Proposal:H.015558.6
Parish:St. James
Routes:LA 44
Description:LA 44: LA 3274 - 0.5 MI W OF LA 642
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,800,391.90
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,497,112.45 |
| 2 | 73475 | Madden Gulf Coast, LLC | $2,628,184.19 |
| 3 | 06276 | Barriere Construction Co., LLC | $2,725,223.11 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $3,081,531.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Madden Gulf Coast, LLC | - 3 - Barriere Construction Co., LLC | - 4 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 900.00 | 1,800.00 | 885.00 | 1,770.00 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 14 | SQYD | 26.00 | 364.00 | 25.00 | 350.00 | 55.00 | 770.00 | 25.00 | 350.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 143 | LNFT | 28.00 | 4,004.00 | 35.00 | 5,005.00 | 38.00 | 5,434.00 | 40.00 | 5,720.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 488 | CUYD | 65.00 | 31,720.00 | 127.00 | 61,976.00 | 148.00 | 72,224.00 | 150.00 | 73,200.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 300 | LNFT | 13.00 | 3,900.00 | 12.00 | 3,600.00 | 11.00 | 3,300.00 | 12.50 | 3,750.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 3.00 | 1,800.00 | 3.00 | 1,800.00 | 6.00 | 3,600.00 | 3.50 | 2,100.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 660 | CUYD | 100.00 | 66,000.00 | 129.00 | 85,140.00 | 150.00 | 99,000.00 | 166.50 | 109,890.00 | | 0008 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 125.00 | 5,000.00 | 100.00 | 4,000.00 | 350.00 | 14,000.00 | 100.00 | 4,000.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 13,644.5 | TON | 118.00 | 1,610,051.00 | 111.00 | 1,514,539.50 | 111.00 | 1,514,539.50 | 127.00 | 1,732,851.50 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 434.4 | TON | 166.00 | 72,110.40 | 287.00 | 124,672.80 | 350.00 | 152,040.00 | 292.00 | 126,844.80 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 64,091 | SQYD | 2.75 | 176,250.25 | 2.00 | 128,182.00 | 3.25 | 208,295.75 | 3.00 | 192,273.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,731 | CUYD | 0.00 | 0.00 | 0.01 | -27.31 | 0.10 | -273.10 | 0.01 | -27.31 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,014 | SQYD | 128.00 | 129,792.00 | 128.00 | 129,792.00 | 114.00 | 115,596.00 | 126.00 | 127,764.00 | | 0014 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 144 | LNFT | 220.00 | 31,680.00 | 212.00 | 30,528.00 | 289.00 | 41,616.00 | 240.00 | 34,560.00 | | 0015 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 5,500.00 | 11,000.00 | 5,300.00 | 10,600.00 | 5,950.00 | 11,900.00 | 5,500.00 | 11,000.00 | | 0016 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 5 | EACH | 300.00 | 1,500.00 | 350.00 | 1,750.00 | 137.85 | 689.25 | 300.00 | 1,500.00 | | 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 4.4 | SQYD | 275.00 | 1,210.00 | 250.00 | 1,100.00 | 350.00 | 1,540.00 | 250.00 | 1,100.00 | | 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 10 | SQYD | 200.00 | 2,000.00 | 125.00 | 1,250.00 | 350.00 | 3,500.00 | 130.00 | 1,300.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 110,000.00 | 110,000.00 | 231,000.00 | 231,000.00 | 262,000.00 | 262,000.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.356 | MILE | 300.00 | 1,306.80 | 350.00 | 1,524.60 | 1,880.00 | 8,189.28 | 400.00 | 1,742.40 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.735 | MILE | 700.00 | 2,614.50 | 700.00 | 2,614.50 | 700.00 | 2,614.50 | 825.00 | 3,081.38 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.534 | MILE | 1,000.00 | 11,534.00 | 1,000.00 | 11,534.00 | 1,000.00 | 11,534.00 | 1,500.00 | 17,301.00 | | 0023 | 724-01-00100 | Rumble Strips (Centerline) | 4.356 | MILE | 325.00 | 1,415.70 | 1,000.00 | 4,356.00 | 265.00 | 1,154.34 | 320.00 | 1,393.92 | | 0024 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.712 | MILE | 325.00 | 2,831.40 | 1,000.00 | 8,712.00 | 265.00 | 2,308.68 | 300.00 | 2,613.60 | | 0025 | 726-01-00100 | Bedding Material | 56.7 | CUYD | 115.00 | 6,520.50 | 110.00 | 6,237.00 | 110.00 | 6,237.00 | 120.00 | 6,804.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 255,000.00 | 255,000.00 | 116,000.00 | 116,000.00 | 262,000.00 | 262,000.00 | | 0027 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 80.00 | 480.00 | 450.00 | 2,700.00 | 900.00 | 5,400.00 | 85.00 | 510.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,317 | EACH | 6.00 | 7,902.00 | 5.00 | 6,585.00 | 5.00 | 6,585.00 | 11.00 | 14,487.00 | | 0029 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 126 | LNFT | 19.00 | 2,394.00 | 18.00 | 2,268.00 | 18.00 | 2,268.00 | 17.00 | 2,142.00 | | 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.534 | MILE | 5,100.00 | 58,823.40 | 4,900.00 | 56,516.60 | 4,900.00 | 56,516.60 | 5,500.00 | 63,437.00 | | 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.735 | MILE | 1,100.00 | 4,108.50 | 1,100.00 | 4,108.50 | 1,100.00 | 4,108.50 | 2,100.00 | 7,843.50 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 | 20,535.81 | 20,535.81 | 6,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,497,112.45 | | 2,628,184.19 | | 2,725,223.11 | | 3,081,531.79 |
|