.00 | 220.00 | 92,180.00 | | 0026 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 84 | LNFT | 145.00 | 12,180.00 | 260.00 | 21,840.00 | 185.00 | 15,540.00 | | 0027 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 180 | LNFT | 120.00 | 21,600.00 | 200.00 | 36,000.00 | 140.00 | 25,200.00 | | 0028 | 701-07-00300 | Yard Drain Pipe (8") | 40 | LNFT | 105.00 | 4,200.00 | 75.00 | 3,000.00 | 106.00 | 4,240.00 | | 0029 | 701-13-01080 | Corrugated Metal Pipe Arch (Extension) (36" Equiv.) | 8 | LNFT | 355.00 | 2,840.00 | 300.00 | 2,400.00 | 566.00 | 4,528.00 | | 0030 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,500.00 | 2,500.00 | 1,600.00 | 1,600.00 | 2,800.00 | 2,800.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 8,500.00 | 59,500.00 | 7,000.00 | 49,000.00 | 8,000.00 | 56,000.00 | | 0032 | 702-03-00400 | Catch Basins (CB-05) | 4 | EACH | 1,500.00 | 6,000.00 | 5,000.00 | 20,000.00 | 6,000.00 | 24,000.00 | | 0033 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 341 | LNFT | 175.00 | 59,675.00 | 185.00 | 63,085.00 | 160.00 | 54,560.00 | | 0034 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 40.00 | 2,000.00 | 40.00 | 2,000.00 | 40.00 | 2,000.00 | | 0035 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,700.00 | 11,100.00 | 4,000.00 | 12,000.00 | 4,000.00 | 12,000.00 | | 0036 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,750.00 | 3,750.00 | 4,200.00 | 4,200.00 | 3,500.00 | 3,500.00 | | 0037 | 706-01-00100 | Concrete Walk (4" Thick) | 684 | SQYD | 95.00 | 64,980.00 | 100.00 | 68,400.00 | 100.00 | 68,400.00 | | 0038 | 706-02-00200 | Concrete Drive (6" Thick) | 886.4 | SQYD | 95.00 | 84,208.00 | 145.00 | 128,528.00 | 120.00 | 106,368.00 | | 0039 | 706-03-00750 | Incidental Concrete Paving (11" Thick) | 13.2 | SQYD | 200.00 | 2,640.00 | 220.00 | 2,904.00 | 500.00 | 6,600.00 | | 0040 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 100.00 | 5,400.00 | 75.00 | 4,050.00 | 100.00 | 5,400.00 | | 0041 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 89 | SQYD | 200.00 | 17,800.00 | 135.00 | 12,015.00 | 350.00 | 31,150.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 89 | SQYD | 5.00 | 445.00 | 5.00 | 445.00 | 4.00 | 356.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 35,000.00 | 35,000.00 | 150,000.00 | 150,000.00 | | 0044 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.556 | MILE | 154.00 | 1,471.62 | 300.00 | 2,866.80 | 250.00 | 2,389.00 | | 0045 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.376 | MILE | 650.00 | 7,394.40 | 700.00 | 7,963.20 | 700.00 | 7,963.20 | | 0046 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.284 | MILE | 850.00 | 34,241.40 | 1,200.00 | 48,340.80 | 900.00 | 36,255.60 | | 0047 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,257 | EACH | 4.00 | 5,028.00 | 4.00 | 5,028.00 | 3.00 | 3,771.00 | | 0048 | 716-01-00100 | Mulch (Vegetative) | 1.4 | TON | 1,500.00 | 2,100.00 | 1,000.00 | 1,400.00 | 1,600.00 | 2,240.00 | | 0049 | 717-01-00100 | Seeding | 43 | LB | 25.00 | 1,075.00 | 20.00 | 860.00 | 30.00 | 1,290.00 | | 0050 | 718-01-00100 | Fertilizer | 710 | LB | 0.70 | 497.00 | 1.00 | 710.00 | 0.75 | 532.50 | | 0051 | 726-01-00100 | Bedding Material | 140.6 | CUYD | 165.00 | 23,199.00 | 120.00 | 16,872.00 | 200.00 | 28,120.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 270,000.00 | 270,000.00 | 100,000.00 | 100,000.00 | 372,000.00 | 372,000.00 | | 0053 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 115.00 | 460.00 | 135.00 | 540.00 | 60.00 | 240.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 145.00 | 580.00 | 100.00 | 400.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 744 | EACH | 6.00 | 4,464.00 | 7.00 | 5,208.00 | 7.00 | 5,208.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.428 | MILE | 3,500.00 | 46,998.00 | 5,800.00 | 77,882.40 | 3,600.00 | 48,340.80 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.792 | MILE | 1,000.00 | 3,792.00 | 1,500.00 | 5,688.00 | 1,100.00 | 4,171.20 | | 0058 | 735-01-00100 | Mailboxes | 53 | EACH | 25.00 | 1,325.00 | 35.00 | 1,855.00 | 30.00 | 1,590.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 47 | EACH | 200.00 | 9,400.00 | 350.00 | 16,450.00 | 210.00 | 9,870.00 | | 0060 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 300.00 | 900.00 | 450.00 | 1,350.00 | 310.00 | 930.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 28,000.00 | 28,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0062 | NS-700-00100 | Trench Drains | 4 | EACH | 3,100.00 | 12,400.00 | 1,500.00 | 6,000.00 | 6,000.00 | 24,000.00 | | 0063 | NS-719-00002 | Tree Trimming APPROXIMATELY 6.140 ACRES | 1 | LUMP | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 125,000.00 | 125,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,760,635.92 | | 2,924,990.00 | | 3,722,354.00 |
|